1. EPMO Open Source Coordination Office Redaction File Detail Report

Produced by Araxis Merge on 4/17/2018 8:06:16 PM Central Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.

1.1 Files compared

# Location File Last Modified
1 MCCF EDI TAS ePharmacy 031218.zip\MCCF EDI TAS ePharmacy 031218 bps_1_0_p23_ig.docx Wed Feb 14 13:52:53 2018 UTC
2 MCCF EDI TAS ePharmacy 031218.zip\MCCF EDI TAS ePharmacy 031218 bps_1_0_p23_ig.docx Mon Apr 16 17:05:54 2018 UTC

1.2 Comparison summary

Description Between
Files 1 and 2
Text Blocks Lines
Unchanged 1 1202
Changed 0 0
Inserted 0 0
Removed 0 0

1.3 Comparison options

Whitespace
Character case Differences in character case are significant
Line endings Differences in line endings (CR and LF characters) are ignored
CR/LF characters Not shown in the comparison detail

1.4 Active regular expressions

No regular expressions were active.

1.5 Comparison detail

  1   Medical Ca re Collect ion Fund ( MCCF) Elec tronic Dat a Intercha nge (EDI)  Transactio n Applicat ions Suite  (TAS) ePh armacy Bui ld 3 & 4
  2   Electronic  Claims Ma nagement E ngine BPS* 1.0*23Outp atient Pha rmacy PSO* 7.0*482Int egrated Bi lling IB*2 .0*591
  3   Deployment , Installa tion, Back -Out, and  Rollback G uide
  4   Version 1. 0
  5  
  6  
  7   June 2018
  8   Department  of Vetera ns Affairs
  9   Office of  Informatio n and Tech nology (OI &T)
  10  
  11  
  12   Revision H istory
  13   Date
  14   Version
  15   Descriptio n
  16   Author
  17   June 2018
  18   1.0
  19   Initial Ve rsion
  20   Mark Dawso n
  21  
  22   Artifact R ationale
  23   This docum ent descri bes the De ployment,  Installati on, Back-o ut, and Ro llback Pla n for new  products g oing into  the VA Ent erprise. T he plan in cludes inf ormation a bout syste m support,  issue tra cking, esc alation pr ocesses, a nd roles a nd respons ibilities  involved i n all thos e activiti es. Its pu rpose is t o provide  clients, s takeholder s, and sup port perso nnel with  a smooth t ransition  to the new  product o r software , and shou ld be stru ctured app ropriately , to refle ct particu lars of th ese proced ures at a  single or  at multipl e location s.
  24   Per the Ve teran-focu sed Integr ated Proce ss (VIP) G uide, the  Deployment , Installa tion, Back -out, and  Rollback P lan is req uired to b e complete d prior to  Critical  Decision P oint #2 (C D #2), wit h the expe ctation th at it will  be update d througho ut the lif ecycle of  the projec t for each  build, as  needed.
  25  
  26  
  27  
  28  
  29   Table of C ontents
  30   1Introduct ion1
  31   1.1Purpose 1
  32   1.2Depende ncies1
  33   1.3Constra ints1
  34   2Roles and  Responsib ilities1
  35   3Deploymen t2
  36   3.1Timelin e2
  37   3.2Site Re adiness As sessment2
  38   3.2.1Deplo yment Topo logy (Targ eted Archi tecture)2
  39   3.2.2Site  Informatio n (Locatio ns, Deploy ment Recip ients)2
  40   3.2.3Site  Preparatio n3
  41   3.3Resourc es3
  42   3.3.1Facil ity Specif ics3
  43   3.3.2Hardw are3
  44   3.3.3Softw are3
  45   3.3.4Commu nications4
  46   3.3.4.1Dep loyment/In stallation /Back-Out  Checklist4
  47   4Installat ion4
  48   4.1Pre-ins tallation  and System  Requireme nts4
  49   4.2Platfor m Installa tion and P reparation 5
  50   4.3Downloa d and Extr act Files5
  51   4.4Databas e Creation 5
  52   4.5Install ation Scri pts5
  53   4.6Cron Sc ripts5
  54   4.7Access  Requiremen ts and Ski lls Needed  for the I nstallatio n5
  55   4.8Install ation Proc edure5
  56   4.9Install ation Veri fication P rocedure5
  57   4.10System  Configura tion5
  58   4.11Databa se Tuning5
  59   5Back-Out  Procedure6
  60   5.1Back-Ou t Strategy 6
  61   5.1.1Mirro r Testing  or Site Pr oduction T esting6
  62   5.1.2After  National  Release bu t During t he Designa ted Suppor t Period6
  63   5.1.3After  National  Release an d Warranty  Period6
  64   5.2Back-Ou t Consider ations6
  65   5.2.1Load  Testing6
  66   5.2.2User  Acceptance  Testing6
  67   5.3Back-Ou t Criteria 8
  68   5.4Back-Ou t Risks8
  69   5.5Authori ty for Bac k-Out8
  70   5.6Back-Ou t Procedur e8
  71   5.7Back-ou t Verifica tion Proce dure9
  72   6Rollback  Procedure9
  73   6.1Rollbac k Consider ations9
  74   6.2Rollbac k Criteria 9
  75   6.3Rollbac k Risks9
  76   6.4Authori ty for Rol lback9
  77   6.5Rollbac k Procedur e9
  78   6.6Rollbac k Verifica tion Proce dure9
  79  
  80   Table of T ables
  81   Table 1: D eployment,  Installat ion, Back- out, and R ollback Ro les and Re sponsibili ties1
  82   Table 2: S ite Prepar ation3
  83   Table 3: F acility-Sp ecific Fea tures3
  84   Table 4: H ardware Sp ecificatio ns3
  85   Table 5: S oftware Sp ecificatio ns4
  86   Table 6: D eployment/ Installati on/Back-Ou t Checklis t4
  87  
  88  
  89  
  90   Introducti on
  91   This docum ent descri bes how to  deploy an d install  the multi- build BPS  IB PSO BUN DLE 11.0 ( which incl udes BPS*1 .0*23, IB* 2.0*591, P SO*7.0*482 ) and how  to back-ou t the prod uct and ro llback to  a previous  version o r data set .
  92   Purpose
  93   The purpos e of this  plan is to  provide a  single, c ommon docu ment that  describes  how, when,  where, an d to whom  the multi- build BPS  IB PSO BUN DLE 11.0 ( which incl udes BPS*1 .0*23, IB* 2.0*591, P SO*7.0*482 ) will be  deployed a nd install ed, as wel l as how i t is to be  backed ou t and roll ed back, i f necessar y. The pla n identifi es resourc es, commun ications p lan, and r ollout sch edule. Spe cific inst ructions f or install ation, bac k-out, and  rollback  are includ ed in this  document.
  94   Dependenci es
  95   BPS*1.0*21  and BPS*1 .0*22 must  be instal led BEFORE  BPS*1*23.
  96   IB*2.0*550  must be i nstalled B EFORE IB*2 .0*591.
  97   PSO*7.0*31 8, PSO*7.0 *409, PSO* 7.0*422, P SO*7.0*459 , and PSO* 7.0*478 mu st be inst alled BEFO RE PSO*7*4 82.
  98   Constraint s
  99   This patch  is intend ed for a f ully patch ed VistA s ystem.
  100   Roles and  Responsibi lities
  101   Table 1: D eployment,  Installat ion, Back- out, and R ollback Ro les and Re sponsibili ties
  102   ID
  103   Team
  104   Phase / Ro le
  105   Tasks
  106   Project Ph ase (See S chedule)
  107   1
  108   VA OI&T, V A OI&T Hea lth Produc t Support,  and PMO ( Leidos)
  109   Deployment
  110   Plan and s chedule de ployment ( including  orchestrat ion with v endors)
  111   Planning
  112   2
  113   Local VAMC  and CPAC  processes
  114  
  115  
  116   Deployment
  117   Determine  and docume nt the rol es and res ponsibilit ies of tho se involve d in the d eployment.
  118   Planning
  119   3
  120   Field Test ing (Initi al Operati ng Capabil ity - IOC) , Health P roduct Sup port Testi ng & VIP R elease Age nt Approva
  121   Deployment
  122   Test for o perational  readiness  
  123   Testing
  124   4
  125   Health pro duct Suppo rt and Fie ld Operati ons
  126   Deployment
  127   Execute de ployment
  128   Deployment
  129   5
  130   Individual  Veterans  Administra tion Medic al Centers  (VAMCs)
  131   Installati on
  132   Plan and s chedule in stallation  
  133   Deployment
  134   6
  135    VIP Relea se Agent
  136   Installati on
  137   Ensure aut hority to  operate an d that cer tificate a uthority s ecurity do cumentatio n is in pl ace
  138   Deployment
  139   7
  140  
  141   Installati on
  142   Validate t hrough fac ility POC  to ensure  that IT eq uipment ha s been acc epted usin g asset in ventory pr ocesses
  143   N/A; only  existing V istA syste m will be  used
  144   8
  145   VA’s eBusi ness team
  146   Installati ons
  147   Coordinate  training 
  148   Deployment
  149   9
  150   VIP releas e Agent, H ealth Prod uct Suppor t & the de velopment  team
  151   Back-out
  152   Confirm av ailability  of back-o ut instruc tions and  back-out s trategy (w hat are th e criteria  that trig ger a back -out) 
  153   Deployment
  154   10
  155   VA OI&T, V A OI&T Hea lth Produc t Support,  and MCCF  EDI TAS De velopment  Team (Half aker)
  156   Post Deplo yment
  157   Hardware,  Software a nd System  Support
  158   Warranty
  159   Deployment
  160   The deploy ment is pl anned as a  national  rollout.
  161   This secti on provide s the sche dule and m ilestones  for the de ployment.
  162   Timeline
  163   The durati on of depl oyment and  installat ion is 30  days, as d epicted in  the maste r deployme nt schedul e.
  164   Site Readi ness Asses sment
  165   This secti on discuss es the loc ations tha t will rec eive the d eployment  of the mul ti-build B PS IB PSO  BUNDLE 11. 0 (which i ncludes BP S*1.0*23,  IB*2.0*591 , PSO*7.0* 482).
  166   Deployment  Topology  (Targeted  Architectu re)
  167   This multi -build BPS  IB PSO BU NDLE 11.0  (which inc ludes BPS* 1.0*23, IB *2.0*591,  PSO*7.0*48 2) is to b e national ly release d to all V AMCs.
  168   Site Infor mation (Lo cations, D eployment  Recipients )
  169   The IOC si tes are:
  170   Birmingham
  171   Eastern Ka nsas
  172   Lexington
  173   Little Roc k
  174   Richmond
  175  
  176   Upon natio nal releas e all VAMC s are expe cted to in stall this  patch pri or to or o n the comp liance dat e.
  177   Site Prepa ration
  178   The follow ing table  describes  preparatio n required  by the si te prior t o deployme nt.
  179   Table 2: S ite Prepar ation
  180   Site/Other
  181   Problem/Ch ange Neede d
  182   Features t o Adapt/Mo dify to Ne w Product
  183   Actions/St eps
  184   Owner
  185   N/A
  186   N/A
  187   N/A
  188   N/A
  189   N/A
  190   Resources
  191   Facility S pecifics
  192   The follow ing table  lists faci lity-speci fic featur es require d for depl oyment.
  193   Table 3: F acility-Sp ecific Fea tures
  194   Site
  195   Space/Room
  196   Features N eeded
  197   Other
  198   N/A
  199   N/A
  200   N/A
  201   N/A
  202   Hardware
  203   The follow ing table  describes  hardware s pecificati ons requir ed at each  site prio r to deplo yment.
  204   Table 4: H ardware Sp ecificatio ns
  205   Required H ardware
  206   Model
  207   Version
  208   Configurat ion
  209   Manufactur er
  210   Other
  211   Existing V istA syste m
  212   N/A
  213   N/A
  214   N/A
  215   N/A
  216   N/A
  217   Please see  the Roles  and Respo nsibilitie s table in  Section 2  for detai ls about w ho is resp onsible fo r preparin g the site  to meet t hese hardw are specif ications.
  218   Software
  219   The follow ing table  describes  software s pecificati ons requir ed at each  site prio r to deplo yment.
  220   Table 5: S oftware Sp ecificatio ns
  221   Required S oftware
  222   Make
  223   Version
  224   Configurat ion
  225   Manufactur er
  226   Other
  227   Fully patc hed Electr onic Claim s Manageme nt Engine  package wi thin VistA
  228   N/A
  229   1.0
  230   N/A
  231   N/A
  232   N/A
  233   Fully patc hed Integr ated Billi ng package  within Vi stA
  234   N/A
  235   2.0
  236   N/A
  237   N/A
  238   N/A
  239   Fully patc hed Outpat ient Pharm acy packag e within V istA
  240   N/A
  241   7.0
  242   N/A
  243   N/A
  244   N/A
  245   Prerequisi te patches  in BPS, I B, PSO yet  to be det ermined
  246   N/A
  247   Nationally  released  version
  248   N/A
  249   N/A
  250   N/A
  251   Please see  the Roles  and Respo nsibilitie s table in  Section 2  above for  details a bout who i s responsi ble for pr eparing th e site to  meet these  software  specificat ions.
  252   Communicat ions
  253   The sites  that are p articipati ng in fiel d testing  (IOC) will  use the “ Patch Trac king” mess age in Out look to co mmunicate  with the e Pharmacy e Business t eam, the d evelopers,  and produ ct support  personnel .
  254   Deployment /Installat ion/Back-O ut Checkli st
  255   The Releas e Manageme nt team wi ll deploy  the multi- build BPS  IB PSO BUN DLE 11.0,  which is t racked nat ionally fo r all VAMC s in the N ational Pa tch Module  (NPM) in  Forum. For um automat ically tra cks the pa tches as t hey are in stalled in  the diffe rent VAMC  production  systems.  One can ru n a report  in Forum  to identif y when and  by whom t he patch w as install ed into th e VistA pr oduction a t each sit e. A repor t can also  be run to  identify  which site s have not  currently  installed  the patch  into thei r VistA pr oduction s ystem. The refore, th is informa tion does  not need t o be manua lly tracke d in the c hart below .
  256  
  257   Table 6: D eployment/ Installati on/Back-Ou t Checklis t
  258   Activity
  259   Day
  260   Time
  261   Individual  who compl eted task
  262   Deploy
  263   N/A
  264   N/A
  265   N/A
  266   Install
  267   N/A
  268   N/A
  269   N/A
  270  
  271   Installati on
  272   Pre-instal lation and  System Re quirements
  273   Multi-buil d BPS IB P SO BUNDLE  11.0 is in stallable  on a fully  patched M (UMPS) Vis tA system  and operat es on the  top of the  VistA env ironment p rovided by  the VistA  infrastru cture pack ages. The  latter pro vides util ities whic h communic ate with t he underly ing operat ing system  and hardw are, there by providi ng each Vi stA packag e independ ence from  variations  in hardwa re and ope rating sys tem.
  274   Platform I nstallatio n and Prep aration
  275   Refer to t he BPS*1.0 *23 docume ntation on  the NPM i n Forum fo r the deta iled insta llation in structions . These in structions  include a ny pre-ins tallation  steps if a pplicable.
  276   Download a nd Extract  Files
  277   Refer to t he BPS*1.0 *23, IB*2. 0*591, PSO *7.0*482 d ocumentati on on the  NPM to fin d related  documentat ion that c an be down loaded. Th e patch de scription  of each pa tch will b e transmit ted as a M ailMan mes sage from  the NPM an d this mes sage can b e pulled f rom the NP M. The pat ches thems elves are  bundled to gether int o the mult i-build BP S IB PSO B UNDLE 11.0 . The host  file cont aining the se patches  must be d ownloaded  separately . The file  name is B PS_1_23_IB _PSO.KID a nd it can  be found o n the ANON YMOUS.SOFT WARE direc tory on an y of the V istA SFTP  servers (H ines, Salt  Lake City ).
  278   Database C reation
  279   Multi-buil d BPS IB P SO BUNDLE  11.0 modif ies the Vi stA databa se. All ch anges can  be found o n the NPM  documentat ion for th is patch. 
  280   Installati on Scripts
  281   No install ation scri pts are ne eded for m ulti-build  BPS IB PS O BUNDLE 1 1.0 instal lation.
  282   Cron Scrip ts
  283   No Cron sc ripts are  needed for  multi-bui ld BPS IB  PSO BUNDLE  11.0 inst allation.
  284   Access Req uirements  and Skills  Needed fo r the Inst allation
  285   Staff perf orming the  installat ion of thi s multi-bu ild will n eed access  to FORUM’ s NPM to v iew all pa tch descri ptions. St aff will a lso need a ccess and  ability to  download  the host f ile from o ne of the  VA’s SFTP  servers. T he softwar e is to be  installed  by each s ite’s or r egion’s de signated V A OI&T IT  OPERATIONS  SERVICE,  Enterprise  Service L ines, Vist a Applicat ions Divis ion.
  286   Installati on Procedu re
  287   Detailed i nstruction s for inst alling the  multi-bui ld BPS IB  PSO BUNDLE  11.0 (whi ch include s BPS*1.0* 23, IB*2.0 *591, PSO* 7.0*482) c an be foun d on the p atch descr iption for  BPS*1.0*2 3, which c an be foun d on the N PM. Instal ling the m ulti-build  BPS IB PS O BUNDLE 1 1.0 will i nstall all  three com ponent pat ches (BPS* 1.0*23, IB *2.0*591,  PSO*7.0*48 2).
  288   Installati on Verific ation Proc edure
  289   Refer to t he BPS*1.0 *23 docume ntation on  the NPM f or detaile d installa tion instr uctions. T hese instr uctions in clude any  post insta llation st eps if app licable.
  290   System Con figuration
  291   No system  configurat ion change s are requ ired for t his patch.
  292   Database T uning
  293   No reconfi guration o f the Vist A database , memory a llocations  or other  resources  is necessa ry.
  294   Back-Out P rocedure
  295   Back-Out p ertains to  a return  to the las t known go od operati onal state  of the so ftware and  appropria te platfor m settings .
  296   Back-Out S trategy
  297   A decision  to back o ut could b e made dur ing Site M irror Test ing, durin g Site Pro duction Te sting, or  after Nati onal Relea se to the  field (VAM Cs). The b est strate gy decisio n is depen dent on th e stage of  testing d uring whic h the deci sion is ma de.
  298   Mirror Tes ting or Si te Product ion Testin g
  299   If a decis ion to bac k out is m ade during  Mirror Te sting or S ite Produc tion Testi ng, a new  version of  the patch  can be us ed to rest ore the bu ild compon ents to th eir pre-pa tch condit ion.
  300   After Nati onal Relea se but Dur ing the De signated S upport Per iod
  301   If a decis ion to bac k out is m ade after  national r elease and  within th e designat ed support  period, a  new patch  will be e ntered int o the NPM  in Forum a nd will go  through a ll the nec essary mil estone rev iews, etc.  as a patc h for a pa tch. This  patch coul d be defin ed as an e mergency p atch, and  it could b e used to  address sp ecific iss ues pertai ning to th e original  patch or  it could b e used to  restore th e build co mponents t o their or iginal pre -patch con dition.
  302   After Nati onal Relea se and War ranty Peri od
  303   After the  support pe riod, the  VistA Main tenance Pr ogram will  produce t he new pat ch, either  to correc t the defe ctive comp onents or  restore th e build co mponents t o their or iginal pre -patch con dition.
  304   Back-Out C onsiderati ons
  305   Changes im plemented  with multi -build BPS  IB PSO BU NDLE 11.0  can be bac ked out in  their ent irety or o n an enhan cement-by- enhancemen t basis. E ither coul d be accom plished vi a a new ve rsion of m ulti-build  BPS IB PS O BUNDLE 1 1.0 if bef ore nation al release  or a new  multi-buil d if after  national  release.
  306   Load Testi ng
  307   N/A. The b ack-out pr ocess will  be execut ed at norm al rather  than raise d job prio rity and i s expected  to have n o signific ant effect  on total  system per formance.  Subsequent  to the re version, t he perform ance deman ds on the  system wil l be uncha nged.
  308   User Accep tance Test ing
  309   Below are  the accept ance crite ria for ea ch story i ncluded in  BPS IB PS O BUNDLE 1 1.0.
  310  
  311   US19
  312   VistA ECME  stores pe rmanent ph armacy cla im data us ing correc t field si zes as man dated by t he HIPAA N CPDP stand ard.
  313   VistA ECME  sends pha rmacy clai m data usi ng correct  field siz es as mand ated by th e HIPAA NC PDP standa rd.
  314   The follow ing screen s have bee n modified  to displa y correct  field leng ths for Na me of Insu red, Group  Number, G roup Name,  and Subsc riber ID:
  315   Match Mult iple Group  Plans Opt ion [IBCNR  GROUP PLA N MATCH]
  316   Match Grou p Plan to  a Pharmacy  Option [I BCNR PLAN  MATCH]
  317   Third Part y Payer Re jects – Vi ew/Process  [PSO REJE CTS VIEW/P ROCESS] (R eject Noti fication S creen)
  318   Third Part y Payer Re jects - Wo rklist [PS O REJECTS  WORKLIST]  (Reject No tification  Screen)
  319   The follow ing report s have bee n modified  to displa y correct  field leng ths for Na me of Insu red, Group  Number, G roup Name,  and Subsc riber ID:
  320   Group Plan  Worksheet  Report [I BCNR GROUP  PLAN WORK SHEET]
  321   Rejected C laims Repo rt [BPS RP T REJECTIO N]
  322   Closed Cla ims Report  [BPS RPT  CLOSED CLA IMS]
  323   Payable Cl aims Repor t [BPS RPT  PAYABLE]
  324   Reversal C laims Repo rt [BPS RP T REVERSAL ]
  325   Claims Sub mitted, No t Yet Rele ased [BPS  RPT NOT RE LEASED]
  326   Recent Tra nsactions  [BPS RPT R ECENT TRAN SACTIONS]
  327   File IB NC PDP EVENT  LOG popula tes with t he correct  informati on before  and after  the instal lation of  patch IB*2 .0*497 for  the follo wing field s:
  328   GROUP ID ( .06)
  329   CARDHOLDER  ID (.07)
  330   CARDHOLDER  FIRST NAM E (.101)
  331   CARDHOLDER  LAST NAME  (.102)
  332   GROUP NAME  (.301)
  333  
  334   US124
  335   Fill a pre scription  for a pati ent with T RICARE eli gibility,  primary OH I insuranc e and TRIC ARE Expres s Scripts  secondary  coverage.   The prima ry claim w ill transm it automat ically if  the insura nce file i s set up c orrectly.   Use the t esting too l to make  the primar y claim pa yable and  to add an  amount for  PATIENT P AY AMOUNT.   Bill the  TRICARE s econdary c overage us ing the PR O option.   The PRO o ptions sho w the corr ect inform ation, the  secondary  transacti on populat ed with th e correct  primary cl aim inform ation in t he COB fie lds (liste d above) a nd the inf ormation i s stored i n VistA.   Use CRI Cl aim Respon se Inquiry  to verify  informati on is stor ed in Vist A.
  336   Fill a pre scription  for a pati ent with T RICARE eli gibility,  primary OH I insuranc e and TRIC ARE Expres s Scripts  secondary  coverage.   The prima ry claim w ill transm it automat ically if  the insura nce file i s set up c orrectly.   Close the  primary c laim on th e ECME Use r Screen.   Bill the  TRICARE se condary co verage usi ng the PRO  option.   The PRO op tion shows  the corre ct informa tion, the  secondary  transactio n populate d with the  correct i nformation  from the  primary cl aim in the  COB field s (listed  above) and  the infor mation is  stored in  VistA. Use  CRI Claim  Response  Inquiry to  verify in formation  is stored  in VistA.
  337   VistA stor es the Pat ient Pay A mount.  Us e CRI Clai m Response  Inquiry t o verify i nformation  is stored  in VistA.
  338   The Patien t Pay Amou nt is avai lable in t he ePharma cy testing  tool.
  339   RES Resubm it with Ed its on the  ECME User  screen sh ow the cor rect infor mation for  a seconda ry claim,  the second ary transa ction is p opulated w ith the co rrect prim ary claim  informatio n in the C OB fields  and the in formation  is stored  in VistA.  Use CRI Cl aim Respon se Inquiry  to verify  informati on is stor ed in Vist A.
  340  
  341   US170
  342   Comments e ntered fro m the Reje ct Informa tion scree n are disp layed in t he ECME Lo g of View  Prescripti on.
  343   All commen ts, includ ing those  made using  the COM   Add Commen ts action  displayed  in the ECM E Log of V iew Prescr iption, co ntinue to  display al l existing  details a ssociated  with comme nts (e.g.  date/time  stamp, Ref ill number , Initiato r of Activ ity, etc.) .  Please  see screen  shot incl uded in th e conversa tion for h ow the com ments shou ld appear  in the ECM E Log.
  344   The types  of comment s currentl y displaye d in the E CME Log co ntinue to  display as  they do n ow.
  345  
  346   US399
  347   Enhance th e RED Resu bmit Claim  w/Edits a ction on t he ECME Us er screen  to prompt  for NCPDP  fields tha t are not  on a payer  sheet and  that are  not stubs.
  348   Data in th e transact ion reflec ts the val ues of the  fields se lected by  the user.
  349   "^" will a llow the u ser to lea ve the act ion and re turn to th e main scr een.
  350   A comment  is stored  in the ECM E log with  wording f rom the fu nctional d esign.
  351   The activi ty log com ment can b e 100 char acters.
  352  
  353   US433
  354   Label beha vior match es the tab le for the  following  functiona lity:
  355   Medication  Profile,  Action ED  Edit
  356   Worklist,  Action ED  Edit
  357   Edit Presc riptions [ PSO RXEDIT ]
  358  
  359   Type
  360   Label Prin ted
  361   Released
  362   Prompt use r to print /reprint?
  363   CMOP, tran smitted
  364   Y
  365   Y
  366   N
  367   CMOP, tran smitted
  368   Y
  369   N
  370   N
  371   Window fil l
  372   Y
  373   N
  374   Y
  375   Window fil l
  376   Y
  377   Y
  378   N
  379   Window fil l
  380   N
  381   N
  382   Y
  383  
  384   US434
  385   Label beha vior match es the tab le for the  following  functiona lity:
  386   Medication  Profile,  Action RES  Resubmit
  387   Worklist,  Actions RE S Resubmit , OVR Subm it Overrid e Codes, C LA Submit  Clarif. Co de, PA Sub mit Prior  Auth., SMA  Submit Mu lt. Action
  388  
  389   Type
  390   Label Prin ted
  391   Released
  392   Prompt use r to print /reprint?
  393   CMOP, tran smitted
  394   Y
  395   Y
  396   N
  397   CMOP, tran smitted
  398   Y
  399   N
  400   N
  401   Window fil l
  402   Y
  403   N
  404   Y
  405   Window fil l
  406   Y
  407   Y
  408   N
  409   Window fil l
  410   N
  411   N
  412   Y
  413  
  414   US572
  415   The follow ing filter  questions  have been  added:  P rescriber,  Patient N ame, Bille d Amount.
  416   The follow ing filter  questions  allow sel ection of  one, many  or all:  C MOP/Mail/W indow, Bil ling Type  (Real time , etc.), R eject Code , Eligibil ity, Drug/ Drug Class , Prescrib er, Patien t.
  417   Prescriber  can be se lected by  name or NP I.
  418   Billed Amo unt can be  selected  for all am ounts or a  range.
  419   Excel capt ure instru ctions hav e been rew orded as p er the fun ctional de sign.
  420   The report  heading h as changed :
  421   Add Prescr iber
  422   Add Patien t
  423   Move trans action dat e to a new  line
  424   The follow ing labels  have a va lue of ALL  or SELECT ED: Insura nce, Rejec t Code, Dr ugs/Classe s, Prescri ber, Patie nt
  425   Eligibilit y has a va lue of ALL , VET, TRI  and/or CV A
  426   The report  column he adings hav e changed:
  427   Remove the  column he ading for  DRUG (only  the headi ng is remo ved, the d rug will s till displ ay)
  428   In place o f DRUG, ad d Prescrib er ID and  Name
  429   The report  display h as changed :
  430   Display th e Prescrib er ID and  Name under  the corre ct column  headings
  431   Remove the  Claim ID
  432   Display th e Drug nam e where th e Claim ID  previousl y displaye d
  433   Shorten la bels in th e Excel fo rmat headi ng, as not ed in the  chart in t he functio nal design
  434   Add labels  for Presc riber ID a nd Prescri ber
  435   Remove the  label for  Claim ID
  436   To avoid w rapping of  the Excel  format, l imit the d ata line l ength to 2 55 charact ers
  437   Remove par entheses a round the  Patient ID
  438   Truncate t he data fi elds as no ted in the  chart in  the functi onal desig n
  439   If needed,  truncate  the Reject  Explanati on to redu ce the lin e length t o 255 char acters.
  440  
  441   Non-billab le Status  Report all ows select ion of one , many or  all for th e Eligibil ity filter
  442  
  443   US575
  444   The reject  codes hav e been upd ated in fi le BPS NCP DP REJECT  CODES to r eflect the  codes tha t have bee n added an d renamed  per the fu nctional d esign.
  445   The clarif ication co des have b een update d in file  BPS NCPDP  CLARIFICAT ION CODES  to reflect  the codes  that have  been adde d and rena med per th e function al design.
  446   The result  of servic e codes ha ve been up dated in f ile BPS NC PDP RESULT  OF SERIVI CE CODE to  reflect t he codes t hat have b een rename d per the  functional  design.
  447   The other  payer amou nt qualifi ers have b een update d in file  BPS NCPDP  OTHER PAYE R AMT PAID  QUAL to r eflect the  codes tha t have bee n added an d renamed  per the fu nctional d esign.
  448   New and re named reje ct codes c an be
  449   selected i n the test ing tool
  450   received i n a claim  response a nd stored  in VistA w ith the cl aim respon se
  451   displayed  on the ECM E User scr een and th e Pharmaci sts’ Workl ist
  452   displayed  on the Rej ected Clai ms Report  and Closed  Claims Re port
  453   displayed  on the LOG  Print Cla im Log (EC ME User Sc reen)
  454   New and re named subm ission cla rification  codes can  be
  455   selected i n VistA fo r claim su bmission
  456   sent in a  claim requ est and st ored in Vi stA with t he claim r equest
  457   displayed  on the ECM E User scr een and th e Pharmaci sts’ Workl ist
  458   The new re named othe r payer am ount quali fiers can  be
  459   received i n a claim  response a nd stored  in VistA w ith the cl aim respon se
  460  
  461   US580
  462   The ECME U ser screen  display m atches the  user’s sa ved profil e or the u ser select ion from C V, even if  the store d fill typ e is somet hing other  than M or  W. 
  463   The follow ing report s display  correct in formation  even if th e stored f ill type i s somethin g other th an M or W:
  464   PAY    Pay able Claim s Report
  465   REJ    Rej ected Clai ms Report
  466   REV    Rev ersal Clai ms Report
  467   NYR    Cla ims Submit ted, Not Y et Release d
  468   REC    Rec ent Transa ctions
  469   DAY    Tot als by Dat e
  470   CLO    Clo sed Claims  Report
  471   NBS    Non -Billable  Status Rep ort
  472  
  473   US591
  474   Acceptance  Criteria  refers to  the follow ing prompt s in the C V Change V iew action  of the EC ME User Sc reen:
  475   Select  Ce rtain Phar macy (D)iv isions or  (A)LL: A//
  476   Select Cer tain Eligi bility Typ e or (A)ll : A//
  477   Display On e ECME (U) ser or (A) LL: A// 
  478   Display On e (P)atien t or (A)LL : A// 
  479   Display On e (R)x or  (A)LL: A//  
  480   Display (R )ejects or  (P)ayable s or (U)ns tranded or  (A)LL: A/ /
  481   Display (C )MOP or (M )ail or (W )indow or  (A)LL: A//
  482   Display (R )ealTime,  (B)ackbill s, (P)RO O ption, Re( S)ubmissio n or (A)LL : A//
  483   Display Sp ecific (R) eject Code  or (A)LL:  A// REJEC T CODE
  484   All prompt s allow mu ltiple sel ections, s ingle sele ction or A LL.
  485   The system  will filt er out dup licate res ponses.
  486   The system  will allo w individu al entries  and a sel ection of  ALL.
  487   Help text  is availab le.
  488  
  489   US594
  490   Action MP  Med Profil e are avai lable from  option Vi ew ePharma cy Rx.
  491   Select act ion MP Med  Profile a nd the dis played inf ormation m atched the  informati on display ed in acti on MP Medi cation Pro file from  the Reject  Informati on screen.
  492   When scrol ling throu gh all scr eens in op tion View  ePharmacy  Rx, the MP  Med Profi le informa tion is in  the right  order.
  493   The action s will not  display w ith the Me d Profile  action.
  494   MP Medicat ion Profil e is avail able to be  printed.
  495  
  496   US598
  497   New option  ePharmacy  Patient C omment is  on the ePh armacy Men u and requ ires secur ity key PS O EPHARMAC Y SITE MAN AGER.
  498   The Add Co mment acti on will al low the us er to ente r a new pa tient bill ing commen t.
  499   The Inacti vate or Ac tivate Com ment actio n will all ow the use r to inact ivate or a ctivate an  existing  patient bi lling comm ent. 
  500   The Commen t History  action wil l display  history fo r the comm ent, which  includes  additions,  activatio ns and ina ctivations .
  501   Comments a re display ed in reve rse chrono logical or der.
  502   The Reject  Informati on screen  displays t he new com ments in r everse chr onological  order in  a new sect ion called  “Comments  – Patient ” and the  original c omment sec tion is re named to “ Comments –  Reject”.
  503   The Reject  Informati on screen  action of  COM Add Co mments wil l allow th e user to  enter a re ject comme nt or a pa tient bill ing commen t.  
  504   Help text  is availab le when us ing the CO M Add Comm ents actio n
  505   Patient Co mments can not be edi ted or ina ctivated f rom the CO M action.
  506   The Reject  Notificat ion screen  displays  the patien t billing  comment un der the Ca rdholder I D.
  507   Patient Co mments def ault to ac tive when  entered fr om both th e option e Pharmacy P atient Com ment and t he COM Add  Comments  on the Rej ect Inform ation Scre en.
  508   The Patien t Comment  captures,  stores and  displays  the commen t, user, d ate and ti me.
  509   Only activ e Patient  Comments a re display ed on the  Reject Inf ormation S creens.
  510  
  511   US599
  512   ePharmacy  Site Param eters cont ains a pro mpt for Ig nore Thres hold in th e General  Parameters  section.
  513   The action  EA Edit A ll Paramet ers and EG  Edit Gene ral Parame ters inclu de the new  parameter .
  514   The Ignore  Threshold  is not re quired and  can be up date or de leted.
  515   Users can  enter a va lue of 0 a nd 9999999 .
  516   The Reject  Notificat ion Screen  and the R eject Info rmation Sc reen will  allow the  user to ig nore when  the thresh old has be en met or  exceeded b ut only if  the user  holds secu rity key E PHARMACY S ITE MANAGE R.
  517   The Reject  Notificat ion Screen  and the R eject Info rmation Sc reen both  display a  message wh en IGNORE  is chosen  and the gr oss amount  due equal s or excee ds the thr eshold.
  518  
  519   US1441
  520   The ECME D evelopers  Log displa ys the cla im status  at the tim e of label  printing.
  521   The ECME D evelopers  Log displa ys the men u option a nd action  (if availa ble) used  to print t he label.
  522   The ECME D evelopers  Log displa ys the ope n rejects  on the Thi rd Party R ejects Wor klist at t he time of  label pri nting.
  523  
  524   US1907
  525   A new prom pt is adde d allowing  the user  to specify  a Date Ra nge or Tim eframe
  526   Help text  is availab le explain ing the di fference b etween the  Date Rang e and Time frame
  527   An ‘Activi ty Date Ra nge’ promp t has been  added all owing the  user to en ter a date  range by  entering a n ‘Activit y Beginnin g Date’ an d an ‘Acti vity Endin g Date’.
  528   The timefr ame lookba ck restric tion of 99 9 days is  changed to  180 days.
  529   A rule has  been adde d to preve nt user fr om exceedi ng a 180-d ay date ra nge.
  530   A rule has  been adde d to preve nt user fr om enterin g an end d ate that p recedes th e beginnin g date.
  531   A warning  ‘Ending Da te precede s Beginnin g Date’ is  displayed  when the  end date p recedes th e beginnin g date
  532   A warning  ‘Date rang e exceeds  180 day li mit. Selec t an Endin g Date whi ch is no m ore than 1 80 days af ter the Be ginning Da te.’ if ra nge exceed s 180 days .
  533   Add functi onality:   If Activit y ‘Date Ra nge’ is se lected, th en show da te range i n report h eader.
  534  
  535   US3387
  536   When enter ing a new  order, a C HAMPVA pat ient’s pre scription  does not g enerate a  label prom pt if the  insurer is  asleep.
  537   When enter ing a new  order, a T RICARE pat ient’s pre scription  does not g enerate a  label prom pt if the  insurer is  asleep.
  538   When enter ing a new  order, a V eteran pat ient’s pre scription  DOES gener ate a labe l prompt i f the insu rer is asl eep which  is existin g behavior .
  539  
  540   US3481
  541   The defaul t value fo r the Pres criber fil ter questi on is “A”.
  542  
  543   Back-Out C riteria
  544   It may be  decided to  back out  this patch  if the pr oject is c anceled, t he request ed changes  implement ed by mult i-build BP S IB PSO B UNDLE 11.0  are no lo nger desir ed by VA O I&T and th e ePharmac y eBusines s team, or  the patch  produces  catastroph ic problem s.
  545   Back-Out R isks
  546   Since the  ePharmacy  software i s tightly  integrated  with exte rnal syste ms, any at tempt at a  back-out  should inc lude close  consultat ion with t he externa l trading  partners s uch as the  Financial  Services  Center (FS C) and the  Health Ca re Clearin g House (H CCH) to de termine ri sk.
  547   Authority  for Back-O ut
  548   The order  would come  from: rel ease coord inator (pr oduct supp ort), port folio dire ctor, and  health pro duct suppo rt. The or der should  be done i n consulta tion with  the develo pment team  and exter nal tradin g partners  such as F SC and the  HCCH to d etermine t he appropr iate cours e of actio n. ePharma cy is tigh tly integr ated with  these exte rnal partn ers and a  decision t o back-out  should no t be made  without th eir consul tation.
  549   Back-Out P rocedure
  550   Backing ou t enhancem ents to a  VistA appl ication is  often com plex. Norm ally, defe cts are re paired via  a follow- up patch.  The develo pment team  recommend s that sit es log a t icket if t here is a  nationally  released  patch to b e implemen ted. If no t, the sit e should c ontact the  Enterpris e Program  Management  Office (E PMO) team  directly f or specifi c solution s to their  unique pr oblems.
  551  
  552   Multi-buil d BPS IB P SO BUNDLE  11.0 conta ins the fo llowing bu ild compon ents:
  553   Routines
  554   File entri es in mult iple files
  555   Data Dicti onary Chan ges
  556   Protocols
  557   List Templ ates
  558   Menu Optio ns
  559  
  560   While the  VistA KIDS  installat ion proced ure allows  the insta ller to ba ck up the  modified r outines us ing the ‘B ackup a Tr ansport Gl obal’ acti on, the ba ck-out pro cedure for  global, d ata dictio nary and o ther VistA  component s is more  complex an d requires  issuance  of a follo w-up patch  to ensure  all compo nents are  properly r emoved and /or restor ed. All so ftware com ponents (r outines an d other it ems) must  be restore d to their  previous  state at t he same ti me and in  conjunctio n with the  restorati on of the  data.
  561  
  562   Please con tact the E PMO team f or assista nce since  this insta lled patch  contains  components  in additi on to rout ines.
  563   Back-out V erificatio n Procedur e
  564   Successful  back-out  is confirm ed by veri fication t hat the ba ck-out pat ch was suc cessfully  installed.
  565   Rollback P rocedure
  566   Rollback p ertains to  data. The  data chan ges in thi s patch ar e specific  to the op erational  software a nd platfor m settings . These da ta changes  are cover ed in the  Back-out p rocedures  detailed e lsewhere i n this doc ument.
  567   Rollback C onsiderati ons
  568   Not applic able.
  569   Rollback C riteria
  570   Not applic able.
  571   Rollback R isks
  572   Not applic able.
  573   Authority  for Rollba ck
  574   Not applic able.
  575   Rollback P rocedure
  576   Not applic able.
  577   Rollback V erificatio n Procedur e
  578   Not applic able.
  579  
  580  
  581   Template R evision Hi story
  582   Date
  583   Version
  584   Descriptio n
  585   Author
  586   March 2016
  587   2.2
  588   Changed th e title fr om Install ation, Bac k-Out, and  Rollback  Guide to D eployment  and Instal lation Gui de, with t he underst anding tha t Back-Out  and Rollb ack belong  with Inst allation. 
  589   VIP Team
  590   February 2 016
  591   2.1
  592   Changed ti tle from I nstallatio n, Back-Ou t, and Rol lback Plan  to Instal lation, Ba ck-Out, an d Rollback  Guide as  recommende d by OI&T  Documentat ion Standa rds Commit tee
  593   OI&T Docum entation S tandards C ommittee
  594   December 2 015
  595   2.0
  596   The OI&T D ocumentati on Standar ds Committ ee merged  the existi ng “Instal lation, Ba ck-Out, Ro llback Pla n” templat e with the  content r equirement s in the O I&T End-us er Documen tation Sta ndards for  a more co mprehensiv e Installa tion Plan.
  597   OI&T Docum entation S tandards C ommittee
  598   February 2 015
  599   1.0
  600   Initial Dr aft
  601   Lifecycle  and Releas e Manageme nt