3. EPMO Open Source Coordination Office Redaction File Detail Report

Produced by Araxis Merge on 8/5/2017 9:36:44 AM Eastern Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.

3.1 Files compared

# Location File Last Modified
1 BPS_1.0_21_Build_8.zip bps_1_p21_ig.docx Fri Apr 28 17:39:42 2017 UTC
2 BPS_1.0_21_Build_8.zip bps_1_p21_ig.docx Sat Aug 5 13:19:59 2017 UTC

3.2 Comparison summary

Description Between
Files 1 and 2
Text Blocks Lines
Unchanged 1 738
Changed 0 0
Inserted 0 0
Removed 0 0

3.3 Comparison options

Whitespace
Character case Differences in character case are significant
Line endings Differences in line endings (CR and LF characters) are ignored
CR/LF characters Not shown in the comparison detail

3.4 Active regular expressions

No regular expressions were active.

3.5 Comparison detail

  1   Medical Ca re Collect ion Fund ( MCCF) Elec tronic Dat a Intercha nge (EDI)  Transactio n Applicat ions Suite  (TAS) ePh armacy Bui ld 1
  2   E Claims M anagement  Engine BPS *1.0*21
  3   Deployment , Installa tion, Back -Out, and  Rollback G uide
  4   Version 1. 0
  5  
  6  
  7   April 2017
  8   Department  of Vetera ns Affairs
  9   Office of  Informatio n and Tech nology (OI &T)
  10  
  11  
  12   Revision H istory
  13   Date
  14   Version
  15   Descriptio n
  16   Author
  17   April 2017
  18   1.0
  19   Initial Ve rsion
  20   Christine  Bullis, Ma rk Dawson
  21  
  22   Artifact R ationale
  23   This docum ent descri bes the De ployment,  Installati on, Back-o ut, and Ro llback Pla n for new  products g oing into  the VA Ent erprise. T he plan in cludes inf ormation a bout syste m support,  issue tra cking, esc alation pr ocesses, a nd roles a nd respons ibilities  involved i n all thos e activiti es. Its pu rpose is t o provide  clients, s takeholder s, and sup port perso nnel with  a smooth t ransition  to the new  product o r software , and shou ld be stru ctured app ropriately , to refle ct particu lars of th ese proced ures at a  single or  at multipl e location s.
  24   Per the Ve teran-focu sed Integr ated Proce ss (VIP) G uide, the  Deployment , Installa tion, Back -out, and  Rollback P lan is req uired to b e complete d prior to  Critical  Decision P oint #2 (C D #2), wit h the expe ctation th at it will  be update d througho ut the lif ecycle of  the projec t for each  build, as  needed.
  25  
  26  
  27  
  28  
  29   Table of C ontents
  30   1Introduct ion1
  31   1.1Purpose 1
  32   1.2Depende ncies1
  33   1.3Constra ints1
  34   2Roles and  Responsib ilities1
  35   3Deploymen t2
  36   3.1Timelin e2
  37   3.2Site Re adiness As sessment2
  38   3.2.1Deplo yment Topo logy (Targ eted Archi tecture)2
  39   3.2.2Site  Informatio n (Locatio ns, Deploy ment Recip ients)2
  40   3.2.3Site  Preparatio n3
  41   3.3Resourc es3
  42   3.3.1Facil ity Specif ics3
  43   3.3.2Hardw are3
  44   3.3.3Softw are3
  45   3.3.4Commu nications4
  46   3.3.4.1Dep loyment/In stallation /Back-Out  Checklist4
  47   4Installat ion4
  48   4.1Pre-ins tallation  and System  Requireme nts4
  49   4.2Platfor m Installa tion and P reparation 5
  50   4.3Downloa d and Extr act Files5
  51   4.4Databas e Creation 5
  52   4.5Install ation Scri pts5
  53   4.6Cron Sc ripts5
  54   4.7Access  Requiremen ts and Ski lls Needed  for the I nstallatio n5
  55   4.8Install ation Proc edure5
  56   4.9Install ation Veri fication P rocedure5
  57   4.10System  Configura tion5
  58   4.11Databa se Tuning5
  59   5Back-Out  Procedure6
  60   5.1Back-Ou t Strategy 6
  61   5.1.1Mirro r Testing  or Site Pr oduction T esting6
  62   5.1.2After  National  Release bu t During t he Designa ted Suppor t Period6
  63   5.1.3After  National  Release an d Warranty  Period6
  64   5.2Back-Ou t Consider ations6
  65   5.2.1Load  Testing6
  66   5.2.2User  Acceptance  Testing6
  67   5.3Back-Ou t Criteria 8
  68   5.4Back-Ou t Risks8
  69   5.5Authori ty for Bac k-Out8
  70   5.6Back-Ou t Procedur e8
  71   5.7Back-ou t Verifica tion Proce dure9
  72   6Rollback  Procedure9
  73   6.1Rollbac k Consider ations9
  74   6.2Rollbac k Criteria 9
  75   6.3Rollbac k Risks9
  76   6.4Authori ty for Rol lback9
  77   6.5Rollbac k Procedur e9
  78   6.6Rollbac k Verifica tion Proce dure9
  79  
  80   Table of T ables
  81   Table 1: D eployment,  Installat ion, Back- out, and R ollback Ro les and Re sponsibili ties1
  82   Table 2: S ite Prepar ation3
  83   Table 3: F acility-Sp ecific Fea tures3
  84   Table 4: H ardware Sp ecificatio ns3
  85   Table 5: S oftware Sp ecificatio ns4
  86   Table 6: D eployment/ Installati on/Back-Ou t Checklis t4
  87  
  88  
  89  
  90   Introducti on
  91   This docum ent descri bes how to  deploy an d install  the BPS*1. 0*21 and h ow to back -out the p roduct and  rollback  to a previ ous versio n or data  set.
  92   Purpose
  93   The purpos e of this  plan is to  provide a  single, c ommon docu ment that  describes  how, when,  where, an d to whom  the BPS*1. 0*21 will  be deploye d and inst alled, as  well as ho w it is to  be backed  out and r olled back , if neces sary. The  plan ident ifies reso urces, com munication s plan, an d rollout  schedule.  Specific i nstruction s for inst allation,  back-out,  and rollba ck are inc luded in t his docume nt.
  94   Dependenci es
  95   BPS*1.0*20  must be i nstalled b efore BPS* 1.0*21.
  96   Constraint s
  97   This patch  is intend ed for a f ully patch ed VistA s ystem.
  98   Roles and  Responsibi lities
  99   Table 1: D eployment,  Installat ion, Back- out, and R ollback Ro les and Re sponsibili ties
  100   ID
  101   Team
  102   Phase / Ro le
  103   Tasks
  104   Project Ph ase (See S chedule)
  105   1
  106   VA OI&T, V A OI&T Hea lth Produc t Support  & PMO (Lei dos)
  107   Deployment
  108   Plan and s chedule de ployment ( including  orchestrat ion with v endors)
  109   Planning
  110   2
  111   Local VAMC  and CPAC  processes
  112  
  113  
  114   Deployment
  115   Determine  and docume nt the rol es and res ponsibilit ies of tho se involve d in the d eployment.
  116   Planning
  117   3
  118   Field Test ing (Initi al Operati ng Capabil ity - IOC) , Health P roduct Sup port Testi ng & VIP R elease Age nt Approva
  119   Deployment
  120   Test for o perational  readiness  
  121   Testing
  122   4
  123   Health pro duct Suppo rt and Fie ld Operati ons
  124   Deployment
  125   Execute de ployment
  126   Deployment
  127   5
  128   Individual  Veterans  Administra tion Medic al Centers  (VAMCs)
  129   Installati on
  130   Plan and s chedule in stallation  
  131   Deployment
  132   6
  133    VIP Relea se Agent
  134   Installati on
  135   Ensure aut hority to  operate an d that cer tificate a uthority s ecurity do cumentatio n is in pl ace
  136   Deployment
  137   7
  138   N/A for th is patch a s we are u sing only  the existi ng VistA s ystem
  139   Installati on
  140   Validate t hrough fac ility POC  to ensure  that IT eq uipment ha s been acc epted usin g asset in ventory pr ocesses
  141  
  142   8
  143   VA’s eBusi ness team
  144   Installati ons
  145   Coordinate  training 
  146   Deployment
  147   9
  148   VIP releas e Agent, H ealth Prod uct Suppor t & the de velopment  team
  149   Back-out
  150   Confirm av ailability  of back-o ut instruc tions and  back-out s trategy (w hat are th e criteria  that trig ger a back -out) 
  151   Deployment
  152   10
  153   No changes  to curren t process  – we are u sing the e xisting Vi stA system
  154   Post Deplo yment
  155   Hardware,  Software a nd System  Support
  156   Warranty
  157   Deployment
  158   The deploy ment is pl anned as a  national  rollout.
  159   This secti on provide s the sche dule and m ilestones  for the de ployment.
  160   Timeline
  161   The durati on of depl oyment and  installat ion is 30  days, as d epicted in  the maste r deployme nt schedul e.
  162   Site Readi ness Asses sment
  163   This secti on discuss es the loc ations tha t will rec eive the B PS*1.0*21  deployment .
  164   Deployment  Topology  (Targeted  Architectu re)
  165   This patch  BPS*1.0*2 1 is to be  nationall y released  to all VA MCs.
  166   Site Infor mation (Lo cations, D eployment  Recipients )
  167   The test s ites for I OC testing  are: TBD
  168   These site s will not  be define d here unt il the sit es have ea ch signed  a Memorand um of Unde rstanding  (MOU) and  testing is  complete  as sometim es a site  has to sto p testing  prior to t he end of  IOC.
  169  
  170   Upon natio nal releas e all VAMC s are expe cted to in stall this  patch pri or to or o n the comp liance dat e.
  171   Site Prepa ration
  172   The follow ing table  describes  preparatio n required  by the si te prior t o deployme nt.
  173   Table 2: S ite Prepar ation
  174   Site/Other
  175   Problem/Ch ange Neede d
  176   Features t o Adapt/Mo dify to Ne w Product
  177   Actions/St eps
  178   Owner
  179   N/A
  180   N/A
  181   N/A
  182   N/A
  183   N/A
  184   Resources
  185   Facility S pecifics
  186   The follow ing table  lists faci lity-speci fic featur es require d for depl oyment.
  187   Table 3: F acility-Sp ecific Fea tures
  188   Site
  189   Space/Room
  190   Features N eeded
  191   Other
  192   N/A
  193   N/A
  194   N/A
  195   N/A
  196   Hardware
  197   The follow ing table  describes  hardware s pecificati ons requir ed at each  site prio r to deplo yment.
  198   Table 4: H ardware Sp ecificatio ns
  199   Required H ardware
  200   Model
  201   Version
  202   Configurat ion
  203   Manufactur er
  204   Other
  205   Existing V istA syste m
  206   N/A
  207   N/A
  208   N/A
  209   N/A
  210   N/A
  211   Please see  the Roles  and Respo nsibilitie s table in  Section 2  for detai ls about w ho is resp onsible fo r preparin g the site  to meet t hese hardw are specif ications.
  212   Software
  213   The follow ing table  describes  software s pecificati ons requir ed at each  site prio r to deplo yment.
  214   Table 5: S oftware Sp ecificatio ns
  215   Required S oftware
  216   Make
  217   Version
  218   Configurat ion
  219   Manufactur er
  220   Other
  221   Fully patc hed E Clai ms Managem ent Engine  package w ithin Vist A
  222   N/A
  223   1.0
  224   N/A
  225   N/A
  226   N/A
  227   BPS*1.0*20
  228   N/A
  229   Nationally  released  version
  230   N/A
  231   N/A
  232   N/A
  233   Please see  the Roles  and Respo nsibilitie s table in  Section 2  above for  details a bout who i s responsi ble for pr eparing th e site to  meet these  software  specificat ions.
  234   Communicat ions
  235   The sites  that are p articipati ng in fiel d testing  (IOC) will  use the “ Patch Trac king” mess age in Out look to co mmunicate  with the e Pharmacy e Business t eam, the d evelopers,  and produ ct support  personnel .
  236   Deployment /Installat ion/Back-O ut Checkli st
  237   The Releas e Manageme nt team wi ll deploy  the patch  BPS*1.0*21 , which is  tracked n ationally  for all VA MCs in the  NPM in Fo rum. Forum  automatic ally track s the patc hes as the y are inst alled in t he differe nt VAMC pr oduction s ystems. On e can run  a report i n Forum to  identify  when and b y whom the  patch was  installed  in the Vi stA produc tion at ea ch site. A  report ca n also be  run to ide ntify whic h sites ha ve not cur rently ins talled the  patch in  their Vist A producti on system.
  238  
  239   Therefore,  this info rmation do es not nee d to be ma nually tra cked in th e chart be low.
  240   Table 6: D eployment/ Installati on/Back-Ou t Checklis t
  241   Activity
  242   Day
  243   Time
  244   Individual  who compl eted task
  245   Deploy
  246   N/A
  247   N/A
  248   N/A
  249   Install
  250   N/A
  251   N/A
  252   N/A
  253  
  254   Installati on
  255   Pre-instal lation and  System Re quirements
  256   BPS*1.0*21 , a patch  to the exi sting Vist A E Claims  Managemen t Engine ( ECME) 1.0  package, i s installa ble on a f ully patch ed M(UMPS)  VistA sys tem and op erates on  the top of  the VistA  environme nt provide d by the V istA infra structure  packages.  The latter  provides  utilities  which comm unicate wi th the und erlying op erating sy stem and h ardware, t hereby pro viding ECM E independ ence from  variations  in hardwa re and ope rating sys tem.
  257   Platform I nstallatio n and Prep aration
  258   Refer to t he BPS*1.0 *21 docume ntation on  the Natio nal Patch  Module (NP M) in Foru m for the  detailed i nstallatio n instruct ions. Thes e instruct ions would  include a ny pre-ins tallation  steps if a pplicable.
  259   Download a nd Extract  Files
  260   Refer to t he BPS*1.0 *21 docume ntation on  the NPM t o find rel ated docum entation t hat can be  downloade d. BPS*1.0 *21 will b e transmit ted via a  PackMan me ssage and  can be pul led from t he NPM. It  is not a  host file,  and there fore does  not need t o be downl oaded sepa rately.
  261   Database C reation
  262   BPS*1.0*21  modifies  the VistA  database.  All change s can be f ound on th e NPM docu mentation  for this p atch. 
  263   Installati on Scripts
  264   No install ation scri pts are ne eded for B PS*1.0*21  installati on.
  265   Cron Scrip ts
  266   No Cron sc ripts are  needed for  BPS*1.0*2 1 installa tion.
  267   Access Req uirements  and Skills  Needed fo r the Inst allation
  268   The follow ing staff  will need  access to  the PackMa n message  containing  the BPS*1 .0*21 patc h or to Fo rum’s NPM  for downlo ading the  nationally  released  BPS*1.0*21  patch. Th e software  is to be  installed  by each si te’s or re gion’s des ignated VA  OI&T IT O PERATIONS  SERVICE, E nterprise  Service Li nes, Vista  Applicati ons Divisi on.
  269   Installati on Procedu re
  270   Refer to t he BPS*1.0 *21 docume ntation on  the NPM f or detaile d installa tion instr uctions.
  271   Installati on Verific ation Proc edure
  272   Refer to t he BPS*1.0 *21 docume ntation on  the NPM f or detaile d installa tion instr uctions. T hese instr uctions in clude any  post insta llation st eps if app licable.
  273   System Con figuration
  274   No system  configurat ion change s are requ ired for t his patch.
  275   Database T uning
  276   No reconfi guration o f the Vist A database , memory a llocations  or other  resources  is necessa ry.
  277   Back-Out P rocedure
  278   Back-Out p ertains to  a return  to the las t known go od operati onal state  of the so ftware and  appropria te platfor m settings .
  279   Back-Out S trategy
  280   A decision  to back o ut could b e made dur ing site M irror Test ing, Site  Production  Testing,  or after N ational Re lease to t he field ( VAMCs). Th e best str ategy deci sion is de pendent on  the stage  of testin g during w hich the d ecision is  made.
  281   Mirror Tes ting or Si te Product ion Testin g
  282   If a decis ion to bac k out is m ade during  Mirror Te sting or S ite Produc tion Testi ng, a new  version of  the patch  can be us ed to rest ore the bu ild compon ents to th eir pre-pa tch condit ion.
  283   After Nati onal Relea se but Dur ing the De signated S upport Per iod
  284   If a decis ion to bac k out is m ade after  national r elease and  within th e designat ed support  period, a  new patch  will be e ntered int o the Nati onal Patch  Module in  Forum and  will go t hrough all  the neces sary miles tone revie ws, etc. a s a patch  for a patc h. This pa tch could  be defined  as an eme rgency pat ch, and it  could be  used to ad dress spec ific issue s pertaini ng to the  original p atch or be  used to r estore the  build com ponents to  their ori ginal pre- patch cond ition.
  285   After Nati onal Relea se and War ranty Peri od
  286   After the  support pe riod, the  VistA Main tenance Pr ogram woul d produce  the new pa tch, eithe r to corre ct the def ective com ponents or  restore t he build c omponents  to their o riginal pr e-patch co ndition.
  287   Back-Out C onsiderati ons
  288   Changes im plemented  with BPS*1 .0*21 can  be backed  out in the ir entiret y on an en hancement- by-enhance ment basis . Either c ould be ac complished  via a new  version o f BPS*1.0* 21 if befo re nationa l release  or a new p atch if af ter nation al release .
  289   Load Testi ng
  290   N/A. The b ack-out pr ocess woul d be execu ted at nor mal, rathe r than rai sed job pr iority, an d is expec ted to hav e no signi ficant eff ect on tot al system  performanc e. Subsequ ent to the  reversion , the perf ormance de mands on t he system  would be u nchanged.
  291   User Accep tance Test ing
  292   Concerning  the Defau lt item nu mber to 1. 1 when onl y one reje ct is list ed on the  ECME User  Screen use r story, t he followi ng accepta nce criter ia should  be anticip ated:
  293   When only  one reject  is listed  on the EC ME User Sc reen, the  item numbe r value of  1.1 is de faulted at  the Selec t Item pro mpt for al l ECME Use r Screen a ctions lis ted in the  user stor y.
  294  
  295   Concerning  the Defau lt item nu mber 1 whe n only one  patient i s listed o n the ECME  User Scre en user st ory, the f ollowing a cceptance  criteria s hould be a nticipated :
  296   When only  one patien t is liste d on the E CME User S creen, the  item numb er value o f 1 is def aulted at  the Select  Item prom pt for all  ECME User  Screen ac tions list ed in the  user story .
  297  
  298   Concerning  the NCPDP  Field Def inition –  Provider N ame user s tory, the  following  acceptance  criteria  should be  anticipate d:
  299   Confirm th at the BPS  NCPDP FIE LD DEFS fi le include s the Prov ider First  Name and  Provider L ast Name f ields.
  300  
  301   Concerning  the NCPDP  Field Def inition –  Product ID  user stor y, the fol lowing acc eptance cr iteria sho uld be ant icipated:
  302   Confirm th at the BPS  NCPDP FIE LD DEFS fi le include s the Orig inal Manuf acturer Pr oduct ID a nd the Ori ginal Manu facturer P roduct ID  Qualifier  fields.
  303  
  304   Concerning  the NCPDP  Field Def inition –  Edits user  story, th e followin g acceptan ce criteri a should b e anticipa ted:
  305   Confirm th at the BPS  NCPDP FIE LD DEFS fi le reflect s the NCPD P name for  the field s listed i n the user  story.
  306  
  307   Concerning  the NCPDP  ECL Updat es user st ory, the f ollowing a cceptance  criteria s hould be a nticipated :
  308   VistA ECME  input fie lds accept  the corre ct ECL val ues.
  309   VistA ECME  stores pe rmanently  ePharmacy  claim data .
  310   All ECME s creens dis play the E CL values  published  after E7 O ctober 201 5.
  311   All ECME r eports pri nt the cor rect ECL v alues tran smitted on  the ePhar macy claim s, as appl icable.
  312   VistA ECME  sends ePh armacy cla im data us ing the NC PDP ECL va lues publi shed on/af ter Januar y 2016.
  313   VistA ECME  receives  an acknowl edgement t hat the cl aim has be en process ed without  any rejec ts related  to the up dated ECL  updates.
  314   VistA ECME  continues  to displa y all reje cts to the  user.
  315   The new re ject codes  are displ ayed on th e ECME Use r Screen c orrectly.
  316   Descriptio ns for the  new and/o r updated  reject cod es display  on the EC ME User Sc reen corre ctly.
  317  
  318   Concerning  the Preve nt OPECC E ntering Su bmission C larificati on user st ory, when  the OPECC  performs t he Resubmi t w/Edits  action, re strict the  ability t o edit the  Submissio n Clarific ation Code  if any of  the below  criteria  exist.
  319   If a presc ription ha s an unres olved Reje ct code 79  (Refill T oo Soon) o r Reject c ode 88 DUR  (Drug Uti lization R eview).
  320   If a presc ription ha s a resolv ed Reject  code 79 (R efill Too  Soon) or R eject code  88 DUR (D rug Utiliz ation Revi ew) for th e most rec ent transa ction.
  321   If a presc ription ha s a pendin g reject o n the phar macist’s w orklist (N ote: Rejec t Resoluti on Require d rejects  and Transf er Rejects  are set u p locally  and may va ry on the  worklist).
  322  
  323   The follow ing accept ance crite ria should  be antici pated:
  324   If prescri ption fall s into one  of the th ree criter ia, then t he system  should dis play the m essage and  not allow  OPECC to  update the  Submissio n Clarific ation Code  using the  RED Resub mit w/Edit s action.
  325   Assure tha t the OPEC C can edit  the Submi ssion Clar ification  Code using  the RED R esubmit w/ Edits acti on for pre scriptions  when the  prescripti on does no t meet the  criteria.
  326   Assure tha t the Phar macists ca n update t he Submiss ion Clarif ication Co de at all  times (the  Pharmacis ts’ abilit y to enter /edit the  codes shou ld not be  changed).
  327   Assure the  OPECC can not edit t he Submiss ion Clarif ication Co de when us ing the RE D Resubmit  w/Edits a ction and  there are  multiple r eject code s, one of  which fits  this crit eria and o ne does no t fit the  criteria.
  328   The OPECC  should be  able to ed it other e xisting fi elds withi n the RED  Resubmit e /Edits act ions if th e prescrip tion falls  into the  three crit eria.
  329   Assure the  OPECC can  edit the  Submission  Clarifica tion Code  when using  the RED R esubmit w/ Edits acti on and the re are mul tiple reje ct codes,  none of wh ich meet t he criteri a.
  330  
  331   Concerning  the Chang e ECME scr een for co mments on  prior tran saction us er story,  the follow ing accept ance crite ria should  be antici pated:
  332   When a cla im is resu bmitted, t he main sc reen of th e ECME Use r Screen w ill automa tically di splay a me ssage of “ Prior comm ents suppr essed-use  CMT action  for all c omments” i nstead of  displaying  the comme nt for the  previous  transactio n.
  333   The main p age of the  ECME User  Screen wi ll display  the most  current co mment for  the most r ecent tran saction.
  334   All commen ts will co ntinue to  be availab le on othe r screens  (no change ).
  335   If no comm ents have  been enter ed (prior  or current ) the mess age “Prior  comments  suppressed -use CMT a ction for  all commen ts” does n ot display .
  336  
  337   Back-Out C riteria
  338   It may be  decided to  back out  this patch  if the pr oject is c anceled, t he request ed changes  implement ed by BPS* 1.0*21 are  no longer  desired b y VA OI&T  and the eP harmacy eB usiness te am, or the  patch pro duces cata strophic p roblems.
  339   Back-Out R isks
  340   Since the  ePharmacy  software i s tightly  integrated  with exte rnal syste ms, any at tempt at a  back-out  should inc lude close  consultat ion with t he externa l trading  partners s uch as the  Financial  Services  Center (FS C) and the  Health Ca re Clearin g House (H CCH) to de termine ri sk.
  341   Authority  for Back-O ut
  342   The order  would come  from: rel ease coord inator (pr oduct supp ort), port folio dire ctor, and  health pro duct suppo rt. The or der should  be done i n consulta tion with  the develo pment team  and exter nal tradin g partners  such as F SC and the  HCCH to d etermine t he appropr iate cours e of actio n. ePharma cy is tigh tly integr ated with  these exte rnal partn ers and a  decision t o back-out  should no t be made  without th eir consul tation.
  343   Back-Out P rocedure
  344   Backing ou t enhancem ents to a  VistA appl ication is  often com plex. Norm ally, defe cts are re paired via  a follow- up patch.  The develo pment team  recommend s that sit es log a t icket if i t is a nat ionally re leased pat ch. If not , the site  should co ntact the  Enterprise  Program M anagement  Office (EP MO) team d irectly fo r specific  solutions  to their  unique pro blems.
  345  
  346   The BPS*1. 0*21 patch  contains  the follow ing build  components :
  347   Routines
  348   File entri es in the  files BPS  NCPDP FIEL D DEFS (#9 002313.91) , BPS NCPD P REJECT C ODES (#900 2313.93),  and BPS CL ARIFICATIO N CODES (# 9002313.25 )
  349   Data Dicti onary Chan ges
  350  
  351   While the  VistA KIDS  installat ion proced ure allows  the insta ller to ba ck up the  modified r outines us ing the ‘B ackup a Tr ansport Gl obal’ acti on, the ba ck-out pro cedure for  global, d ata dictio nary and o ther VistA  component s is more  complex an d requires  issuance  of a follo w-up patch  to ensure  all compo nents are  properly r emoved and /or restor ed. All so ftware com ponents (r outines an d other it ems) must  be restore d to their  previous  state at t he same ti me and in  conjunctio n with the  restorati on of the  data.
  352  
  353   Please con tact the E PMO team f or assista nce since  this insta lled patch  contains  components  in additi on to rout ines.
  354   Back-out V erificatio n Procedur e
  355   Successful  back-out  is confirm ed by veri fication t hat the ba ck-out pat ch was suc cessfully  installed.
  356   Rollback P rocedure
  357   Rollback p ertains to  data. The  only data  changes i n this pat ch are spe cific to t he operati onal softw are and pl atform set tings. The se data ch anges are  covered in  the Back- out proced ures detai led elsewh ere in thi s document .
  358   Rollback C onsiderati ons
  359   Not applic able.
  360   Rollback C riteria
  361   Not applic able.
  362   Rollback R isks
  363   Not applic able.
  364   Authority  for Rollba ck
  365   Not applic able.
  366   Rollback P rocedure
  367   Not applic able.
  368   Rollback V erificatio n Procedur e
  369   Not applic able.