29. EPMO Open Source Coordination Office Redaction File Detail Report

Produced by Araxis Merge on 4/23/2019 12:14:41 PM Central Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.

29.1 Files compared

# Location File Last Modified
1 C:\AraxisMergeCompare\Pri_un\CCRS\ccra-6.3.0\ccra-6.3.0\artifacts\Build_3\Sprint_1\docs Build 3 S1-3 T5 WIS v02.xlsx Wed Mar 20 03:15:56 2019 UTC
2 C:\AraxisMergeCompare\Pri_re\CCRS\ccra-6.3.0\ccra-6.3.0\artifacts\Build_3\Sprint_1\docs Build 3 S1-3 T5 WIS v02.xlsx Wed Apr 17 04:45:26 2019 UTC

29.2 Comparison summary

Description Between
Files 1 and 2
Text Blocks Lines
Unchanged 1 58
Changed 0 0
Inserted 0 0
Removed 0 0

29.3 Comparison options

Whitespace
Character case Differences in character case are significant
Line endings Differences in line endings (CR and LF characters) are ignored
CR/LF characters Not shown in the comparison detail

29.4 Active regular expressions

No regular expressions were active.

29.5 Comparison detail

  1   SHEET: She et1
  2   Index,Pre- Req,Priori ty,Points, Target Spr int,Swim L ane Text,W I Story Te xt,Accepta nce Text,T asks,
  3   1,1,3,1,Re ferral Sch ema & Pre- Authorizat ion change s,S5-CS023 -As a CCRS  Developer , I need t o continue  to synchr onize the  CCRS Refer ral schema  with the  changing C CRA schema , includin g notifica tion of ot her intern al CCRS te ams, so th at CCRS ca n continue  to proces s new and  update ref errals fro m CCRA.,At  end of sp rint, the  most recen t JSON fil e sent by  CCRA, with  new schem a changes,  can still  be import ed into CC RS.,Schema  changes,  Java chang es, Unit T ests, Deve loper Test ing, Inter -Team coor dination,  Review of  CCRS nneds  w/r/t CCR A, Communi cations wi th CCRA on  prioritie s, Documen tation cha nges, TC,  TS, TE, De mo Prep, B A Review,
  4   2,1,5,3,2, Referral S chema & Pr e-Authoriz ation chan ges,S5-CS0 23-As a CC RS Develop er, I need  to contin ue to sync hronize th e CCRS Ref erral sche ma with th e changing  CCRA sche ma, includ ing notifi cation of  other inte rnal CCRS  teams, so  that CCRS  can contin ue to proc ess new an d update r eferrals f rom CCRA., At end of  sprint, th e most rec ent JSON f ile sent b y CCRA, wi th new sch ema change s, can sti ll be impo rted into  CCRS.,Sche ma changes , Java cha nges, Unit  Tests, De veloper Te sting, Int er-Team co ordination , Review o f CCRS nne ds w/r/t C CRA, Commu nications  with CCRA  on priorit ies, Docum entation c hanges, TC , TS, TE,  Demo Prep,  BA Review ,
  5   3,2,10,3,3 ,Referral  Schema & P re-Authori zation cha nges,S5-CS 023-As a C CRS Develo per, I nee d to conti nue to syn chronize t he CCRS Re ferral sch ema with t he changin g CCRA sch ema, inclu ding notif ication of  other int ernal CCRS  teams, so  that CCRS  can conti nue to pro cess new a nd update  referrals  from CCRA. ,At end of  sprint, t he most re cent JSON  file sent  by CCRA, w ith new sc hema chang es, can st ill be imp orted into  CCRS.,Sch ema change s, Java ch anges, Uni t Tests, D eveloper T esting, In ter-Team c oordinatio n, Review  of CCRS nn eds w/r/t  CCRA, Comm unications  with CCRA  on priori ties, Docu mentation  changes, T C, TS, TE,  Demo Prep , BA Revie w,
  6   4,6,3,1.5, Referral S chema & Pr e-Authoriz ation chan ges,S5-CS0 23-As a CC RS Develop er, I need  to implem ent connec tivity fro m CCRA to  a higher e nvironment  in CCRS ( SQA) so th at testing  data is a vailable., At the end  of sprint , we have  connectivi ty between  existing  CCRA SQA e nvironment  and the m atching CC RS SQA env ironment.  Risk: CCRA  not achie ving appro val for co nnectivity  of produc tion data  from TIC t o AITC,Coo rdination  with CCRA/ TIC (far s ide), Coor dination w ith ESE/AI TC (local  side), Coo rdination  with ESCCB  (special  network co nnection e xceptions  - tunnel/v pn VA to c loud), SFT P configur ation, Lin ux account  creation,  Connectio n troubles hooting, D ocumentati on, TC, TS , TE, Demo  Prep, BA  Review,
  7   5,4,11,5,3 ,Referral  Schema & P re-Authori zation cha nges,S5-CS 023-As a C CRS Develo per, I nee d to imple ment conne ctivity fr om CCRA to  the highe st environ ments in C CRS (PP, P rod) so th at testing  and produ ction data  is availa ble.,At th e end of s print, we  have conne ctivity be tween exis ting CCRA  PP/Prod en vironments  and the m atching CC RS PP/Prod  environme nts. Risk:  CCRA not  achieving  approval f or connect ivity of p roduction  data from  TIC to AIT C,
  8   6,2,3,1,Re place simp le duplica te removal  w/ Referr al Status/ Update tra cking (Tea m 4 to use  version i n effect o n “date of  service”  of line it em),S5-CS0 23-As a CC RS Develop er, I need  to design  the schem a changes  to handle  Referral u pdates sen t from CCR A (additio n/removal  of content , correcti ons, cance llations)  so that th e  busines s rules en gine has a vailable i nformation  from the  referral t hat was in  effect at  the time  of treatme nt.,At the  end of th e sprint t he  ICD is  updated., Plan for S chema chan ges, Plan  for Java c hanges, In ter-Team c oordinatio n, Documen tation cha nges, TC,  TS, TE, De mo Prep, B A Review,
  9   7,6,7,8,2, Replace si mple dupli cate remov al w/ Refe rral Statu s/Update t racking (T eam 4 to u se version  in effect  on “date  of service ” of line  item),S5-C S023-As a  CCRS Devel oper, I ne ed to impl ement the  schema cha nges to ha ndle Refer ral update s sent fro m CCRA (ad dition/rem oval of co ntent, cor rections,  cancellati ons), as w ell as the  initial J ava code c hanges, so  that the   business  rules engi ne has ava ilable inf ormation f rom the re ferral tha t was in e ffect at t he time of  treatment .,At the e nd of the  sprint, we  can show  that we im port all u pdates to  referrals  and use a  multi-colu mn key for  uniquenes s. We also  show the  date range s differen t versions  of Referr als are in  effect fo r.,
  10   8,7,12,5,3 ,Replace s imple dupl icate remo val w/ Ref erral Stat us/Update  tracking ( Team 4 to  use versio n in effec t on “date  of servic e” of line  item),S5- CS023-As a  CCRS Deve loper, I n eed to com plete the  Java code  changes to  handle Re ferral upd ates sent  from CCRA  (addition/ removal of  content,  correction s, cancell ations) so  that the   business  rules engi ne has ava ilable inf ormation f rom the re ferral tha t was in e ffect at t he time of  treatment .,At the e nd of the  sprint, we  work with  the Busin ess Rules  engine tea m (Team 4)  to show t hat the re ferral in  effect for  the right  time peri od is prop erly check ed based o n the serv ice date o f the proc edure perf ormed for  the patien t.,
  11   9,3,5,1,In terface Or chestratio n / Integr ation w/ T eam 4,S5-C S009-As a  CCRS Devel oper, I ne ed to desi gn and dev elop a pro of-of-conc ept Kafka  implementa tion to op timize the  orchestra tion of ex ternal dat a aggregat ion into t he CCRS da tabase so  that CCRS  can meet t he target  of nominal  24 hour t urnaround  from recei ving EDI d ata to not ifying the  responsib le party t hat paymen t is appro ved.,At th e end of t he sprint,  we show t hat Kafka  is able to  schedule  work and t ransition  from one c omponent t o another. ,Installat ion, Confi guration,  Deployment , Integrat ion librar y, Integra tion with  an existin g Interfac e, Unit Te sts, Devel oper Testi ng, Docume ntation, T C, TS, TE,  Demo Prep , BA Revie w,
  12   10,9?,8,3, 1.5,Interf ace Orches tration /  Integratio n w/ Team  4,S5-CS009 -As a CCRS  Developer , I need t o design t he initial  granulari ty pattern  for Kafka  so that C CRS Interf ace design ers can pr operly lin k their co de into th e Kafka co ntrol logi c so that  CCRS can m eet the ta rget of no minal 24 h our turnar ound from  receiving  EDI data t o notifyin g the resp onsible pa rty that p ayment is  approved., At the end  of the sp rint, we s how that K afka is se nding, rec eiving and  tracking  message qu eues at th e target g ranularity .,Inter-Te am coordin ation, int erface mod ification,  configura tion, depl oyment, de veloper te sting, doc umentation , TC, TS,  TE, Demo P rep, BA Re view,
  13   11,10,13,5 ,3,Interfa ce Orchest ration / I ntegration  w/ Team 4 ,S5-CS009- As a CCRS  Developer,  I need to  implement  control l ogic for K afka in CC RA so that  CCRS can  meet the t arget of n ominal 24  hour turna round from  receiving  EDI data  to notifyi ng the res ponsible p arty that  payment is  approved. ,At the en d of the s print, we  show that  Kafka is p ushing mes sages into  the ccrab atch java  code which  the ccrab atch java  code uses  as a work  queue.,
  14   12,11,14,3 ,3,Interfa ce Orchest ration / I ntegration  w/ Team 4 ,S5-CS009- As a CCRS  Developer,  I need to  document  configurat ion of ccr abatch in  Kafka so t hat the VA  can insta ll/configu re Kafka a nd that CC RS can mee t the targ et of nomi nal 24 hou r turnarou nd from re ceiving ED I data to  notifying  the respon sible part y that pay ment is ap proved.,At  the end o f the spri nt, show o ur contrib utions to  the Kafka  installati on guide.,
  15   13,12,15,3 ,3,Interfa ce Orchest ration / I ntegration  w/ Team 4 ,S5-CS009- As a CCRS  Developer,  I need to  deploy Ka fka and th e ccrabatc h configur ation to S QA so that  the we ca n test the  installat ion guide  and  so th at CCRS ca n meet the  target of  nominal 2 4 hour tur naround fr om receivi ng EDI dat a to notif ying the r esponsible  party tha t payment  is approve d.,At the  end of the  sprint, s how Kafka  and CCRA p roperly in teracting  in SQA.,
  16   14,4,3,1,E merging is sue: SEOC  v2 – More  formal SEO C schema c oming,S5-C S023-As a  CCRS Devel oper, I wa nt to prot otype the  [SEOC] sch ema in CCR S so that  we are mor e prepared  for devel oping a co nnection t o the SEOC  repositor y when it  comes onli ne.,At the  end of th e sprint,  show new S EOC schema  in DB.,Do cumentatio n, Communi cations wi th CCRA, C ommunicati ons with S EOC repres entatives,  Schema pr ototype, p rototype i mplementat ion, Inter -team revi ew, docume ntation, T C, TS, TE,  Demo Prep , BA Revie w,
  17   15,14,9,3, 2,Emerging  issue: SE OC v2 – Mo re formal  SEOC schem a coming,S 5-CS023-As  a CCRS De veloper, I  want to f urther dev elop the [ SEOC] sche ma in CCRS  so that w e are more  prepared  for develo ping a con nection to  the SEOC  repository  when it c omes onlin e.,At the  end of the  sprint, s how update s to SEOC  schema in  DB.,
  18   16,15,16,3 ,3,Emergin g issue: S EOC v2 – M ore formal  SEOC sche ma coming, S5-CS023-A s a CCRS D eveloper,  I want to  further de velop the  [SEOC] sch ema in CCR S so that  we are mor e prepared  for devel oping a co nnection t o the SEOC  repositor y when it  comes onli ne.,At the  end of th e sprint,  show updat es to SEOC  schema in  DB.,
  19   21,Emergin g issue: p re-certifi cation/pre -approval  – source o f data (se parate fro m current  CCRA pre-a uthorizati on block w hich is a  subset of  the SEOC),
  20   22,Emergin g issue: p re-certifi cation/pre -approval  – source o f data (se parate fro m current  CCRA pre-a uthorizati on block w hich is a  subset of  the SEOC),
  21   23,Emergin g issue: p re-certifi cation/pre -approval  – source o f data (se parate fro m current  CCRA pre-a uthorizati on block w hich is a  subset of  the SEOC),
  22   24,Emergin g issue: p re-certifi cation/pre -approval  – source o f data (se parate fro m current  CCRA pre-a uthorizati on block w hich is a  subset of  the SEOC),
  23   25,Emergin g issue: p re-certifi cation/pre -approval  – source o f data (se parate fro m current  CCRA pre-a uthorizati on block w hich is a  subset of  the SEOC),
  24  
  25  
  26   SHEET: She et2
  27  
  28  
  29   SHEET: She et3