Produced by Araxis Merge on 6/22/2018 1:30:49 PM Central Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.
| # | Location | File | Last Modified |
|---|---|---|---|
| 1 | Fri Jun 22 18:30:48 2018 UTC | ||
| 2 | v1603_release_60.zip\Docs | 176797 - 620799_ Ability to run a Report at a later date.docx | Thu Jun 21 15:31:16 2018 UTC |
| Description | Between Files 1 and 2 |
|
|---|---|---|
| Text Blocks | Lines | |
| Unchanged | 0 | 0 |
| Changed | 0 | 0 |
| Inserted | 1 | 77 |
| Removed | 0 | 0 |
| Whitespace | |
|---|---|
| Character case | Differences in character case are significant |
| Line endings | Differences in line endings (CR and LF characters) are ignored |
| CR/LF characters | Not shown in the comparison detail |
No regular expressions were active.
| 1 | 176797: 62 0799: Abil ity to run a Report at a later date | |||||
| 2 | ||||||
| 3 | Creation D ate: Apr 30, 2018 1 2:10:50 PM (UTC-05:0 0)Last Mod ified: Apr 30, 2018 12:12:21 P M (UTC-05: 00) | |||||
| 4 | ||||||
| 5 | State: Dra ft | |||||
| 6 | Originator : Gibbons , Joel D. (Booz Alle n Hamilton )Owner: Ty pe: Manual | |||||
| 7 | Test Data: Unassigne d | |||||
| 8 | ||||||
| 9 | Descriptio n: 620799 : Ability to run a R eport at a later dat e | |||||
| 10 | ||||||
| 11 | Summary | |||||
| 12 | ||||||
| 13 | Categories | |||||
| 14 | Function: Unassigned | |||||
| 15 | Test Phase : Integrat ion Test | |||||
| 16 | ||||||
| 17 | Formal Rev iew | |||||
| 18 | ||||||
| 19 | ||||||
| 20 | General Co mments | |||||
| 21 | ||||||
| 22 | Manual Ste ps | |||||
| 23 | ||||||
| 24 | ||||||
| 25 | Step 1 | |||||
| 26 | Execution Step | |||||
| 27 | ||||||
| 28 | Descriptio n* | |||||
| 29 | ||||||
| 30 | PA | |||||
| 31 | Click Repo rts | |||||
| 32 | Select a r eport | |||||
| 33 | Click Sche dule Repor t | |||||
| 34 | Choose On a Schedule | |||||
| 35 | ||||||
| 36 | Verify the system gi ves you op tions to r un once, h ourly, dai ly, weekly , or month ly | |||||
| 37 | ||||||
| 38 | Select Onc e, set sta rt time 10 minutes f rom now, c lick Next until you create the schedule. | |||||
| 39 | Click Fini sh | |||||
| 40 | Refresh th e reports grid | |||||
| 41 | 9. Verify the Schedu led Snapsh ot report | |||||
| 42 | has been a dded to th e grid for the repor t you sele cted | |||||
| 43 | ||||||
| 44 | ||||||
| 45 | ||||||
| 46 | 10. Click the blue a rrow to th e left of the | |||||
| 47 | new Report . Verify i t says "No snapshots available " | |||||
| 48 | ||||||
| 49 | Expected R esults | |||||
| 50 | Able to se t up a sch eduled rep ort Commen ts | |||||
| 51 | Validates | |||||
| 52 | ||||||
| 53 | Attachment s | |||||
| 54 | ||||||
| 55 | ||||||
| 56 | Step 2 | |||||
| 57 | Execution Step | |||||
| 58 | ||||||
| 59 | Descriptio n* | |||||
| 60 | ||||||
| 61 | PA | |||||
| 62 | Wait (for the schedu led time t o pass) | |||||
| 63 | ||||||
| 64 | Click the blue arrow to the le ft of the new Report . | |||||
| 65 | Verify it lists the Snapshot a nd the dat e/ time it ran | |||||
| 66 | ||||||
| 67 | Click the Snapshot d isplayed. Verify th e report i s presente d and avai lable for printing. | |||||
| 68 | Expected R esults | |||||
| 69 | Scheduled report run s and can be viewed Comments | |||||
| 70 | Validates | |||||
| 71 | ||||||
| 72 | Attachment s | |||||
| 73 | ||||||
| 74 | Associated E-Signatu res | |||||
| 75 | ||||||
| 76 | ||||||
| 77 | SignedActi onSignerCo mmentAddit ional Info rmation |
Araxis Merge (but not the data content of this report) is Copyright © 1993-2016 Araxis Ltd (www.araxis.com). All rights reserved.