3. EPMO Open Source Coordination Office Redaction File Detail Report

Produced by Araxis Merge on 6/12/2018 11:43:17 AM Eastern Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.

3.1 Files compared

# Location File Last Modified
1 VPR_1_7.zip\VPR_1_7 VPR_1_7 Primary Developer Checklist.docx Wed Apr 25 17:58:04 2018 UTC
2 VPR_1_7.zip\VPR_1_7 VPR_1_7 Primary Developer Checklist.docx Fri Jun 8 20:17:35 2018 UTC

3.2 Comparison summary

Description Between
Files 1 and 2
Text Blocks Lines
Unchanged 1 218
Changed 0 0
Inserted 0 0
Removed 0 0

3.3 Comparison options

Whitespace
Character case Differences in character case are significant
Line endings Differences in line endings (CR and LF characters) are ignored
CR/LF characters Not shown in the comparison detail

3.4 Active regular expressions

No regular expressions were active.

3.5 Comparison detail

  1   Primary De veloper Re view Check list
  2  
  3   Department  of Vetera ns Affairs
  4   February 2 017
  5   Version 1. 0
  6  
  7   Revision H istory
  8   Date
  9   Version
  10   Descriptio n
  11   Author
  12  
  13  
  14  
  15  
  16  
  17  
  18  
  19  
  20   M Code Pri mary Devel oper’s Che cklist
  21   Use this c hecklist t o complete  the prima ry develop er’s activ ities incl uding any  additional  items dir ected by y our Develo pment Mana ger or Tea m Leader.
  22   It is the  developer’ s responsi bility to  complete t he checkli st and ass ure that i s sent to  the Projec t Manager.  
  23   If a new t est versio n is requi red to add ress issue s identifi ed by revi ews or tes ting, a ne w Primary  Developer  Checklist,  along wit h other it ems listed  in item 1 1, will be  resubmitt ed to the  Project Ma nager.
  24   Patch Numb er and Ide ntity of R esponsible  Person
  25   Test Versi on and Dat e Complete d
  26   Patch Numb er:  VPR*1 .0*7
  27   Test Versi on:  v1
  28   Completed  by: Melani e Buechler
  29   Date Check list Compl eted: 2/2/ 2018
  30  
  31   #
  32   Primary De veloper’s  Checklist
  33   OK/NA 
  34   Entry of   NA Require s Comments
  35   1
  36   Request an d receive  approval f rom the DB A for all  Data Dicti onary (DD)  changes b efore the  patch is s ent to SQA . Submissi ons for Da ta Diction ary approv als are se nt to VA O IT OED Vis tA DBA.
  37   NA
  38   No DD chan ges
  39   2
  40   Request an d receive  approval f or all new  or update d Integrat ion Contro l Registra tions (ICR s) before  the patch  is sent to  SQA.  Sub missions f or ICR app roval are  sent to OI T PD Integ ration Con trol Regis trations.
  41   NA
  42   No new ICR s
  43   3
  44   Request an d receive  approval f rom the HL 7 Messagin g Coordina tor, if ap plicable,  before the  patch is  sent to SQ A.  Submis sions for  HL7 Messag ing approv al are sen t to VA OI T PD ADC T A Messagin g Administ ration.
  45   NA
  46   No HL7
  47   4
  48   Review all  necessary  component s of the p atch for c ompliance  with the D epartment  of Veteran s Affairs  M Programm ing Standa rds and Co nventions  (SAC).
  49   OK
  50  
  51   5
  52   Run ^XINDE X before c reating th e build an d check fo r errors t hat might  be reporte d. You may  want to o ptionally  run ^%RCHE CK.
  53   OK
  54  
  55   6
  56   Validate t hat Requir ed Builds  are proper ly documen ted in the  KIDS Buil d and list ed as Asso ciated Pat ches in th e National  Patch Mod ule entry.   For exam ples, refe rence the  National P atch Modul e Patch Te mplate pro vided in P roPath.
  57   OK
  58  
  59   7
  60   Some appli cations li ke Kernel,  FileMan,  CMOP, and  others are  installed  in non-ty pical VIST A Instance s that do  not run al l VISTA ap plications . As a res ult, their  patches c annot be b undled wit h other ap plication  builds.
  61  
  62   If this is  a multi-p roduct rel ease, conf irm that t his build  does not i nclude pat ches that  cannot be  bundled.
  63  
  64   NA
  65   Not multi- product
  66   8
  67   Update the  National  Patch Modu le with al l necessar y informat ion and la test build .
  68   OK
  69  
  70   9
  71   Install th e patch fr om the Nat ional Patc h Module i n another  account to  verify th e build in stalls cor rectly.  T his includ es, but is  not limit ed to, the  following  items:
  72   No errors  upon insta llation.
  73   Environmen t Checks a re success ful. 
  74   Pre-Instal lation Rou tines are  successful .
  75   Post Insta llation Ch ecksums ma tch the Na tional Pat ch Module  patch desc ription.
  76   ^DDs are u pdated cor rectly.
  77   Menus and  Options ar e updated  correctly.
  78   Other comp onents are  installed  correctly .
  79   Data Conve rsions are  successfu l.
  80   Post Insta llation fu nctions ar e successf ul.
  81   ad hoc tes ting of af fected pac kage optio ns and fun ctions per formed aft er install ation is s uccessful.
  82   OK
  83  
  84   10
  85   Validate t hat the in stallation  instructi ons are ac curate in  the Instal lation Gui de and/or  Patch Desc ription.
  86   OK
  87  
  88   11
  89   Create the  patch-tra cking mess age on FOR UM. Includ e the test  sites, SQ A Analyst,  the OED R elease Coo rdinator,  and other  team membe rs.
  90  
  91  
  92   12
  93   Complete t he Product  Component  Testing p hase, incl uding a te st of all  modificati ons.  
  94   A capture  of the tes t results  is require d.  A copy  is submit ted to the  Project M anager and  if reques ted to SQA .
  95  
  96  
  97   13
  98   Upon compl etion, the  following  items wil l be submi tted to th e Project  Manager vi a Outlook:
  99   Primary De veloper Ch ecklist 
  100   FORUM Patc h Tracking  Message N umber
  101   Data Dicti onary Appr oval Messa ge
  102   Location o f the host  file, if  being rele ased via a  host file
  103   Installati on Guide ( when appli cable)
  104   HL7 Messag ing Approv al (when a pplicable)
  105   OED Testin g Service  Report (wh en applica ble)
  106  
  107   The Projec t Manager  will notif y SQA that  the patch  is ready  for review  via Outlo ok.
  108   OK
  109