1. EPMO Open Source Coordination Office Redaction File Detail Report

Produced by Araxis Merge on 9/6/2017 3:05:07 PM Eastern Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.

1.1 Files compared

# Location File Last Modified
1 MCCF EDI TAS BPS PSO PSX Bundle.zip\MCCF EDI TAS BPS PSO PSX Bundle BPS_1_22_PSO_PSX_ig.docx Thu Jul 20 17:53:30 2017 UTC
2 MCCF EDI TAS BPS PSO PSX Bundle.zip\MCCF EDI TAS BPS PSO PSX Bundle BPS_1_22_PSO_PSX_ig.docx Wed Aug 30 20:42:32 2017 UTC

1.2 Comparison summary

Description Between
Files 1 and 2
Text Blocks Lines
Unchanged 1 832
Changed 0 0
Inserted 0 0
Removed 0 0

1.3 Comparison options

Whitespace
Character case Differences in character case are significant
Line endings Differences in line endings (CR and LF characters) are ignored
CR/LF characters Not shown in the comparison detail

1.4 Active regular expressions

No regular expressions were active.

1.5 Comparison detail

  1   Medical Ca re Collect ion Fund ( MCCF) Elec tronic Dat a Intercha nge (EDI)  Transactio n Applicat ions Suite  (TAS) ePh armacy Bui ld 2
  2   E Claims M anagement  Engine BPS *1.0*22Out patient Ph armacy PSO *7.0*478Co nsolidated  Mail Outp atient Pha rmacy PSX* 2.0*81
  3   Deployment , Installa tion, Back -Out, and  Rollback G uide
  4   Version 1. 0
  5  
  6  
  7   July 2017
  8   Department  of Vetera ns Affairs
  9   Office of  Informatio n and Tech nology (OI &T)
  10  
  11  
  12   Revision H istory
  13   Date
  14   Version
  15   Descriptio n
  16   Author
  17   July 2017
  18   1.0
  19   Initial Ve rsion
  20   Christine  Bullis, Ma rk Dawson,  Paul Devi ne
  21  
  22   Artifact R ationale
  23   This docum ent descri bes the De ployment,  Installati on, Back-o ut, and Ro llback Pla n for new  products g oing into  the VA Ent erprise. T he plan in cludes inf ormation a bout syste m support,  issue tra cking, esc alation pr ocesses, a nd roles a nd respons ibilities  involved i n all thos e activiti es. Its pu rpose is t o provide  clients, s takeholder s, and sup port perso nnel with  a smooth t ransition  to the new  product o r software , and shou ld be stru ctured app ropriately , to refle ct particu lars of th ese proced ures at a  single or  at multipl e location s.
  24   Per the Ve teran-focu sed Integr ated Proce ss (VIP) G uide, the  Deployment , Installa tion, Back -out, and  Rollback P lan is req uired to b e complete d prior to  Critical  Decision P oint #2 (C D #2), wit h the expe ctation th at it will  be update d througho ut the lif ecycle of  the projec t for each  build, as  needed.
  25  
  26  
  27  
  28  
  29   Table of C ontents
  30   1Introduct ion1
  31   1.1Purpose 1
  32   1.2Depende ncies1
  33   1.3Constra ints1
  34   2Roles and  Responsib ilities1
  35   3Deploymen t2
  36   3.1Timelin e2
  37   3.2Site Re adiness As sessment2
  38   3.2.1Deplo yment Topo logy (Targ eted Archi tecture)2
  39   3.2.2Site  Informatio n (Locatio ns, Deploy ment Recip ients)2
  40   3.2.3Site  Preparatio n3
  41   3.3Resourc es3
  42   3.3.1Facil ity Specif ics3
  43   3.3.2Hardw are3
  44   3.3.3Softw are3
  45   3.3.4Commu nications4
  46   3.3.4.1Dep loyment/In stallation /Back-Out  Checklist4
  47   4Installat ion4
  48   4.1Pre-ins tallation  and System  Requireme nts4
  49   4.2Platfor m Installa tion and P reparation 5
  50   4.3Downloa d and Extr act Files5
  51   4.4Databas e Creation 5
  52   4.5Install ation Scri pts5
  53   4.6Cron Sc ripts5
  54   4.7Access  Requiremen ts and Ski lls Needed  for the I nstallatio n5
  55   4.8Install ation Proc edure5
  56   4.9Install ation Veri fication P rocedure5
  57   4.10System  Configura tion5
  58   4.11Databa se Tuning5
  59   5Back-Out  Procedure6
  60   5.1Back-Ou t Strategy 6
  61   5.1.1Mirro r Testing  or Site Pr oduction T esting6
  62   5.1.2After  National  Release bu t During t he Designa ted Suppor t Period6
  63   5.1.3After  National  Release an d Warranty  Period6
  64   5.2Back-Ou t Consider ations6
  65   5.2.1Load  Testing6
  66   5.2.2User  Acceptance  Testing6
  67   5.3Back-Ou t Criteria 8
  68   5.4Back-Ou t Risks8
  69   5.5Authori ty for Bac k-Out8
  70   5.6Back-Ou t Procedur e8
  71   5.7Back-ou t Verifica tion Proce dure9
  72   6Rollback  Procedure9
  73   6.1Rollbac k Consider ations9
  74   6.2Rollbac k Criteria 9
  75   6.3Rollbac k Risks9
  76   6.4Authori ty for Rol lback9
  77   6.5Rollbac k Procedur e9
  78   6.6Rollbac k Verifica tion Proce dure9
  79  
  80   Table of T ables
  81   Table 1: D eployment,  Installat ion, Back- out, and R ollback Ro les and Re sponsibili ties1
  82   Table 2: S ite Prepar ation3
  83   Table 3: F acility-Sp ecific Fea tures3
  84   Table 4: H ardware Sp ecificatio ns3
  85   Table 5: S oftware Sp ecificatio ns4
  86   Table 6: D eployment/ Installati on/Back-Ou t Checklis t4
  87  
  88  
  89  
  90   Introducti on
  91   This docum ent descri bes how to  deploy an d install  the multi- build BPS  PSO PSX BU NDLE 10.0  (which inc ludes BPS* 1.0*22, PS O*7.0*478,  PSX*2.0*8 1) and how  to back-o ut the pro duct and r ollback to  a previou s version  or data se t.
  92   Purpose
  93   The purpos e of this  plan is to  provide a  single, c ommon docu ment that  describes  how, when,  where, an d to whom  the multi- build BPS  PSO PSX BU NDLE 10.0  (which inc ludes BPS* 1.0*22, PS O*7.0*478,  PSX*2.0*8 1) will be  deployed  and instal led, as we ll as how  it is to b e backed o ut and rol led back,  if necessa ry. The pl an identif ies resour ces, commu nications  plan, and  rollout sc hedule. Sp ecific ins tructions  for instal lation, ba ck-out, an d rollback  are inclu ded in thi s document .
  94   Dependenci es
  95   BPS*1.0*20  must be i nstalled B EFORE BPS* 1*22.
  96   PSO*7.0*36 7 and PSO* 7.0*448 mu st be inst alled BEFO RE PSO*7*4 78.
  97   PSX*2.0*70 , PSX*2.0* 77, and PS X*2.0*79 m ust be ins talled BEF ORE PSX*2* 81.
  98   Constraint s
  99   This patch  is intend ed for a f ully patch ed VistA s ystem.
  100   Roles and  Responsibi lities
  101   Table 1: D eployment,  Installat ion, Back- out, and R ollback Ro les and Re sponsibili ties
  102   ID
  103   Team
  104   Phase / Ro le
  105   Tasks
  106   Project Ph ase (See S chedule)
  107   1
  108   VA OI&T, V A OI&T Hea lth Produc t Support  & PMO (Lei dos)
  109   Deployment
  110   Plan and s chedule de ployment ( including  orchestrat ion with v endors)
  111   Planning
  112   2
  113   Local VAMC  and CPAC  processes
  114  
  115  
  116   Deployment
  117   Determine  and docume nt the rol es and res ponsibilit ies of tho se involve d in the d eployment.
  118   Planning
  119   3
  120   Field Test ing (Initi al Operati ng Capabil ity - IOC) , Health P roduct Sup port Testi ng & VIP R elease Age nt Approva
  121   Deployment
  122   Test for o perational  readiness  
  123   Testing
  124   4
  125   Health pro duct Suppo rt and Fie ld Operati ons
  126   Deployment
  127   Execute de ployment
  128   Deployment
  129   5
  130   Individual  Veterans  Administra tion Medic al Centers  (VAMCs)
  131   Installati on
  132   Plan and s chedule in stallation  
  133   Deployment
  134   6
  135    VIP Relea se Agent
  136   Installati on
  137   Ensure aut hority to  operate an d that cer tificate a uthority s ecurity do cumentatio n is in pl ace
  138   Deployment
  139   7
  140   N/A for th is patch a s we are u sing only  the existi ng VistA s ystem
  141   Installati on
  142   Validate t hrough fac ility POC  to ensure  that IT eq uipment ha s been acc epted usin g asset in ventory pr ocesses
  143  
  144   8
  145   VA’s eBusi ness team
  146   Installati ons
  147   Coordinate  training 
  148   Deployment
  149   9
  150   VIP releas e Agent, H ealth Prod uct Suppor t & the de velopment  team
  151   Back-out
  152   Confirm av ailability  of back-o ut instruc tions and  back-out s trategy (w hat are th e criteria  that trig ger a back -out) 
  153   Deployment
  154   10
  155   No changes  to curren t process  – we are u sing the e xisting Vi stA system
  156   Post Deplo yment
  157   Hardware,  Software a nd System  Support
  158   Warranty
  159   Deployment
  160   The deploy ment is pl anned as a  national  rollout.
  161   This secti on provide s the sche dule and m ilestones  for the de ployment.
  162   Timeline
  163   The durati on of depl oyment and  installat ion is 30  days, as d epicted in  the maste r deployme nt schedul e.
  164   Site Readi ness Asses sment
  165   This secti on discuss es the loc ations tha t will rec eive the d eployment  of the mul ti-build B PS PSO PSX  BUNDLE 10 .0 (which  includes B PS*1.0*22,  PSO*7.0*4 78, PSX*2. 0*81).
  166   Deployment  Topology  (Targeted  Architectu re)
  167   This multi -build BPS  PSO PSX B UNDLE 10.0  (which in cludes BPS *1.0*22, P SO*7.0*478 , PSX*2.0* 81) is to  be nationa lly releas ed to all  VAMCs.
  168   Site Infor mation (Lo cations, D eployment  Recipients )
  169   The test s ites for I OC testing  are:
  170   Birmingham
  171   Eastern Ka nsas
  172   Lexington
  173   Little Roc k
  174   Richmond
  175  
  176   Upon natio nal releas e all VAMC s are expe cted to in stall this  patch pri or to or o n the comp liance dat e.
  177   Site Prepa ration
  178   The follow ing table  describes  preparatio n required  by the si te prior t o deployme nt.
  179   Table 2: S ite Prepar ation
  180   Site/Other
  181   Problem/Ch ange Neede d
  182   Features t o Adapt/Mo dify to Ne w Product
  183   Actions/St eps
  184   Owner
  185   N/A
  186   N/A
  187   N/A
  188   N/A
  189   N/A
  190   Resources
  191   Facility S pecifics
  192   The follow ing table  lists faci lity-speci fic featur es require d for depl oyment.
  193   Table 3: F acility-Sp ecific Fea tures
  194   Site
  195   Space/Room
  196   Features N eeded
  197   Other
  198   N/A
  199   N/A
  200   N/A
  201   N/A
  202   Hardware
  203   The follow ing table  describes  hardware s pecificati ons requir ed at each  site prio r to deplo yment.
  204   Table 4: H ardware Sp ecificatio ns
  205   Required H ardware
  206   Model
  207   Version
  208   Configurat ion
  209   Manufactur er
  210   Other
  211   Existing V istA syste m
  212   N/A
  213   N/A
  214   N/A
  215   N/A
  216   N/A
  217   Please see  the Roles  and Respo nsibilitie s table in  Section 2  for detai ls about w ho is resp onsible fo r preparin g the site  to meet t hese hardw are specif ications.
  218   Software
  219   The follow ing table  describes  software s pecificati ons requir ed at each  site prio r to deplo yment.
  220   Table 5: S oftware Sp ecificatio ns
  221   Required S oftware
  222   Make
  223   Version
  224   Configurat ion
  225   Manufactur er
  226   Other
  227   Fully patc hed E Clai ms Managem ent Engine  package w ithin Vist A
  228   N/A
  229   1.0
  230   N/A
  231   N/A
  232   N/A
  233   Fully patc hed Outpat ient Pharm acy packag e within V istA
  234   N/A
  235   7.0
  236   N/A
  237   N/A
  238   N/A
  239   Fully patc hed Consol idated Mai l Outpatie nt Pharmac y package  within Vis tA
  240   N/A
  241   2.0
  242   N/A
  243   N/A
  244   N/A
  245   Prerequisi te patches  in BPS, P SO, PSX ye t to be de termined
  246   N/A
  247   Nationally  released  version
  248   N/A
  249   N/A
  250   N/A
  251   Please see  the Roles  and Respo nsibilitie s table in  Section 2  above for  details a bout who i s responsi ble for pr eparing th e site to  meet these  software  specificat ions.
  252   Communicat ions
  253   The sites  that are p articipati ng in fiel d testing  (IOC) will  use the “ Patch Trac king” mess age in Out look to co mmunicate  with the e Pharmacy e Business t eam, the d evelopers,  and produ ct support  personnel .
  254   Deployment /Installat ion/Back-O ut Checkli st
  255   The Releas e Manageme nt team wi ll deploy  the multi- build BPS  PSO PSX BU NDLE 10.0,  which is  tracked na tionally f or all VAM Cs in the  National P atch Modul e (NPM) in  Forum. Fo rum automa tically tr acks the p atches as  they are i nstalled i n the diff erent VAMC  productio n systems.  One can r un a repor t in Forum  to identi fy when an d by whom  the patch  was instal led into t he VistA p roduction  at each si te. A repo rt can als o be run t o identify  which sit es have no t currentl y installe d the patc h into the ir VistA p roduction  system. Th erefore, t his inform ation does  not need  to be manu ally track ed in the  chart belo w.
  256  
  257   Table 6: D eployment/ Installati on/Back-Ou t Checklis t
  258   Activity
  259   Day
  260   Time
  261   Individual  who compl eted task
  262   Deploy
  263   N/A
  264   N/A
  265   N/A
  266   Install
  267   N/A
  268   N/A
  269   N/A
  270  
  271   Installati on
  272   Pre-instal lation and  System Re quirements
  273   Multi-buil d BPS PSO  PSX BUNDLE  10.0 is i nstallable  on a full y patched  M(UMPS) Vi stA system  and opera tes on the  top of th e VistA en vironment  provided b y the Vist A infrastr ucture pac kages. The  latter pr ovides uti lities whi ch communi cate with  the underl ying opera ting syste m and hard ware, ther eby provid ing each V istA packa ge indepen dence from  variation s in hardw are and op erating sy stem.
  274   Platform I nstallatio n and Prep aration
  275   Refer to t he BPS*1.0 *22 docume ntation on  the NPM i n Forum fo r the deta iled insta llation in structions . These in structions  include a ny pre-ins tallation  steps if a pplicable.
  276   Download a nd Extract  Files
  277   Refer to t he BPS*1.0 *22, PSO*7 .0*478, PS X*2.0*81 d ocumentati on on the  NPM to fin d related  documentat ion that c an be down loaded. Th e patch de scription  of each pa tch will b e transmit ted as a M ailMan mes sage from  the NPM an d this mes sage can b e pulled f rom the NP M. The pat ches thems elves are  bundled to gether int o the mult i-build BP S PSO PSX  BUNDLE 10. 0. The hos t file con taining th ese patche s must be  downloaded  separatel y. The fil e name is  BPS_1_22_P SO_PSX.KID  and it ca n be found  on the AN ONYMOUS.SO FTWARE dir ectory on  any of the  VistA FTP  servers ( Albany, Hi nes, Salt  Lake City) .
  278   Database C reation
  279   Multi-buil d BPS PSO  PSX BUNDLE  10.0 modi fies the V istA datab ase. All c hanges can  be found  on the NPM  documenta tion for t his patch.  
  280   Installati on Scripts
  281   No install ation scri pts are ne eded for m ulti-build  BPS PSO P SX BUNDLE  10.0 insta llation.
  282   Cron Scrip ts
  283   No Cron sc ripts are  needed for  multi-bui ld BPS PSO  PSX BUNDL E 10.0 ins tallation.
  284   Access Req uirements  and Skills  Needed fo r the Inst allation
  285   Staff perf orming the  installat ion of thi s multi-bu ild will n eed access  to FORUM’ s NPM to v iew all pa tch descri ptions. St aff will a lso need a ccess and  ability to  download  the host f ile from o ne of the  VA’s FTP s ervers. Th e software  is to be  installed  by each si te’s or re gion’s des ignated VA  OI&T IT O PERATIONS  SERVICE, E nterprise  Service Li nes, Vista  Applicati ons Divisi on.
  286   Installati on Procedu re
  287   Refer to t he BPS*1.0 *22 docume ntation on  the NPM f or detaile d installa tion instr uctions.
  288   Installati on Verific ation Proc edure
  289   Refer to t he BPS*1.0 *22 docume ntation on  the NPM f or detaile d installa tion instr uctions. T hese instr uctions in clude any  post insta llation st eps if app licable.
  290   System Con figuration
  291   No system  configurat ion change s are requ ired for t his patch.
  292   Database T uning
  293   No reconfi guration o f the Vist A database , memory a llocations  or other  resources  is necessa ry.
  294   Back-Out P rocedure
  295   Back-Out p ertains to  a return  to the las t known go od operati onal state  of the so ftware and  appropria te platfor m settings .
  296   Back-Out S trategy
  297   A decision  to back o ut could b e made dur ing Site M irror Test ing, durin g Site Pro duction Te sting, or  after Nati onal Relea se to the  field (VAM Cs). The b est strate gy decisio n is depen dent on th e stage of  testing d uring whic h the deci sion is ma de.
  298   Mirror Tes ting or Si te Product ion Testin g
  299   If a decis ion to bac k out is m ade during  Mirror Te sting or S ite Produc tion Testi ng, a new  version of  the patch  can be us ed to rest ore the bu ild compon ents to th eir pre-pa tch condit ion.
  300   After Nati onal Relea se but Dur ing the De signated S upport Per iod
  301   If a decis ion to bac k out is m ade after  national r elease and  within th e designat ed support  period, a  new patch  will be e ntered int o the NPM  in Forum a nd will go  through a ll the nec essary mil estone rev iews, etc.  as a patc h for a pa tch. This  patch coul d be defin ed as an e mergency p atch, and  it could b e used to  address sp ecific iss ues pertai ning to th e original  patch or  it could b e used to  restore th e build co mponents t o their or iginal pre -patch con dition.
  302   After Nati onal Relea se and War ranty Peri od
  303   After the  support pe riod, the  VistA Main tenance Pr ogram will  produce t he new pat ch, either  to correc t the defe ctive comp onents or  restore th e build co mponents t o their or iginal pre -patch con dition.
  304   Back-Out C onsiderati ons
  305   Changes im plemented  with multi -build BPS  PSO PSX B UNDLE 10.0  can be ba cked out i n their en tirety or  on an enha ncement-by -enhanceme nt basis.  Either cou ld be acco mplished v ia a new v ersion of  multi-buil d BPS PSO  PSX BUNDLE  10.0 if b efore nati onal relea se or a ne w multi-bu ild if aft er nationa l release.
  306   Load Testi ng
  307   N/A. The b ack-out pr ocess will  be execut ed at norm al rather  than raise d job prio rity and i s expected  to have n o signific ant effect  on total  system per formance.  Subsequent  to the re version, t he perform ance deman ds on the  system wil l be uncha nged.
  308   User Accep tance Test ing
  309   Below are  the accept ance crite ria for ea ch story i ncluded in  BPS PSO P SX BUNDLE  10.0.
  310  
  311   US22
  312   Confirm th at TRICARE /CHAMPVA p rescriptio ns are not  delayed i n being tr ansmitted  to CMOP if  the claim  response  is receive d within 2  hours of  the claim  submission .
  313  
  314  
  315   US115
  316   Verify tha t a label  may not be  printed o r reprinte d for a pr escription  if there  is an unre solved 79,  88, or RR R reject.
  317   Verify tha t the user  may not p rocess/fil l a prescr iption if  there is a n unresolv ed 79, 88,  or RRR re ject.
  318  
  319   US174
  320   Confirm th at the fil e BPS NCPD P FIELD DE FS include s the entr ies:
  321   B95-3Z Fac ility ID Q ualifier
  322   B98-34 Rec onciliatio n ID
  323  
  324   US178
  325   Confirm th at the fol lowing fie lds are av ailable in  the Claim  Log and t he Claim R esponse In quiry:
  326   B95-3Z Fac ility ID Q ualifier
  327   B98-34 Rec onciliatio n ID
  328   C01-4N Ori ginal Manu facturer P roduct ID
  329   C02-4P Ori ginal Manu facturer P roduct ID  Qualifier
  330   Confirm th e Claim Re sponse Inq uiry conta ins the co rrect valu es for the  above fie lds.
  331   Confirm th e Claim Lo g contains  the corre ct values  for the ab ove fields .
  332   Confirm th e above fi elds only  display in  the Claim  Log when  a value is  transmitt ed in the  field.
  333   Confirm th e above fi elds only  display in  the Claim  Response  Inquiry wh en a value  is transm itted in t he field.
  334  
  335   US209
  336   Verify the  new PR Pr int Report (s) action  is availa ble under  VER View e Pharmacy R x.
  337   When a use r selects  the new ac tion PR Pr int Report (s) within  the VER V iew ePharm acy Rx, a  list of re ports avai lable for  printing i s displaye d and the  user enter s the name  of the re port(s) to  print. 
  338   Help text  is availab le and dis plays when  the user  enters “?”  or “??” a t the sele ct prompt.
  339   The user m ay select  one report .
  340   Multiple r eports can  be select ed, separa ted by com mas.
  341   The Select  Report to  Print pro mpt repeat s until th e user hit s enter wi thout maki ng a selec tion.
  342   If a user  selects a  report mor e than onc e, the rep ort will o nly print  once.
  343   Only selec ted report s are prin ted.
  344   The system  does not  display a  default va lue when p rompting t he user fo r the name s of repor ts to prin t.
  345   If the use r enters a n invalid  selection,  an error  message wi ll be disp layed. If  the invali d entry wa s one of m any, accep t the vali d entries.
  346   An entry o f “^” esca pes back t o the VER  screen.
  347  
  348   US576
  349   Confirm th at the use r can reve rt to thei r default  view
  350  
  351   US579
  352   Confirm th at the Aut o-Reverse  parameter  will accep t only val ue from 3  to 10.
  353  
  354   US583
  355   Confirm th at the Rej ect Inform ation Scre en display s the Tax  ID and PCN
  356  
  357   US589
  358   Verify tha t the ECME  Auto-Reve rsal Proce ss email b ulletin di splays the  patients’  eligibili ty and the  name of t he drug
  359   Back-Out C riteria
  360   It may be  decided to  back out  this patch  if the pr oject is c anceled, t he request ed changes  implement ed by mult i-build BP S PSO PSX  BUNDLE 10. 0 are no l onger desi red by VA  OI&T and t he ePharma cy eBusine ss team, o r the patc h produces  catastrop hic proble ms.
  361   Back-Out R isks
  362   Since the  ePharmacy  software i s tightly  integrated  with exte rnal syste ms, any at tempt at a  back-out  should inc lude close  consultat ion with t he externa l trading  partners s uch as the  Financial  Services  Center (FS C) and the  Health Ca re Clearin g House (H CCH) to de termine ri sk.
  363   Authority  for Back-O ut
  364   The order  would come  from: rel ease coord inator (pr oduct supp ort), port folio dire ctor, and  health pro duct suppo rt. The or der should  be done i n consulta tion with  the develo pment team  and exter nal tradin g partners  such as F SC and the  HCCH to d etermine t he appropr iate cours e of actio n. ePharma cy is tigh tly integr ated with  these exte rnal partn ers and a  decision t o back-out  should no t be made  without th eir consul tation.
  365   Back-Out P rocedure
  366   Backing ou t enhancem ents to a  VistA appl ication is  often com plex. Norm ally, defe cts are re paired via  a follow- up patch.  The develo pment team  recommend s that sit es log a t icket if t here is a  nationally  released  patch to b e implemen ted. If no t, the sit e should c ontact the  Enterpris e Program  Management  Office (E PMO) team  directly f or specifi c solution s to their  unique pr oblems.
  367  
  368   Multi-buil d BPS PSO  PSX BUNDLE  10.0 cont ains the f ollowing b uild compo nents:
  369   Routines
  370   File entri es in the  file BPS N CPDP FIELD  DEFS (#90 02313.91)
  371   Data Dicti onary Chan ges
  372   Protocols
  373   List Templ ates
  374  
  375   While the  VistA KIDS  installat ion proced ure allows  the insta ller to ba ck up the  modified r outines us ing the ‘B ackup a Tr ansport Gl obal’ acti on, the ba ck-out pro cedure for  global, d ata dictio nary and o ther VistA  component s is more  complex an d requires  issuance  of a follo w-up patch  to ensure  all compo nents are  properly r emoved and /or restor ed. All so ftware com ponents (r outines an d other it ems) must  be restore d to their  previous  state at t he same ti me and in  conjunctio n with the  restorati on of the  data.
  376  
  377   Please con tact the E PMO team f or assista nce since  this insta lled patch  contains  components  in additi on to rout ines.
  378   Back-out V erificatio n Procedur e
  379   Successful  back-out  is confirm ed by veri fication t hat the ba ck-out pat ch was suc cessfully  installed.
  380   Rollback P rocedure
  381   Rollback p ertains to  data. The  data chan ges in thi s patch ar e specific  to the op erational  software a nd platfor m settings . These da ta changes  are cover ed in the  Back-out p rocedures  detailed e lsewhere i n this doc ument.
  382   Rollback C onsiderati ons
  383   Not applic able.
  384   Rollback C riteria
  385   Not applic able.
  386   Rollback R isks
  387   Not applic able.
  388   Authority  for Rollba ck
  389   Not applic able.
  390   Rollback P rocedure
  391   Not applic able.
  392   Rollback V erificatio n Procedur e
  393   Not applic able.
  394  
  395   Template R evision Hi story
  396   Date
  397   Version
  398   Descriptio n
  399   Author
  400   March 2016
  401   2.2
  402   Changed th e title fr om Install ation, Bac k-Out, and  Rollback  Guide to D eployment  and Instal lation Gui de, with t he underst anding tha t Back-Out  and Rollb ack belong  with Inst allation. 
  403   VIP Team
  404   February 2 016
  405   2.1
  406   Changed ti tle from I nstallatio n, Back-Ou t, and Rol lback Plan  to Instal lation, Ba ck-Out, an d Rollback  Guide as  recommende d by OI&T  Documentat ion Standa rds Commit tee
  407   OI&T Docum entation S tandards C ommittee
  408   December 2 015
  409   2.0
  410   The OI&T D ocumentati on Standar ds Committ ee merged  the existi ng “Instal lation, Ba ck-Out, Ro llback Pla n” templat e with the  content r equirement s in the O I&T End-us er Documen tation Sta ndards for  a more co mprehensiv e Installa tion Plan.
  411   OI&T Docum entation S tandards C ommittee
  412   February 2 015
  413   1.0
  414   Initial Dr aft
  415   Lifecycle  and Releas e Manageme nt
  416