3. EPMO Open Source Coordination Office Redaction File Detail Report

Produced by Araxis Merge on 9/28/2018 12:31:23 PM Central Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.

3.1 Files compared

# Location File Last Modified
1 MCCF_EDI_TAS_IB_2.0_621.zip IB_2_0_P621_IG.docx Wed Aug 15 18:02:14 2018 UTC
2 MCCF_EDI_TAS_IB_2.0_621.zip IB_2_0_P621_IG.docx Wed Sep 26 23:28:04 2018 UTC

3.2 Comparison summary

Description Between
Files 1 and 2
Text Blocks Lines
Unchanged 1 780
Changed 0 0
Inserted 0 0
Removed 0 0

3.3 Comparison options

Whitespace
Character case Differences in character case are significant
Line endings Differences in line endings (CR and LF characters) are ignored
CR/LF characters Not shown in the comparison detail

3.4 Active regular expressions

No regular expressions were active.

3.5 Comparison detail

  1   Deployment , Installa tion, Back -Out, and  Rollback G uide
  2    Medical C are Collec tion Fund  (MCCF) Ele ctronic Da ta Interch ange (EDI)  Transacti on Applica tions Suit e (TAS) Ph ase 1
  3   eInsurance  IB*2.0*62 1
  4  
  5  
  6   August 201 8
  7   Document V ersion 0.1
  8   Department  of Vetera ns Affairs
  9   Office of  Informatio n and Tech nology (OI &T)
  10  
  11  
  12   Revision H istory
  13   Date
  14   Version
  15   Descriptio n
  16   Author
  17   08/14/2018
  18   1.0
  19   IOC Entry
  20   Daniel Mor an
  21   June 2018
  22   0.1
  23   Initial Ve rsion - Dr aft
  24   Daniel Mor an 
  25  
  26   Artifact R ationale
  27   This docum ent descri bes the De ployment,  Installati on, Back-o ut, and Ro llback Pla n for new  products g oing into  the VA Ent erprise. T he plan in cludes inf ormation a bout syste m support,  issue tra cking, esc alation pr ocesses, a nd roles a nd respons ibilities  involved i n all of t hese activ ities. Its  purpose i s to provi de clients , stakehol ders, and  support pe rsonnel a  smooth tra nsition to  the new p roduct or  software.  This docum ent should  be struct ured to re flect the  applicatio n of these  procedure s to eithe r a single  site or t o multiple  sites.
  28   Per the Ve teran-focu sed Integr ated Proce ss (VIP) G uide, the  Deployment , Installa tion, Back -out, and  Rollback P lan is req uired to b e complete d prior to  Critical  Decision P oint #2 (C D #2), wit h the expe ctation th at it will  be update d througho ut the lif ecycle of  the projec t for each  build, as  needed. 
  29  
  30  
  31  
  32  
  33   Table of C ontents
  34   1Introduct ion1
  35   1.1Purpose 1
  36   1.2Depende ncies1
  37   1.3Constra ints1
  38   2Roles and  Responsib ilities1
  39   3Deploymen t2
  40   3.1Timelin e2
  41   3.2Site Re adiness As sessment2
  42   3.2.1Deplo yment Topo logy (Targ eted Archi tecture)2
  43   3.2.2Site  Informatio n (Locatio ns, Deploy ment Recip ients)3
  44   3.2.3Site  Preparatio n3
  45   3.3Resourc es3
  46   3.3.1Facil ity Specif ics3
  47   3.3.2Hardw are3
  48   3.3.3Softw are3
  49   3.3.4Commu nications4
  50   3.3.4.1Dep loyment/In stallation /Back-Out  Checklist4
  51   4Installat ion5
  52   4.1Pre-ins tallation  and System  Requireme nts5
  53   4.2Platfor m Installa tion and P reparation 5
  54   4.3Downloa d and Extr act Files5
  55   4.4Databas e Creation 5
  56   4.5Install ation Scri pts5
  57   4.6Cron Sc ripts5
  58   4.7Access  Requiremen ts and Ski lls Needed  for the I nstallatio n5
  59   4.8Install ation Proc edure5
  60   4.9Install ation Veri fication P rocedure6
  61   4.10System  Configura tion6
  62   4.11Databa se Tuning6
  63   5Back-Out  Procedure6
  64   5.1Back-Ou t Strategy 6
  65   5.2Back-Ou t Consider ations6
  66   5.2.1Load  Testing7
  67   5.2.2User  Acceptance  Testing7
  68   5.3Back-Ou t Criteria 7
  69   5.4Back-Ou t Risks7
  70   5.5Authori ty for Bac k-Out8
  71   5.6Back-Ou t Procedur e8
  72   5.7Back-ou t Verifica tion Proce dure8
  73   6Rollback  Procedure8
  74   6.1Rollbac k Consider ations8
  75   6.2Rollbac k Criteria 8
  76   6.3Rollbac k Risks9
  77   6.4Authori ty for Rol lback9
  78   6.5Rollbac k Procedur e9
  79   6.6Rollbac k Verifica tion Proce dure9
  80  
  81   Table of T ables
  82   Table 1: D eployment,  Installat ion, Back- out, and R ollback Ro les and Re sponsibili ties1
  83   Table 2: S ite Prepar ation3
  84   Table 3: F acility-Sp ecific Fea tures3
  85   Table 4: H ardware Sp ecificatio ns3
  86   Table 5: S oftware Sp ecificatio ns4
  87   Table 6: D eployment/ Installati on/Back-Ou t Checklis t4
  88  
  89  
  90  
  91   Introducti on
  92   This docum ent descri bes how to  deploy an d install  the IB*2.0 *621 patch  and how t o back-out  the produ ct and rol lback to a  previous  version or  data set.
  93   Purpose
  94   The purpos e of this  plan is to  provide a  single, c ommon docu ment that  describes  how, when,  where, an d to whom  IB*2.0*621  will be d eployed an d installe d, as well  as how th e patches  are to be  backed out  and rolle d back, if  necessary . The plan  also iden tifies res ources, co mmunicatio ns plan, a nd rollout  schedule.  Specific  instructio ns for ins tallation,  back-out,  and rollb ack are in cluded in  this docum ent.
  95   Dependenci es
  96   The follow ing patche s must be  installed  before IB* 2.0*621:
  97   IB*2.0*595
  98   IB*2.0*519
  99  
  100   Constraint s
  101   This patch  is intend ed for a f ully patch ed VistA s ystem.
  102   Roles and  Responsibi lities
  103   Table 1: D eployment,  Installat ion, Back- out, and R ollback Ro les and Re sponsibili ties
  104   ID
  105   Team
  106   Phase / Ro le
  107   Tasks
  108   Project Ph ase (See S chedule)
  109   1
  110   VA OI&T, V A OI&T Hea lth Produc t Support  & PMO (Lei dos)
  111   Deployment
  112   Plan and s chedule de ployment ( including  orchestrat ion with v endors)
  113   Planning
  114   2
  115   Local VAMC  and CPAC  processes
  116  
  117   Deployment
  118   Determine  and docume nt the rol es and res ponsibilit ies of tho se involve d in the d eployment.
  119   Planning
  120   3
  121   Field Test ing (Initi al Operati ng Capabil ity (IOC)) , Health P roduct Sup port Testi ng & VIP R elease Age nt Approva
  122   Deployment
  123   Test for o perational  readiness  
  124   Testing
  125   4
  126   Health Pro duct Suppo rt and Fie ld Operati ons
  127   Deployment
  128   Execute de ployment
  129   Deployment
  130   5
  131   Individual  Veterans  Affairs Me dical Cent ers (VAMCs )
  132   Installati on
  133   Plan and s chedule in stallation  
  134   Deployment
  135   6
  136    VIP Relea se Agent
  137   Installati on
  138   Ensure aut hority to  operate an d that cer tificate a uthority s ecurity do cumentatio n is in pl ace
  139   Deployment
  140   7
  141   N/A for th is patch a s we are u sing only  the existi ng VistA s ystem
  142   Installati on
  143   Validate t hrough fac ility POC  to ensure  that IT eq uipment ha s been acc epted usin g asset in ventory pr ocesses
  144   N/A
  145   8
  146   VA’s eBusi ness team
  147   Installati on
  148   Coordinate  training 
  149   Deployment
  150   9
  151   VIP releas e Agent, H ealth Prod uct Suppor t & the de velopment  team
  152   Back-out
  153   Confirm av ailability  of back-o ut instruc tions and  back-out s trategy (w hat are th e criteria  that trig ger a back -out) 
  154   Deployment
  155   10
  156   No changes  to curren t process  – we are u sing the e xisting Vi stA system
  157   Post Deplo yment
  158   Hardware,  Software a nd System  Support
  159   Warranty
  160   Deployment  
  161   The deploy ment is pl anned as a  national  rollout.
  162   This secti on provide s the sche dule and m ilestones  for the de ployment.
  163   Timeline 
  164   The deploy ment and i nstallatio n is sched uled to ru n for 30 d ays, as de picted in  the master  deploymen t schedule .
  165   Site Readi ness Asses sment
  166   This secti on discuss es the loc ations tha t will rec eive the I B*2.0*621  deployment
  167   Deployment  Topology  (Targeted  Architectu re)
  168   This patch  IB*2.0*62 1 is to be  nationall y released  to all VA MCs.
  169   Site Infor mation (Lo cations, D eployment  Recipients )
  170   The test s ites for I OC testing  are: TBD
  171   These site s will not  be define d here unt il the sit es have si gned the M emorandum  of Underst anding (MO Us) and te sting has  completed  as sometim es a site  has to sto p testing  prior to t he end of  IOC.
  172  
  173   Upon natio nal releas e all VAMC s are expe cted to in stall this  patch wit hin the co mpliance d ates.
  174   Site Prepa ration 
  175   The follow ing table  describes  preparatio n required  by the si te prior t o deployme nt.
  176   Table 2: S ite Prepar ation
  177   Site/Other
  178   Problem/Ch ange Neede d
  179   Features t o Adapt/Mo dify to Ne w Product
  180   Actions/St eps
  181   Owner
  182   N/A
  183   N/A
  184   N/A
  185   N/A
  186   N/A
  187   Resources
  188   Facility S pecifics
  189   The follow ing table  lists faci lity-speci fic featur es require d for depl oyment.
  190   Table 3: F acility-Sp ecific Fea tures
  191   Site
  192   Space/Room
  193   Features N eeded
  194   Other
  195   N/A
  196   N/A
  197   N/A
  198   N/A
  199   Hardware
  200   The follow ing table  describes  hardware s pecificati ons requir ed at each  site prio r to deplo yment.
  201   Table 4: H ardware Sp ecificatio ns
  202   Required H ardware
  203   Model
  204   Version
  205   Configurat ion
  206   Manufactur er
  207   Other
  208   Existing V istA syste m
  209   N/A
  210   N/A
  211   N/A
  212   N/A
  213   N/A
  214   Please see  the Roles  and Respo nsibilitie s table in  Section 2  for detai ls about w ho is resp onsible fo r preparin g the site  to meet t hese hardw are specif ications.
  215   Software 
  216   The follow ing table  describes  software s pecificati ons requir ed at each  site prio r to deplo yment.
  217   Table 5: S oftware Sp ecificatio ns
  218   Required S oftware
  219   Make
  220   Version
  221   Configurat ion
  222   Manufactur er
  223   Other
  224   Fully patc hed Integr ated Billi ng package  within Vi stA
  225   N/A
  226   2.0
  227   N/A
  228   N/A
  229   N/A
  230    IB*2.0*59 5
  231    N/A
  232   Nationally  released  version 
  233    N/A
  234   N/A
  235   N/A
  236    IB*2.0*51 9
  237    N/A
  238   Nationally  released  version 
  239    N/A
  240   N/A
  241   N/A
  242   Please see  the Roles  and Respo nsibilitie s table in  Section 2  above for  details a bout who i s responsi ble for pr eparing th e site to  meet these  software  specificat ions.
  243   Communicat ions
  244   The sites  that are p articipati ng in fiel d testing  (IOC) will  use the “ Patch Trac king” mess age in Out look to co mmunicate  with the e Business e Insurance  sub-team,  the develo pers, and  product su pport pers onnel.
  245   Deployment /Installat ion/Back-O ut Checkli st
  246   The Releas e Manageme nt team wi ll deploy  the patch  IB*2.0*621 , which is  tracked i n the Nati onal Patch  Module (N PM) in For um, nation ally to al l VAMCs. F orum autom atically t racks the  patches as  they are  installed  in the dif ferent VAM C producti on systems . One can  run a repo rt in Foru m to ident ify when a nd by whom  the patch  was insta lled in th e VistA pr oduction a t each sit e. A repor t can also  be run to  identify  which site s have not  currently  installed  the patch  in their  VistA prod uction sys tems. Ther efore, thi s informat ion does n ot need to  be manual ly tracked  in the ch art below.
  247   Table 6: D eployment/ Installati on/Back-Ou t Checklis t
  248   Activity
  249   Day
  250   Time
  251   Individual  who compl eted task
  252   Deploy
  253   N/A
  254   N/A
  255   N/A
  256   Install
  257   N/A
  258   N/A
  259   N/A
  260   Back-Out
  261   N/A
  262   N/A
  263   N/A
  264  
  265   Installati on
  266   Pre-instal lation and  System Re quirements
  267   IB*2.0*621 , a patch  to the exi sting Vist A Integrat ed Billing  2.0 packa ge, is ins tallable o n a fully  patched M( UMPS) Vist A system a nd operate s on top o f the Vist A environm ent provid ed by the  VistA infr astructure  packages.  The latte r provides  utilities  which com municate w ith the un derlying o perating s ystem and  hardware,  providing  Integrated  Billing i ndependenc e from var iations in  hardware  and operat ing system .
  268   Platform I nstallatio n and Prep aration
  269   Refer to t he IB*2.0* 621 docume ntation on  the Natio nal Patch  Module (NP M) on Foru m for the  detailed i nstallatio n instruct ions. Thes e instruct ions will  include an y pre inst allation s teps if ap plicable.
  270   Download a nd Extract  Files
  271   Refer to t he IB*2.0* 621 docume ntation on  the NPM t o find the  location  of related  documenta tion that  can be dow nloaded. I B*2.0*621  will be tr ansmitted  via a Pack Man messag e and can  be pulled  from the N PM.  It is  not a hos t file, an d therefor e does not  need to b e download ed separat ely.
  272   Database C reation
  273   IB*2.0*621  does modi fy the Vis tA databas e. Changes  can be fo und in the  NPM docum entation f or this pa tch on For um.
  274   Installati on Scripts
  275   No install ation scri pts are ne eded for I B*2.0*621  installati on.
  276   Cron Scrip ts
  277   No Cron sc ripts are  needed for  IB*2.0*62 1 installa tion.
  278   Access Req uirements  and Skills  Needed fo r the Inst allation
  279   The follow ing staff  need acces s to the P ackMan mes sage conta ining the  IB*2.0*621  patch or  Forum’s NP M in order  to downlo ad the nat ionally re leased IB* 2.0*621 pa tch. The s oftware is  to be ins talled by  the sites  or regions  designate d: VA OI&T  IT OPERAT IONS SERVI CE, Enterp rise Servi ce Lines,  and/or Vis tA Applica tions Divi sion.
  280   Installati on Procedu re
  281   Refer to t he IB*2.0* 621 docume ntation on  the NPM f or the det ailed inst allation i nstruction s.
  282   Installati on Verific ation Proc edure
  283   Refer to t he IB*2.0* 621 docume ntation on  the NPM f or detaile d installa tion instr uctions. T hese instr uctions in clude any  post insta llation st eps if app licable.
  284   System Con figuration
  285   No system  configurat ion change s are requ ired for t his patch.
  286   Database T uning
  287   No reconfi guration o f the Vist A database , memory a llocations  or other  resources  is necessa ry.
  288   Back-Out P rocedure
  289   Back-Out p ertains to  a return  to the las t known va lid instan ce of oper ational so ftware and  platform  settings.
  290   Back-Out S trategy
  291   Although i t is unlik ely, due t o care in  collecting , elaborat ing, and d esigning a pproved us er stories , followed  by multip le testing  stages (D eveloper U nit Testin g, Compone nt Integra tion Testi ng, SQA Te sting, and  User Acce ptance Tes ting), a b ack-out de cision due  to major  issues wit h this pat ch could o ccur durin g site Mir ror Testin g, Site Pr oduction T esting or  after Nati onal Relea se to the  field (VAM Cs).  The  best strat egy is dep endent on  the stage  during whi ch the dec ision is m ade.
  292  
  293   If during  Mirror tes ting or Si te Product ion Testin g, a new v ersion of  a defect c orrecting  test patch  is produc ed, retest ed and suc cessfully  passes dev elopment t eam testin g, it woul d be resub mitted to  the site f or testing . If the p atch produ ced catast rophic pro blems, a n ew version  of the pa tch can be  used to r estore the  build com ponents to  their pre -patch con dition.
  294  
  295   If the def ect(s) wer e not disc overed unt il after n ational re lease but  during the  designate d support  period, a  new patch  will be en tered into  the Natio nal Patch  Module on  Forum and  go through  all the n ecessary m ilestone r eviews etc ., as a pa tch for a  patch. It  is up to V A OI&T and  product s upport whe ther this  new patch  would be d efined as  an emergen cy patch o r not. Thi s new patc h could be  used to a ddress spe cific issu es pertain ing to the  original  patch or c ould be us ed to rest ore the bu ild compon ents to th eir origin al pre-pat ch conditi on.
  296  
  297   After the  support pe riod, the  VistA Main tenance Pr ogram woul d produce  the new pa tch, eithe r to corre ct the def ective com ponents or  to back-o ut the pat ch.
  298   Back-Out C onsiderati ons
  299   It is nece ssary to d etermine i f a wholes ale back-o ut of the  patch IB*2 .0*621 is  needed or  if a bette r course o f action i s to corre ct through  a new ver sion of th e patch (i f prior to  national  release) o r through  a subseque nt patch a imed at sp ecific are as modifie d or affec ted by the  original  patch (aft er nationa l release) .  A whole sale back- out of the  patch wil l still re quire a ne w version  (if prior  to nationa l release)  or a subs equent pat ch (after  national r elease).   If the bac k-out is p ost-releas e of this  patch IB*2 .0*621, th is patch s hould be a ssigned st atus of “E ntered in  Error” in  Forum’s NP M.
  300   Load Testi ng
  301   N/A. The b ack-out pr ocess if n ecessary i s executed  at normal , rather t han raised  job prior ity, and i s expected  to have n o signific ant effect  on total  system per formance.  Subsequent  to the re version, t he perform ance deman ds on the  system wou ld be unch anged.
  302   User Accep tance Test ing
  303   Adjusted t he VistA s oftware th at purges  electronic  Insurance  Verificat ion (eIV)  related
  304    inquiries  and respo nses, incl uding reco rds contai ned in the  new EIV E ICD TRACKI NG (#365.1 8) file (T RACKING),  to correct ly evaluat e the "Do  Not Purge"  field (#3 65,.11) fo und
  305   on the IIV  Response  File (#365 ) (RESPONS E) record.  When a ca ndidate RE SPONSE
  306   record con tains a "D o Not Purg e" field s et to "1"  (Yes), the  RESPONSE  record, th
  307   associated  IIV TRANS MISSION QU EUE (#365. 1) file (T Q) record  and the as sociated 
  308   EIV EICD T RACKING (# 365.18) re cord will  be retaine d. Only th ose RESPON SE records
  309   (plus the  associated  TQ and TR ACKING rec ords) that  meet the  criteria f or purging  and 
  310   have a "Do  Not Purge " field se t to "0" ( No) will b e deleted.
  311    
  312   Note: A TR ACKING rec ord may po int to 1 ( one) or mo re sets of  TQ and RE SPONSE 
  313   records. I f any RESP ONSE recor d associat ed with a  TRACKING r ecord cont ains a 
  314   "Do Not Pu rge" field  set to "1 " (Yes) th en all ass ociated TQ  and RESPO NSE record
  315   of that TR ACKING rec ord will b e retained . There is  no limit  to the num ber of set s of
  316   TQ and RES PONSE reco rds that c an be asso ciated wit h a TRACKI NG record.
  317  
  318  
  319   VistA has  been enhan ced to cre ate Electr onic Insur ance Cover age Discov ery (EICD)  identific ation inqu iries for  scheduled  patients t hat have n o active i nsurance i nformation
  320   The "No In surance" e xtract (#4 ) has been  recommiss ioned as t he "EICD"  extract an d
  321   rewritten  to examine  upcoming  appointmen ts for pat ients with out active  insurance .
  322   Those pati ents are t hen forwar ded via He alth Level  Seven (HL 7) transac tions to t he
  323   Financial  Services C enter (FSC ) which in  turn will  forward t hem to our  discovery  service
  324   vendor. Al l identifi cation res ults (disc overed ins urance or  not) are r eturned to  VistA via
  325   FSC at whi ch time no rmal insur ance verif ication in quiries ma y be issue d to the p roper
  326   payers. Wh en discove red insura nces are f or eIV pay ers that a re both lo cally and 
  327   nationally  active, V istA will  automatica lly genera te and tra nsmit a no rmal 270 m essage
  328   to the pay er for ver ification.  Any ident ification  results re turned to  VistA wher e the
  329   discovered  insurance  are for a  non-eIV p ayer or th e eIV paye r is not l ocally/nat ionally
  330   active, wi ll be save d to the I NSURANCE V ERIFICATIO N PROCESSO R (#355.33 ) file
  331   (Buffer) f or manual  processing  via VistA  or the th ird party  software I CB (Insura nce
  332   Capture Bu ffer).
  333   Back-Out C riteria
  334   The projec t is cance led or the  requested  changes i mplemented  by IB*2.0 *621 are n o longer d esired by  VA OI&T an d the eBus iness eIns urance sub -team, or  the patch  produces c atastrophi c problems .
  335   Back-Out R isks
  336   Since the  eInsurance  software  is tightly  integrate d with ext ernal syst ems, any a ttempt at  a back-out  should in clude clos e consulta tion with  the extern al trading  partners  such as th e Financia l Services  Center (F SC) and th e Health C are Cleari ng House ( HCCH) to d etermine r isk.
  337   Authority  for Back-O ut
  338   The order  would come  jointly f rom: relea se coordin ator (prod uct suppor t), portfo lio direct or and hea lth produc t support.  This shou ld be done  in consul tation wit h the deve lopment te am and ext ernal trad ing partne rs such as  FSC and t he HCCH to  determine  the appro priate cou rse of act ion. eInsu rance is t ightly int egrated wi th these e xternal pa rtners and  a back-ou t of the p atch shoul d not be a  standalon e decision .
  339   Back-Out P rocedure
  340   The rollba ck plan fo r VistA ap plications  is comple x and not  a “one siz e fits all ” solution . The gene ral strate gy for a V istA rollb ack is to  repair the  code with  a follow- up patch.  The develo pment team  recommend s that sit es log a t icket if i t is a nat ionally re leased pat ch. If not , the site  should co ntact the  Enterprise  Program M anagement  Office (EP MO) team d irectly fo r specific  solutions  to its un ique probl ems.
  341  
  342   The IB*2.0 *621 patch  contains  the follow ing build  components :
  343   Routine 
  344   Enhancemen
  345   Data Dicti onary 
  346   Input Temp late
  347   Other
  348  
  349   While the  VistA inst allation p rocedure o f the KIDS  build all ows the in staller to  back up t he modifie d routines  using the  ‘Backup a  Transport  Global’ a ction, the  back-out  procedure  for global , data dic tionary an d other Vi stA compon ents is mo re complex  and requi res issuan ce of a fo llow-up pa tch to ens ure all co mponents a re properl y removed  and/or res tored. All  software  components  (routines  and other  items) mu st be rest ored to th eir previo us state a t the same  time and  in conjunc tion with  the restor ation of t he data.
  350  
  351   Please con tact the E PMO team f or assista nce since  this insta lled patch  contains  components  in additi on to rout ines.
  352   Back-out V erificatio n Procedur e
  353   Successful  back-out  is confirm ed by veri fication t hat the ba ck-out pat ch was suc cessfully  installed.
  354   Rollback P rocedure
  355   Rollback p ertains to  data. The  only data  changes i n this pat ch are spe cific to t he operati onal softw are and pl atform set tings and  they are c overed in  the Back-o ut procedu res detail ed elsewhe re in this  document.
  356   Rollback C onsiderati ons
  357   Not applic able.
  358   Rollback C riteria
  359   Not applic able.
  360   Rollback R isks
  361   Not applic able.
  362   Authority  for Rollba ck
  363   Not applic able.
  364   Rollback P rocedure
  365   Not applic able.
  366   Rollback V erificatio n Procedur e
  367   Not applic able.
  368  
  369   Template R evision Hi story
  370   Date
  371   Version
  372   Descriptio n
  373   Author
  374   March 2016
  375   2.2
  376   Changed th e title fr om Install ation, Bac k-Out, and  Rollback  Guide to D eployment  and Instal lation Gui de, with t he underst anding tha t Back-Out  and Rollb ack belong  with Inst allation. 
  377   VIP Team
  378   February 2 016
  379   2.1
  380   Changed ti tle from I nstallatio n, Back-Ou t, and Rol lback Plan  to Instal lation, Ba ck-Out, an d Rollback  Guide as  recommende d by OI&T  Documentat ion Standa rds Commit tee
  381   OI&T Docum entation S tandards C ommittee
  382   December 2 015
  383   2.0
  384   The OI&T D ocumentati on Standar ds Committ ee merged  the existi ng “Instal lation, Ba ck-Out, Ro llback Pla n” templat e with the  content r equirement s in the O I&T End-us er Documen tation Sta ndards for  a more co mprehensiv e Installa tion Plan.
  385   OI&T Docum entation S tandards C ommittee
  386   February 2 015
  387   1.0
  388   Initial Dr aft
  389   Lifecycle  and Releas e Manageme nt
  390