Produced by Araxis Merge on 6/12/2018 11:43:17 AM Eastern Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.
| # | Location | File | Last Modified |
|---|---|---|---|
| 1 | VPR_1_7.zip\VPR_1_7 | VPR_1_7 Primary Developer Checklist.docx | Wed Apr 25 17:58:04 2018 UTC |
| 2 | VPR_1_7.zip\VPR_1_7 | VPR_1_7 Primary Developer Checklist.docx | Fri Jun 8 20:17:35 2018 UTC |
| Description | Between Files 1 and 2 |
|
|---|---|---|
| Text Blocks | Lines | |
| Unchanged | 1 | 218 |
| Changed | 0 | 0 |
| Inserted | 0 | 0 |
| Removed | 0 | 0 |
| Whitespace | |
|---|---|
| Character case | Differences in character case are significant |
| Line endings | Differences in line endings (CR and LF characters) are ignored |
| CR/LF characters | Not shown in the comparison detail |
No regular expressions were active.
| 1 | Primary De veloper Re view Check list | |
| 2 | ||
| 3 | Department of Vetera ns Affairs | |
| 4 | February 2 017 | |
| 5 | Version 1. 0 | |
| 6 | ||
| 7 | Revision H istory | |
| 8 | Date | |
| 9 | Version | |
| 10 | Descriptio n | |
| 11 | Author | |
| 12 | ||
| 13 | ||
| 14 | ||
| 15 | ||
| 16 | ||
| 17 | ||
| 18 | ||
| 19 | ||
| 20 | M Code Pri mary Devel oper’s Che cklist | |
| 21 | Use this c hecklist t o complete the prima ry develop er’s activ ities incl uding any additional items dir ected by y our Develo pment Mana ger or Tea m Leader. | |
| 22 | It is the developer’ s responsi bility to complete t he checkli st and ass ure that i s sent to the Projec t Manager. | |
| 23 | If a new t est versio n is requi red to add ress issue s identifi ed by revi ews or tes ting, a ne w Primary Developer Checklist, along wit h other it ems listed in item 1 1, will be resubmitt ed to the Project Ma nager. | |
| 24 | Patch Numb er and Ide ntity of R esponsible Person | |
| 25 | Test Versi on and Dat e Complete d | |
| 26 | Patch Numb er: VPR*1 .0*7 | |
| 27 | Test Versi on: v1 | |
| 28 | Completed by: Melani e Buechler | |
| 29 | Date Check list Compl eted: 2/2/ 2018 | |
| 30 | ||
| 31 | # | |
| 32 | Primary De veloper’s Checklist | |
| 33 | OK/NA | |
| 34 | Entry of NA Require s Comments | |
| 35 | 1 | |
| 36 | Request an d receive approval f rom the DB A for all Data Dicti onary (DD) changes b efore the patch is s ent to SQA . Submissi ons for Da ta Diction ary approv als are se nt to VA O IT OED Vis tA DBA. | |
| 37 | NA | |
| 38 | No DD chan ges | |
| 39 | 2 | |
| 40 | Request an d receive approval f or all new or update d Integrat ion Contro l Registra tions (ICR s) before the patch is sent to SQA. Sub missions f or ICR app roval are sent to OI T PD Integ ration Con trol Regis trations. | |
| 41 | NA | |
| 42 | No new ICR s | |
| 43 | 3 | |
| 44 | Request an d receive approval f rom the HL 7 Messagin g Coordina tor, if ap plicable, before the patch is sent to SQ A. Submis sions for HL7 Messag ing approv al are sen t to VA OI T PD ADC T A Messagin g Administ ration. | |
| 45 | NA | |
| 46 | No HL7 | |
| 47 | 4 | |
| 48 | Review all necessary component s of the p atch for c ompliance with the D epartment of Veteran s Affairs M Programm ing Standa rds and Co nventions (SAC). | |
| 49 | OK | |
| 50 | ||
| 51 | 5 | |
| 52 | Run ^XINDE X before c reating th e build an d check fo r errors t hat might be reporte d. You may want to o ptionally run ^%RCHE CK. | |
| 53 | OK | |
| 54 | ||
| 55 | 6 | |
| 56 | Validate t hat Requir ed Builds are proper ly documen ted in the KIDS Buil d and list ed as Asso ciated Pat ches in th e National Patch Mod ule entry. For exam ples, refe rence the National P atch Modul e Patch Te mplate pro vided in P roPath. | |
| 57 | OK | |
| 58 | ||
| 59 | 7 | |
| 60 | Some appli cations li ke Kernel, FileMan, CMOP, and others are installed in non-ty pical VIST A Instance s that do not run al l VISTA ap plications . As a res ult, their patches c annot be b undled wit h other ap plication builds. | |
| 61 | ||
| 62 | If this is a multi-p roduct rel ease, conf irm that t his build does not i nclude pat ches that cannot be bundled. | |
| 63 | ||
| 64 | NA | |
| 65 | Not multi- product | |
| 66 | 8 | |
| 67 | Update the National Patch Modu le with al l necessar y informat ion and la test build . | |
| 68 | OK | |
| 69 | ||
| 70 | 9 | |
| 71 | Install th e patch fr om the Nat ional Patc h Module i n another account to verify th e build in stalls cor rectly. T his includ es, but is not limit ed to, the following items: | |
| 72 | No errors upon insta llation. | |
| 73 | Environmen t Checks a re success ful. | |
| 74 | Pre-Instal lation Rou tines are successful . | |
| 75 | Post Insta llation Ch ecksums ma tch the Na tional Pat ch Module patch desc ription. | |
| 76 | ^DDs are u pdated cor rectly. | |
| 77 | Menus and Options ar e updated correctly. | |
| 78 | Other comp onents are installed correctly . | |
| 79 | Data Conve rsions are successfu l. | |
| 80 | Post Insta llation fu nctions ar e successf ul. | |
| 81 | ad hoc tes ting of af fected pac kage optio ns and fun ctions per formed aft er install ation is s uccessful. | |
| 82 | OK | |
| 83 | ||
| 84 | 10 | |
| 85 | Validate t hat the in stallation instructi ons are ac curate in the Instal lation Gui de and/or Patch Desc ription. | |
| 86 | OK | |
| 87 | ||
| 88 | 11 | |
| 89 | Create the patch-tra cking mess age on FOR UM. Includ e the test sites, SQ A Analyst, the OED R elease Coo rdinator, and other team membe rs. | |
| 90 | ||
| 91 | ||
| 92 | 12 | |
| 93 | Complete t he Product Component Testing p hase, incl uding a te st of all modificati ons. | |
| 94 | A capture of the tes t results is require d. A copy is submit ted to the Project M anager and if reques ted to SQA . | |
| 95 | ||
| 96 | ||
| 97 | 13 | |
| 98 | Upon compl etion, the following items wil l be submi tted to th e Project Manager vi a Outlook: | |
| 99 | Primary De veloper Ch ecklist | |
| 100 | FORUM Patc h Tracking Message N umber | |
| 101 | Data Dicti onary Appr oval Messa ge | |
| 102 | Location o f the host file, if being rele ased via a host file | |
| 103 | Installati on Guide ( when appli cable) | |
| 104 | HL7 Messag ing Approv al (when a pplicable) | |
| 105 | OED Testin g Service Report (wh en applica ble) | |
| 106 | ||
| 107 | The Projec t Manager will notif y SQA that the patch is ready for review via Outlo ok. | |
| 108 | OK | |
| 109 |
Araxis Merge (but not the data content of this report) is Copyright © 1993-2016 Araxis Ltd (www.araxis.com). All rights reserved.