Produced by Araxis Merge on 1/31/2018 10:47:34 AM Eastern Standard Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.
| # | Location | File | Last Modified |
|---|---|---|---|
| 1 | TBIe_Phase2 _Build 3.zip\TBIe Phase2 Build 3 | HRE - TBIe Phase 2 Release v3.3.16 Build Plan f.xlsx | Thu Jan 11 12:29:12 2018 UTC |
| 2 | TBIe_Phase2 _Build 3.zip\TBIe Phase2 Build 3 | HRE - TBIe Phase 2 Release v3.3.16 Build Plan f.xlsx | Tue Jan 30 21:05:12 2018 UTC |
| Description | Between Files 1 and 2 |
|
|---|---|---|
| Text Blocks | Lines | |
| Unchanged | 1 | 222 |
| Changed | 0 | 0 |
| Inserted | 0 | 0 |
| Removed | 0 | 0 |
| Whitespace | |
|---|---|
| Character case | Differences in character case are significant |
| Line endings | Differences in line endings (CR and LF characters) are ignored |
| CR/LF characters | Not shown in the comparison detail |
No regular expressions were active.
| 1 | SHEET: HRE - TBIe Ph ase 2 Rele ase v3.3 | |
| 2 | Id,Summary ,Plan Pare nt ID,Grou p,Work Ite m Type,Sta tus,Id,Imp lements Re quirement, Story Poin ts,Effecti ve Estimat e,Progress :Completed Story Poi nts,Progre ss:Total S tory Point s,Progress :Completed Hours,Pro gress:Tota l Hours, | |
| 3 | 560342,Def ect: Instr ument Repo rting Link Still Ava ilable To User When TBI Rehabi litation a nd Polytra uma Clinic ians Role Is NOT Ass igned,TBIe Phase 2 v 3.3.16 - S print 5,De fect,Resol ved,560342 ,1, | |
| 4 | 568489,Spr int 5 Retr ospective, TBIe Phase 2 v3.3.16 - Sprint 5,Retrospe ctive,Done ,568489, | |
| 5 | 510669,TBI e - Remova l of Unuse d TBI Role s in UI so urce and a ddition of new roles for repor ting,TBIe Phase 2 v3 .3.16 - Sp rint 5,Sto ry,Done,51 0669,90508 9: Create three new user roles (2 Primar y, 1 secon dary) to f acilitate the permis sions issu ed to user s for acce ss to TBI Instrument s, and the TBI regis try & repo rts.,2, | |
| 6 | 549161,Rem ove Unused TBI Roles in UI sou rce and ad d new role s for repo rting,5106 69,TBIe Ph ase 2 v3.3 .16 - Spri nt 5,Task, Done,54916 1, | |
| 7 | 559077,549 161 deploy ment,54916 1,TBIe Pha se 2 v3.3. 16 - Sprin t 5,Task,D one,559077 , | |
| 8 | 528311,TBI Instrumen ts -COMPRE HENSIVE TB I EVALUATI ON - In th e below sc reen shot Q4, 13, 14 and 21 ha s OND repe ated twice ,TBIe Phas e 2 v3.3.1 6 - Sprint 5,Story,D one,528311 ,915343: _ yNNyAWGDEe eiK6jnwZdQ 8Q,2, | |
| 9 | 528329,TBI Instrumen ts - REHAB ILITATION AND REINTE GRATION PL AN - For question 1 0 there is an option OEF/OIF c ase manage r; here it should be changed t o “OEF/OIF /OND",,TBI e Phase 2 v3.3.16 - Sprint 5", Story,Done ,528329,88 3924: Meth od to quer y and view follow up Rehabilit ation and Reintegrat ion Care P lans,1,-, | |
| 10 | 567555,TBI e - M2PI a nd CTBIE F orm Load a nd Save In dex was ou tside the bounds of the array error,TBIe Phase 2 v 3.3.16 - S print 5,De fect,Resol ved,567555 ,2, | |
| 11 | 583990,Spr int 6 Retr ospective, TBIe Phase 2 v3.3.16 - Sprint 6,Retrospe ctive,Done ,583990, | |
| 12 | 599811,Def ect: User Roles Not Saving,TBI e Phase 2 v3.3.16 - Sprint 6,D efect,Reso lved,59981 1, | |
| 13 | 582635,Def ect: Instr ument Form 7A Number ed Choices Not Cente red,TBIe P hase 2 v3. 3.16 - Spr int 6,Defe ct,Resolve d,582635,0 .5, | |
| 14 | 582687,Def ect: Instr ument Form Mobility Aid Number ed Choices Off Cente red,TBIe P hase 2 v3. 3.16 - Spr int 6,Defe ct,Resolve d,582687,0 .5, | |
| 15 | 571235,TBI e - Develo p PROMIS - Pain Inte rference S hort Form 6am Instru ment Form, TBIe Phase 2 v3.3.16 - Sprint 6,Story,Im plemented, 571235,928 734: New I nstrument - Pain Int erference - Short Fo rm 6a,8, | |
| 16 | 573211, SQ L creation for all q uestions a nd answers to the DB for the n ew Pain In terference Short For m 6a Instr ument,5712 35,TBIe Ph ase 2 v3.3 .16 - Spri nt 6,Task, Done,57321 1, | |
| 17 | 573214, We b UI creat ion for al l question s and answ ers for th e new Pain Interfere nce Short Form 6a In strument,5 71235,TBIe Phase 2 v 3.3.16 - S print 6,Ta sk,Done,57 3214,13, | |
| 18 | 571239,TBI e - Develo p PROMIS - Upper Extr emity Shor t Form 7A Instrument Form,TBIe Phase 2 v 3.3.16 - S print 6,St ory,Implem ented,5712 39,928736: New Instr ument - Up per Extrem ity – Shor t Form 7a, 8, | |
| 19 | 573231,SQL creation to create all form q uestions a nd answers for the n ew Upper E xtremity – Short For m 7a Instr ument,5712 39,TBIe Ph ase 2 v3.3 .16 - Spri nt 6,Task, Done,57323 1, | |
| 20 | 573234,Web UI creati on for all questions and answe rs from fo r the new Upper Extr emity Shor t Form 7a Instrument ,571239,TB Ie Phase 2 v3.3.16 - Sprint 6, Task,Done, 573234,13, | |
| 21 | 571241,TBI e - Develo p PROMIS - Physical Function w ith Mobili ty Aid Ins trument Fo rm,TBIe Ph ase 2 v3.3 .16 - Spri nt 6,Story ,Implement ed,571241, 928737: Ne w Instrume nt - Physi cal Functi on w Mobil ity Aid,8, | |
| 22 | 573219,SQL creation to create all form q uestions a nd answers for the n ew Physica l Function w Mobilit y Aid Inst rument,571 241,TBIe P hase 2 v3. 3.16 - Spr int 6,Task ,Done,5732 19, | |
| 23 | 573223,Web UI creati on for all questions and answe rs from fo r the new Physical F unction w Mobility A id Instrum ent,571241 ,TBIe Phas e 2 v3.3.1 6 - Sprint 6,Task,Do ne,573223, 13, | |
| 24 | 571242,TBI e - Create New Field s on PGIC Instrument Form,TBIe Phase 2 v 3.3.16 - S print 6,St ory,Done,5 71242,9287 38: Update Instrumen t - Patien t Global I mpressions of Change (PGIC),3, | |
| 25 | 573206,Cre ate SQL Sc ripts to a dd New Que stions and Answers t o PGIC Ins trument,57 1242,TBIe Phase 2 v3 .3.16 - Sp rint 6,Tas k,Done,573 206, | |
| 26 | 573208,UI Editing to add the n ew PGIC In strument f orm questi ons and an swers to t he website .,571242,T BIe Phase 2 v3.3.16 - Sprint 6 ,Task,Done ,573208,5, | |
| 27 | 571245,TBI e - Merge R15 SUS Co de with la test HRE T BI code,TB Ie Phase 2 v3.3.16 - Sprint 6, Task,Done, 571245, | |
| 28 | 582544,Def ect: Instr ument Form 6A Draft not Saving ,TBIe Phas e 2 v3.3.1 6 - Sprint 6,Defect, Resolved,5 82544,2, | |
| 29 | 582550,Def ect: Instr ument Form 6A Save a nd Prepare Note,TBIe Phase 2 v 3.3.16 - S print 6,De fect,Resol ved,582550 ,2, | |
| 30 | 582639,Def ect: Instr ument Form 7A Save D raft Value s Not Savi ng,TBIe Ph ase 2 v3.3 .16 - Spri nt 6,Defec t,Resolved ,582639, | |
| 31 | 582643,Def ect: Instr ument Form 7A TBI Su rvey Summa ry Page No t Displayi ng Results ,TBIe Phas e 2 v3.3.1 6 - Sprint 6,Defect, Resolved,5 82643,2, | |
| 32 | 582646,Def ect: Instr ument Form 7A Answer s on Instr ument Form Being Rev erted To A Different Choice,TB Ie Phase 2 v3.3.16 - Sprint 6, Defect,Res olved,5826 46, | |
| 33 | 582692,Def ect: Instr ument Form Mobility Aid Raw Sc ore Not Be ing Calcul ated,TBIe Phase 2 v3 .3.16 - Sp rint 6,Def ect,Resolv ed,582692, | |
| 34 | 582698,Def ect: Instr ument Form Mobility Aid Clicki ng Cancel After Savi ng and Pre paring Not e Reverts Choices,TB Ie Phase 2 v3.3.16 - Sprint 6, Defect,Res olved,5826 98,2.5, | |
| 35 | 582700,Def ect: Instr ument Form Mobility Aid Note T ype Greyed Out,TBIe Phase 2 v3 .3.16 - Sp rint 6,Def ect,Resolv ed,582700, | |
| 36 | 500562,TBI e - 508 co mpliance,T BIe Phase 2 v3.3.16 - Sprint 6 ,Story,In Progress,5 00562,8973 04: 508.01 .02.03 Web Applicati on Color ( 1194.22C) 897301: 50 8.01.02.15 Web Appli cation Ski p Navigati on (1194.2 2O) 897266 : 508.01 C ompliance to Section 508 Techn ical Stand ards 89729 1: 508.01. 01.09 Soft ware Appli cation Col or Coding (1194.21I) 897294: 5 08.01.01.0 1 Software Applicati on Keyboar d Access ( 1194.21A) 897280: 50 8.01.02.05 Web Appli cation Ser ver Side I mage Maps (1194.22E) 897284: 5 08.01.02.0 1 Web Appl ication Te xt Equival ents (1194 .22A) 8972 53: 508.01 .01.02 Sof tware Appl ication Ac cessibilit y Features API (1194 .21) 89730 0: 508.01. 01.12 Soft ware Appli cation For ms (1194.2 1L) 897306 : 508.01.0 2.04 Web A pplication Documents (1194.22D ),3, | |
| 37 | 500568,TBI e - Fortif y Complian ce,TBIe Ph ase 2 v3.3 .16 - Spri nt 6,Task, Done,50056 8, | |
| 38 | 507379,Com plete Fort ify Scan o n current code base ( Task of 500568 ),5 00568,TBIe Phase 2 v 3.3.16 - S print 6,Ta sk,Done,50 7379,2, | |
| 39 | 584761,Def ect: PROMI S - Pain I nterferenc e Short - Form 6A: R esponses s hould be Q uite a bit "",TBIe Ph ase 2 v3.3 .16 - Spri nt 7,Defec t,Resolved ,584761, | |
| 40 | 584767,Def ect: PROMI S - Physic al Functio n with Mob ility Aid: Response selections are in re verse orde r,TBIe Pha se 2 v3.3. 16 - Sprin t 7,Defect ,Resolved, 584767, | |
| 41 | 600386,Def ect: Rehab and Reint egration P lan Questi on 10 has OEF/OIF/ON C and not OEF/OIF/ON D,TBIe Pha se 2 v3.3. 16 - Sprin t 7,Defect ,New,60038 6, | |
| 42 | 571235,TBI e - Develo p PROMIS - Pain Inte rference S hort Form 6am Instru ment Form, TBIe Phase 2 v3.3.16 - Sprint 7,Story,Im plemented, 571235,928 734: New I nstrument - Pain Int erference - Short Fo rm 6a,8, | |
| 43 | 573211, SQ L creation for all q uestions a nd answers to the DB for the n ew Pain In terference Short For m 6a Instr ument,5712 35,TBIe Ph ase 2 v3.3 .16 - Spri nt 7,Task, Done,57321 1, | |
| 44 | 573214, We b UI creat ion for al l question s and answ ers for th e new Pain Interfere nce Short Form 6a In strument,5 71235,TBIe Phase 2 v 3.3.16 - S print 7,Ta sk,Done,57 3214,13, | |
| 45 | 571239,TBI e - Develo p PROMIS - Upper Extr emity Shor t Form 7A Instrument Form,TBIe Phase 2 v 3.3.16 - S print 7,St ory,Implem ented,5712 39,928736: New Instr ument - Up per Extrem ity – Shor t Form 7a, 8, | |
| 46 | 573231,SQL creation to create all form q uestions a nd answers for the n ew Upper E xtremity – Short For m 7a Instr ument,5712 39,TBIe Ph ase 2 v3.3 .16 - Spri nt 7,Task, Done,57323 1, | |
| 47 | 573234,Web UI creati on for all questions and answe rs from fo r the new Upper Extr emity Shor t Form 7a Instrument ,571239,TB Ie Phase 2 v3.3.16 - Sprint 7, Task,Done, 573234,13, | |
| 48 | 571241,TBI e - Develo p PROMIS - Physical Function w ith Mobili ty Aid Ins trument Fo rm,TBIe Ph ase 2 v3.3 .16 - Spri nt 7,Story ,Implement ed,571241, 928737: Ne w Instrume nt - Physi cal Functi on w Mobil ity Aid,8, | |
| 49 | 573219,SQL creation to create all form q uestions a nd answers for the n ew Physica l Function w Mobilit y Aid Inst rument,571 241,TBIe P hase 2 v3. 3.16 - Spr int 7,Task ,Done,5732 19, | |
| 50 | 573223,Web UI creati on for all questions and answe rs from fo r the new Physical F unction w Mobility A id Instrum ent,571241 ,TBIe Phas e 2 v3.3.1 6 - Sprint 7,Task,Do ne,573223, 13, | |
| 51 | 571242,TBI e - Create New Field s on PGIC Instrument Form,TBIe Phase 2 v 3.3.16 - S print 7,St ory,Done,5 71242,9287 38: Update Instrumen t - Patien t Global I mpressions of Change (PGIC),3, | |
| 52 | 573206,Cre ate SQL Sc ripts to a dd New Que stions and Answers t o PGIC Ins trument,57 1242,TBIe Phase 2 v3 .3.16 - Sp rint 7,Tas k,Done,573 206, | |
| 53 | 573208,UI Editing to add the n ew PGIC In strument f orm questi ons and an swers to t he website .,571242,T BIe Phase 2 v3.3.16 - Sprint 7 ,Task,Done ,573208,5, | |
| 54 | 584751,Def ect: Optim al 1.1 Fol low Up - Q uestions/I tems aren' t numbered sequentia lly,TBIe P hase 2 v3. 3.16 - Spr int 7,Defe ct,Resolve d,584751, | |
| 55 | 584754,Def ect: PROMI S - Pain I nterferenc e Short - Form 6A: C opyright N otation,TB Ie Phase 2 v3.3.16 - Sprint 7, Defect,Res olved,5847 54, | |
| 56 | 584764,Def ect: PROMI S - Physic al Functio n With Mob ility Aid: Deactivat ing Respon ses,TBIe P hase 2 v3. 3.16 - Spr int 7,Defe ct,Resolve d,584764, | |
| 57 | 584770,Def ect: PROMI S - Upper Extremity - Short Fo rm 7A: Res ponse sele ctions are in revers e order,TB Ie Phase 2 v3.3.16 - Sprint 7, Defect,Res olved,5847 70, | |
| 58 | 584771,Def ect: MPAI - (Regress ion Test) - M2PI: In stance of care date, TBIe Phase 2 v3.3.16 - Sprint 7,Defect,R esolved,58 4771, | |
| 59 | 584774,Def ect: MPAI - (Regress ion Test) - M2PI: Di scharge No te Entry,T BIe Phase 2 v3.3.16 - Sprint 7 ,Defect,Re solved,584 774, | |
| 60 | 616444,Pha se1 Follow -up: CTBIE Revisions ,TBIe Phas e 2 v3.3.1 6 - Sprint 7,Story,I mplemented ,616444,94 8905: Phas e1 Follow- up: CTBIE Revisions, 3, | |
| 61 | 616445,Pha se1 Follow -up:LCI-5 Revisions, TBIe Phase 2 v3.3.16 - Sprint 7,Story,Im plemented, 616445,948 906: Phase 1 Follow-u p: LCI-5 R evisions,3 , | |
| 62 | 616447,Pha se1 Follow -up: M2PI Instrument Type,TBIe Phase 2 v 3.3.16 - S print 7,St ory,Implem ented,6164 47,948907: Phase1 Fo llow-up: M 2PI Instru ment Type, 2, | |
| 63 | 616449,Pha se1 Follow -up:Optima l – New Fo rm,TBIe Ph ase 2 v3.3 .16 - Spri nt 7,Story ,Implement ed,616449, 948908: Ph ase1 Follo w-up: Opti mal Follow Up – New Form,3, | |
| 64 | 616450,Pha se1 Follow -up:Rehab Follow Up – New Form ,TBIe Phas e 2 v3.3.1 6 - Sprint 7,Story,I mplemented ,616450,94 8911: Phas e1 Follow- up: Rehab Follow Up – New Form ,3, | |
| 65 | 626235,Upd ate TBI VD D for next release,T BIe Phase 2 v3.3.16 - Sprint 7 ,Task,In P rogress,62 6235, | |
| 66 | 636901,508 Defect: N o Skip Nav igation Li nk on Comp rehensive TBI Evalua tion Instr ument Form ,TBIe Phas e 2 v3.3.1 6 - Sprint 7,Defect, Resolved,6 36901, | |
| 67 | 642627,Def ect: LCI-5 Instrumen t Activiti es Scores Not Calcul ated Prope rly,TBIe P hase 2 v3. 3.16 - Spr int 7,Defe ct,Resolve d,642627, | |
| 68 | 625120,HRE - Merging Sustainme nt 15B Cod e into TBI e source,T BIe Phase 2 v3.3.16 - Sprint 7 ,Story,New ,625120,34 , | |
| 69 | 636905,508 Defect: N o Skip Nav igation Li nk on M2PI Instrumen t Form,TBI e Phase 2 v3.3.16 - Sprint 8,D efect,Reso lved,63690 5, | |
| 70 | 636903,508 Defect: N o Skip Nav igation Li nk on LCI- 5 Instrume nt Form,TB Ie Phase 2 v3.3.16 - Sprint 8, Defect,Res olved,6369 03, | |
| 71 | 636908,508 Defect: N o Skip Nav igation Li nk on Opti mal 1.1 In strument F orm,TBIe P hase 2 v3. 3.16 - Spr int 8,Defe ct,Resolve d,636908, | |
| 72 | 636912,508 Defect: N o Skip Nav igation Li nk on Opti mal 1.1 Fo llow Up In strument F orm,TBIe P hase 2 v3. 3.16 - Spr int 8,Defe ct,Resolve d,636912, | |
| 73 | 636920,508 Defect: N o Skip Nav igation Li nk on Reha bilitation Follow Up Instrumen t Form,TBI e Phase 2 v3.3.16 - Sprint 8,D efect,Reso lved,63692 0, | |
| 74 | 636921,508 Defect: N o Skip Nav igation Li nk on PGIC Instrumen t Form,TBI e Phase 2 v3.3.16 - Sprint 8,D efect,Reso lved,63692 1, | |
| 75 | 636926,508 Defect: N o Skip Nav igation Li nk on Shor t Form 6a Instrument Form,TBIe Phase 2 v 3.3.16 - S print 8,De fect,Resol ved,636926 , | |
| 76 | 636930,508 Defect: N o Skip Nav igation Li nk on Phys ical Funct ion With M obility Ai d Instrume nt Form,TB Ie Phase 2 v3.3.16 - Sprint 8, Defect,Res olved,6369 30, | |
| 77 | 636935,508 Defect: N o Skip Nav igation Li nk on Shor t Form 7a Instrument Form,TBIe Phase 2 v 3.3.16 - S print 8,De fect,Resol ved,636935 , | |
| 78 | 636938,508 Defect: N o Skip Nav igation Li nk on Pati entInstrum entsMain.a spx,TBIe P hase 2 v3. 3.16 - Spr int 8,Defe ct,Resolve d,636938, | |
| 79 | 636939,508 Defect: N o Skip Nav igation Li nk on Inst ruments.as px,TBIe Ph ase 2 v3.3 .16 - Spri nt 8,Defec t,Resolved ,636939, | |
| 80 | 636944,508 Defect: N o Skip Nav igation Li nk on Inst rumentSumm aryNote.as px,TBIe Ph ase 2 v3.3 .16 - Spri nt 8,Defec t,Resolved ,636944, | |
| 81 | 636950,508 Defect: T ab Order N ot Focused on LCI-5 Instrument Form,TBIe Phase 2 v 3.3.16 - S print 8,De fect,Resol ved,636950 , | |
| 82 | 636958,508 Defect: T ab Order N ot Focused on Physic al Functio n With Mob ility Aid Instrument Form,TBIe Phase 2 v 3.3.16 - S print 8,De fect,Resol ved,636958 , | |
| 83 | 555622,If a new Fort ify Rule P ack is rel eased afte r a build begins, th en new and previousl y unknown issues fro m the scan report co uld impact deploymen t.,TBIe Ph ase 2 v3.3 .16 - CD 2 Approval, Risk,Resol ved,555622 , | |
| 84 | 575226,Tra umatic Bra in Injury (TBI) Enh Registry P hase 2 v3. 3.16 GA RR R,TBIe Pha se 2 v3.3. 16 - CD 2 Approval,R elease Rea diness,Not Recommend ed,575226, | |
| 85 | 575237,VIP Release R eview - TB I Enh - Ph ase 2 v3.3 .16 - 508 Compliance ,575226,TB Ie Phase 2 v3.3.16 - CD 2 Appr oval,Task, Done,57523 7, | |
| 86 | 575234,VIP Release R eview - TB I Enh - Ph ase 2 v3.3 .16 - Prod uction Ope rations Ma nual/Techn ical Manua l (VistA) with RACI, 575226,TBI e Phase 2 v3.3.16 - CD 2 Appro val,Task,D one,575234 , | |
| 87 | 575235,VIP Release R eview - TB I Enh - Ph ase 2 v3.3 .16 - Depl oyment/Ins tallation/ Backout/Ro llback,575 226,TBIe P hase 2 v3. 3.16 - CD 2 Approval ,Task,Done ,575235, | |
| 88 | 575233,VIP Release R eview - TB I Enh - Ph ase 2 v3.3 .16 - Requ irements ( Epics/User Stories), 575226,TBI e Phase 2 v3.3.16 - CD 2 Appro val,Task,D one,575233 , | |
| 89 | 575229,VIP Release R eview - TB I Enh - Ph ase 2 v3.3 .16 - Sust ainment Co ntracts/Li censing an d Funding (AFMP),575 226,TBIe P hase 2 v3. 3.16 - CD 2 Approval ,Task,Done ,575229, | |
| 90 | 575227,VIP Release R eview - TB I Enh - Ph ase 2 v3.3 .16 - Ver sion Descr iption Doc ument,5752 26,TBIe Ph ase 2 v3.3 .16 - CD 2 Approval, Task,Done, 575227, | |
| 91 | 575231,VIP Release R eview - TB I Enh - Ph ase 2 v3.3 .16 - SLA' s and OLA' s,575226,T BIe Phase 2 v3.3.16 - CD 2 App roval,Task ,Done,5752 31, | |
| 92 | 575230,VIP Release R eview - TB I Enh - Ph ase 2 v3.3 .16 - Trac eability ( requiremen ts to test cases/Tes t Executio n/Test Res ults/Defec t Log,5752 26,TBIe Ph ase 2 v3.3 .16 - CD 2 Approval, Task,Done, 575230, | |
| 93 | 575236,VIP Release R eview - TB I Enh - Ph ase 2 v3.3 .16 - ATO (Approved) ,575226,TB Ie Phase 2 v3.3.16 - CD 2 Appr oval,Task, Done,57523 6, | |
| 94 | 575228,VIP Release R eview - TB I Enh - Ph ase 2 v3.3 .16 - User Guides,57 5226,TBIe Phase 2 v3 .3.16 - CD 2 Approva l,Task,Don e,575228, | |
| 95 | 575232,VIP Release R eview - TB I Enh - Ph ase 2 v3.3 .16 - Risk s,575226,T BIe Phase 2 v3.3.16 - CD 2 App roval,Task ,Done,5752 32, | |
| 96 | 581797,Upl oad TBIe P hase 2 ATO Memo,TBIe Phase 2 v 3.3.16 - C D 2 Approv al,Task,Re ady for Re view,58179 7, | |
| 97 | 591754,Upl oad TBI En h - Build 2 - Produc tion Opera tions Manu al/Technic al Manual (VistA) wi th RACI,TB Ie Phase 2 v3.3.16 - CD 2 Appr oval,Task, Ready for Review,591 754, | |
| 98 | 591759,Upl oad TBI En h - Build 2 - Requir ements (Ep ics/User S tories),TB Ie Phase 2 v3.3.16 - CD 2 Appr oval,Task, Triaged,59 1759, | |
| 99 | 591766,Upl oad TBI En h - Build 2 - Risk L og,TBIe Ph ase 2 v3.3 .16 - CD 2 Approval, Task,Triag ed,591766, | |
| 100 | 591773,Upl oad TBI En h - Build 2 - SLA's and OLA's, TBIe Phase 2 v3.3.16 - CD 2 Ap proval,Tas k,Ready fo r Review,5 91773, | |
| 101 | 591782,Upl oad TBI En h - Build 2 - Sustai nment Cont racts/Lice nsing and Funding (A FMP),TBIe Phase 2 v3 .3.16 - CD 2 Approva l,Task,Rea dy for Rev iew,591782 , | |
| 102 | 591785,Upl oad TBI En h - Build 2 - User G uide,TBIe Phase 2 v3 .3.16 - CD 2 Approva l,Task,Tri aged,59178 5, | |
| 103 | 599128,TBI Enhanceme nts Phase 2 SLA VIP document,T BIe Phase 2 v3.3.16 - CD 2 App roval,Task ,In Progre ss,599128, | |
| 104 | 632979,Ele ctive ETS Services f or Traumat ic Brain I njury (TBI ) Enh Regi stry Phase 2 v3.3.15 ,TBIe Phas e 2 v3.3.1 6 - CD 2 A pproval,Ta sk,Ready f or Review, 632979, | |
| 105 | 643063,Upl oad TBI En h - Phase 2 v3.3.16 - User Gui des,TBIe P hase 2 v3. 3.16 - CD 2 Approval ,Task,Read y for Revi ew,643063, | |
| 106 | 645492,Upl oad TBI En h - Phase 2 v3.3.16 - Requirem ents (Epic s/User Sto ries),TBIe Phase 2 v 3.3.16 - C D 2 Approv al,Task,Re ady for Re view,64549 2, | |
| 107 | 646472,Upl oad TBI E nh - Phase 2 v3.3.16 - Risks L og,TBIe Ph ase 2 v3.3 .16 - CD 2 Approval, Task,Ready for Revie w,646472, | |
| 108 | 647713,Upl oad TBI En h - Phase 2 v3.3.16 - Deployme nt/Install ation/Back out/Rollba ck,TBIe Ph ase 2 v3.3 .16 - CD 2 Approval, Task,Ready for Revie w,647713, | |
| 109 | 528321,TBI Instrumen ts - Optim al 1.1 Fol low-up - – “Not Appl icable” se lections a re not sav ed as part of the su rvey. Imme diately af ter saving a survey with “Not Applicable ”, you can see those values ar e unchecke d,TBIe Pha se 2 v3.3. 16 - CD 2 Approval,S tory,Triag ed,528321, 915388: _S ZwyAWGEEee iK6jnwZdQ8 Q,5, | |
| 110 | 575941,TBI e - Secure Design Re view Compl iancy - Th reat Model ,TBIe Phas e 2 v3.3.1 6 - CD 2 A pproval,St ory,Triage d,575941,5 , | |
| 111 | 653455,Upl oad Financ ial Manage ment Plan - TBI Enh Phase 2 v3 .3.16,TBIe Phase 2 v 3.3.16 - C D 2 Approv al,Task,Re ady for Re view,65345 5, |
Araxis Merge (but not the data content of this report) is Copyright © 1993-2016 Araxis Ltd (www.araxis.com). All rights reserved.