3. EPMO Open Source Coordination Office Redaction File Detail Report

Produced by Araxis Merge on 3/21/2017 9:01:46 AM Central Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.

3.1 Files compared

# Location File Last Modified
1 MCCF.zip\docs VIP_Deployment_Installation_Roll Back_Back-Out_Guide_ePayment PRCA_4_5_317 v1.docx Mon Jan 30 18:06:50 2017 UTC
2 MCCF.zip\docs VIP_Deployment_Installation_Roll Back_Back-Out_Guide_ePayment PRCA_4_5_317 v1.docx Tue Mar 21 13:55:04 2017 UTC

3.2 Comparison summary

Description Between
Files 1 and 2
Text Blocks Lines
Unchanged 1 720
Changed 0 0
Inserted 0 0
Removed 0 0

3.3 Comparison options

Whitespace
Character case Differences in character case are significant
Line endings Differences in line endings (CR and LF characters) are ignored
CR/LF characters Not shown in the comparison detail

3.4 Active regular expressions

No regular expressions were active.

3.5 Comparison detail

  1   Medical Ca re Collect ion Fund ( MCCF) Elec tronic Dat a Intercha nge (EDI)  Transactio n Applicat ions Suite  (TAS) Pha se 1
  2   ePayments  PRCA*4.5*3 17
  3   Version 1. 0
  4   Deployment , Installa tion, Back -Out, and  Rollback G uide
  5  
  6  
  7   January 20 17
  8   Department  of Vetera ns Affairs
  9   Office of  Informatio n and Tech nology (OI &T)
  10  
  11  
  12   Revision H istory
  13   Date
  14   Version
  15   Descriptio n
  16   Author
  17   January 20 17
  18   1.0
  19   Initial Ve rsion
  20   Darlene Wh ite
  21  
  22  
  23  
  24  
  25  
  26   Artifact R ationale 
  27   This docum ent descri bes the De ployment,  Installati on, Back-o ut, and Ro llback Pla n for new  products g oing into  the VA Ent erprise. T he plan in cludes inf ormation a bout syste m support,  issue tra cking, esc alation pr ocesses, a nd roles a nd respons ibilities  involved i n all thos e activiti es. Its pu rpose is t o provide  clients, s takeholder s, and sup port perso nnel with  a smooth t ransition  to the new  product o r software , and shou ld be stru ctured app ropriately , to refle ct particu lars of th ese proced ures at a  single or  at multipl e location s.
  28   Per the Ve teran-focu sed Integr ated Proce ss (VIP) G uide, the  Deployment , Installa tion, Back -out, and  Rollback P lan is req uired to b e complete d  prior t o Critical  Decision  Point #2 ( CD #2), wi th the exp ectation t hat it wil l be updat ed through out the li fecycle of  the proje ct for eac h build, a s needed. 
  29  
  30  
  31  
  32  
  33   Table of C ontents
  34   1Introduct ion1
  35   1.1Purpose 1
  36   1.2Depende ncies1
  37   1.3Constra ints1
  38   2Roles and  Responsib ilities1
  39   3Deploymen t2
  40   3.1Timelin e2
  41   3.2Site Re adiness As sessment2
  42   3.2.1Deplo yment Topo logy (Targ eted Archi tecture)2
  43   3.2.2Site  Informatio n (Locatio ns, Deploy ment Recip ients)2
  44   3.2.3Site  Preparatio n3
  45   3.3Resourc es3
  46   3.3.1Facil ity Specif ics3
  47   3.3.2Hardw are3
  48   3.3.3Softw are3
  49   3.3.4Commu nications4
  50   3.3.4.1Dep loyment/In stallation /Back-Out  Checklist4
  51   4Installat ion4
  52   4.1Pre-ins tallation  and System  Requireme nts4
  53   4.2Platfor m Installa tion and P reparation 5
  54   4.3Downloa d and Extr act Files5
  55   4.4Databas e Creation 5
  56   4.5Install ation Scri pts5
  57   4.6Cron Sc ripts5
  58   4.7Access  Requiremen ts and Ski lls Needed  for the I nstallatio n5
  59   4.8Install ation Proc edure5
  60   4.9Install ation Veri fication P rocedure5
  61   4.10System  Configura tion5
  62   4.11Databa se Tuning6
  63   5Back-Out  Procedure6
  64   5.1Back-Ou t Strategy 6
  65   5.2Back-Ou t Consider ations6
  66   5.2.1Load  Testing6
  67   5.2.2User  Acceptance  Testing6
  68   5.3Back-Ou t Criteria 7
  69   5.4Back-Ou t Risks7
  70   5.5Authori ty for Bac k-Out7
  71   5.6Back-Ou t Procedur e7
  72   5.7Back-ou t Verifica tion Proce dure8
  73   6Rollback  Procedure8
  74   6.1Rollbac k Consider ations8
  75   6.2Rollbac k Criteria 8
  76   6.3Rollbac k Risks8
  77   6.4Authori ty for Rol lback8
  78   6.5Rollbac k Procedur e9
  79   6.6Rollbac k Verifica tion Proce dure9
  80  
  81   Introducti on
  82   This docum ent descri bes how to  deploy an d install  the PRCA*4 .5*317 as  well as ho w to back- out the pr oduct and  rollback t o a previo us version  or data s et.
  83   Purpose
  84   The purpos e of this  plan is to  provide a  single, c ommon docu ment that  describes  how, when,  where, an d to whom  the PRCA*4 .5*317 wil l be deplo yed and in stalled, a s well as  how it is  to be back ed out and  rolled ba ck, if nec essary. Th e plan als o identifi es resourc es, commun ications p lan, and r ollout sch edule. Spe cific inst ructions f or install ation, bac k-out, and  rollback  are includ ed in this  document.   
  85   Dependenci es
  86   PRCA*4.5*3 04 must be  installed  before PR CA*4.5*317 .
  87   Constraint s
  88   This patch  is intend ed for a f ully patch ed VistA s ystem. 
  89   Roles and  Responsibi lities
  90   Table 1: D eployment,  Installat ion, Back- out, and R ollback Ro les and Re sponsibili ties
  91   ID
  92   Team
  93   Phase / Ro le
  94   Tasks
  95   Project Ph ase (See S chedule)
  96   1
  97   VA OI&T, V A OI&T Hea lth Produc t Support   & PMO (Le idos)
  98   Deployment
  99   Plan and s chedule de ployment ( including  orchestrat ion with v endors)
  100   Planning
  101   2
  102   Local VAMC  and CPAC  processes
  103  
  104  
  105   Deployment
  106   Determine  and docume nt the rol es and res ponsibilit ies of tho se involve d in the d eployment.
  107   Planning
  108   3
  109   Field Test ing (Initi al Operati ng Capabil ity - IOC) , Health P roduct Sup port Testi ng & VIP R elease Age nt Approva
  110   Deployment
  111   Test for o perational  readiness  
  112   Testing
  113   4
  114   Health pro duct Suppo rt and Fie ld Operati ons
  115   Deployment
  116   Execute de ployment
  117   Deployment
  118   5
  119   Individual  Veterans  Administra tion Medic al Centers  (VAMCs)
  120   Installati on
  121   Plan and s chedule in stallation  
  122   Deployment
  123   6
  124    VIP Relea se Agent
  125   Installati on
  126   Ensure aut hority to  operate an d that cer tificate a uthority s ecurity do cumentatio n is in pl ace
  127   Deployment
  128   7
  129   N/A for th is patch a s we are u sing only  the existi ng VistA s ystem
  130   Installati on
  131   Validate t hrough fac ility POC  to ensure  that IT eq uipment ha s been acc epted usin g asset in ventory pr ocesses
  132  
  133   8
  134   VA’s eBusi ness team
  135   Installati ons
  136   Coordinate  training 
  137   Deployment
  138   9
  139   VIP releas e Agent, H ealth Prod uct Suppor t & the de velopment  team
  140   Back-out
  141   Confirm av ailability  of back-o ut instruc tions and  back-out s trategy (w hat are th e criteria  that trig ger a back -out) 
  142   Deployment
  143   10
  144   No changes  to curren t process  – we are u sing the e xisting Vi stA system
  145   Post Deplo yment
  146   Hardware,  Software a nd System  Support
  147   Warranty
  148   Deployment  
  149   The deploy ment is pl anned as a  national  rollout.
  150   This secti on provide s the sche dule and m ilestones  for the de ployment. 
  151   Timeline 
  152   The deploy ment and i nstallatio n is sched uled to ru n for 30 d ays, as de picted in  the master  deploymen t schedule
  153   Site Readi ness Asses sment 
  154   This secti on discuss es the loc ations tha t will rec eive the P RCA*4.5*31 7 deployme nt. 
  155   Deployment  Topology  (Targeted  Architectu re)
  156   This patch  PRCA*4.5* 317 is to  be nationa lly releas ed to all  VAMCs.
  157   Site Infor mation (Lo cations, D eployment  Recipients
  158   The test s ites for I OC testing  are: TBD   
  159   These site s will not  be define d here unt il the sit es have si gned the M emorandum  of Underst anding (MO Us) and te sting has  completed  as sometim es a site  has to sto p testing  prior to t he end of  IOC.
  160  
  161   Upon natio nal releas e all VAMC s are expe cted to in stall this  patch wit hin the co mpliance d ate.
  162   Site Prepa ration 
  163   The follow ing table  describes  preparatio n required  by the si te prior t o deployme nt.
  164   Table 2: S ite Prepar ation
  165   Site/Other
  166   Problem/Ch ange Neede d
  167   Features t o Adapt/Mo dify to Ne w Product
  168   Actions/St eps
  169   Owner
  170   N/A
  171   N/A
  172   N/A
  173   N/A
  174   N/A
  175   Resources
  176   Facility S pecifics
  177   The follow ing table  lists faci lity-speci fic featur es require d for depl oyment.
  178   Table 3: F acility-Sp ecific Fea tures
  179   Site
  180   Space/Room
  181   Features N eeded
  182   Other
  183   N/A
  184   N/A
  185   N/A
  186   N/A
  187   Hardware 
  188   The follow ing table  describes  hardware s pecificati ons requir ed at each  site prio r to deplo yment.
  189   Table 4: H ardware Sp ecificatio ns
  190   Required H ardware
  191   Model
  192   Version
  193   Configurat ion
  194   Manufactur er
  195   Other
  196   Existing V istA syste m
  197   N/A
  198   N/A
  199   N/A
  200   N/A
  201   N/A
  202   Please see  the Roles  and Respo nsibilitie s table in  Section 2  for detai ls about w ho is resp onsible fo r preparin g the site  to meet t hese hardw are specif ications.
  203   Software 
  204   The follow ing table  describes  software s pecificati ons requir ed at each  site prio r to deplo yment.
  205   Table 5: S oftware Sp ecificatio ns
  206   Required S oftware
  207   Make
  208   Version
  209   Configurat ion
  210   Manufactur er
  211   Other
  212   Fully patc hed Accoun ts Receiva ble packag e within V istA
  213   N/A
  214   4.5
  215   N/A
  216   N/A
  217   N/A
  218   PRCA*4.5*3 04
  219   N/A
  220   Nationally  released  version
  221   N/A
  222   N/A
  223   N/A
  224   Please see  the Roles  and Respo nsibilitie s table in  Section 2  above for  details a bout who i s responsi ble for pr eparing th e site to  meet these  software  specificat ions.
  225   Communicat ions 
  226   The sites  that are p articipati ng in fiel d testing  (IOC) will  use the “ Patch Trac king” mess age in Out look to co mmunicate  with the e Payments e Business t eam, the d evelopers,  and produ ct support  personnel .
  227   Deployment /Installat ion/Back-O ut Checkli st
  228   The Releas e Manageme nt team wi ll deploy  the patch  PRCA*4.5*3 17, which  is tracked  in the NP M in Forum , national ly to all  VAMCs.  Fo rum automa tically tr acks the p atches as  they are i nstalled i n the diff erent VAMC  productio n systems.   One can  run a repo rt in Foru m to ident ify when t he patch w as install ed in the  VistA prod uction at  each site,  and by wh om.  A rep ort can al so be run,  to identi fy which s ites have  not instal led the pa tch in the ir VistA p roduction  system as  of that mo ment in ti me.  
  229  
  230   Therefore,  this info rmation do es not nee d to be ma nually tra cked in th e chart be low.
  231   Table 6: 3 .3.4.1Depl oyment/Ins tallation/ Back-Out C hecklist
  232  
  233   Activity
  234   Day
  235   Time
  236   Individual  who compl eted task
  237   Deploy
  238   N/A
  239   N/A
  240   N/A
  241   Install
  242   N/A
  243   N/A
  244   N/A
  245   Back-Out
  246   N/A
  247   N/A
  248   N/A
  249  
  250   Installati on
  251   Pre-instal lation and  System Re quirements
  252   PRCA*4.5*3 17, a patc h to the e xisting Vi stA Accoun ts Receiva ble 4.5 pa ckage, is  installabl e on a ful ly patched  M(UMPS) V istA syste m and oper ates on th e top of t he VistA e nvironment  provided  by the Vis tA infrast ructure pa ckages.  T he later p rovides ut ilities wh ich commun icate with  the under lying oper ating syst em and har dware, the reby provi ding Accou nts Receiv able indep endence fr om variati ons in har dware and  operating  system.
  253   Platform I nstallatio n and Prep aration
  254   Refer to P RCA*4.5*31 7 document ation on t he Nationa l Patch Mo dule (NPM)  on Forum  for the de tailed ins tallation  instructio ns.  These  instructi ons would  include an y pre inst allation s teps if ap plicable.
  255   Download a nd Extract  Files
  256   Refer to P RCA*4.5*31 7 document ation on t he NPM for  where to  find relat ed documen tation tha t can be d ownloaded.   PRCA*4.5 *317 will  be transmi tted via a  PackMan m essage and  can be pu lled from  the NPM.   It is not  a host fil e, and the refore doe s not need  to be dow nloaded se parately.
  257   Database C reation
  258   PRCA*4.5*3 17 does no t modify t he VistA d atabase.   If it did  any change s could be  found on  the NPM do cumentatio n for this  patch. 
  259   Installati on Scripts
  260   No install ation scri pts are ne eded for P RCA*4.5*31 7 installa tion.
  261   Cron Scrip ts
  262   No Cron sc ripts are  needed for  PRCA*4.5* 317 instal lation.
  263   Access Req uirements  and Skills  Needed fo r the Inst allation
  264   The follow ing staff  will need  access to  the PackMa n message  containing  the PRCA* 4.5*317 pa tch or For um’s NPM f or downloa ding the n ationally  released P RCA*4.5*31 7 patch. T he softwar e is to be  installed  by the si te’s or re gion’s des ignated: V A OI&T IT  OPERATIONS  SERVICE,  Enterprise  Service L ines, Vist a Applicat ions Divis ion .
  265   Installati on Procedu re
  266   Refer to P RCA*4.5*31 7 document ation on t he NPM for  the detai led instal lation ins tructions.
  267   Installati on Verific ation Proc edure
  268   Refer to P RCA*4.5*31 7 document ation on t he NPM for  the detai led instal lation ins tructions.   These in structions  would inc lude any p ost instal lation ste ps if appl icable.
  269   System Con figuration
  270   No system  configurat ion change s are requ ired for t his patch.
  271   Database T uning
  272   No reconfi guration o f the Vist A database , memory a llocations  or other  resources  is necessa ry.
  273   Back-Out P rocedure
  274   Back-Out p ertains to  a return  to the las t known go od operati onal state  of the so ftware and  appropria te platfor m settings .  
  275   Back-Out S trategy
  276   Although i t is unlik ely a back -out decis ion due to  major iss ues with t his patch  could occu r during s ite Mirror  Testing,  Site Produ ction Test ing or aft er Nationa l Release  to the fie ld (VAMCs) .  The str ategy woul d depend o n during w hich of th ese stages  the decis ion is mad e.
  277  
  278   If during  Mirror tes ting or Si te Product ion Testin g, unless  the patch  produces c atastrophi c problems , the norm al VistA r esponse wo uld be for  a new ver sion of th e test pat ch correct ing defect s to be pr oduced, re tested and  upon  suc cessfully  passing de velopment  team testi ng would b e resubmit ted to the  site for  testing.   This proje ct, howeve r, has pre pared a se t of back- out patch  instructio ns if nece ssary, as  in the cas e that the  project i s canceled  or the im plemented  design is  found to b e so wrong  and detri mental to  the site’s  delivery  of service s to veter ans that t he softwar e must be  removed.  
  279  
  280   If the def ect(s) wer e not disc overed unt il after n ational re lease but  during the  designate d support  period, a  new patch  will be en tered into  the Natio nal Patch  Module on  Forum and  go through  all the n ecessary m ilestone r eviews etc . as a pat ch for a p atch.  It  is up to V A OI&T and  product s upport whe ther this  new patch  would be d efined as  an emergen cy patch o r not. Aft er the sup port perio d, the Vis tA Mainten ance Progr am would p roduce the  new patch , either t o correct  the defect ive compon ents or to  back-out  the patch.
  281  
  282   In the cas e of PRCA* 4.5*317, a  new patch  would not  be necess ary for ba ck out pur poses as t he site wi ll have a  backup tha t they cre ated durin g the init ial instal l.
  283   Back-Out C onsiderati ons
  284   It is nece ssary to d etermine i f a wholes ale back-o ut/rollbac k of the p atch PRCA* 4.5*317 is  necessary  or if a b etter cour se is to c orrect thr ough a new  version o f the patc h (if prio r to natio nal releas e) or a su bsequent p atch aimed  at specif ic areas m odified or  affected  by the ori ginal patc h (after n ational re lease). If  the back- out is pos t-release  of patch P RCA*4.5*31 7, this pa tch should  be assign ed status  of “Entere d in Error ” in Forum ’s NPM.  
  285   Load Testi ng
  286   N/A. The b ack-out pr ocess woul d be execu ted at nor mal, rathe r than rai sed job pr iority, an d is expec ted to hav e no signi ficant eff ect on tot al system  performanc e.  Subseq uent to th e reversio n, the per formance d emands on  the system  would be  unchanged.
  287   User Accep tance Test ing
  288   For the fo llowing th ree areas  in VistA,  a user wit h a prefer red view o n file sho uld select  the menu  option or  action lis ted below  and confir m that the y are no l onger prom pted with  the questi on “Use pr eferred vi ew?” prior  to the sc reen displ aying the  selected d ata.
  289   ERA Workli st [RCDPE  EDI LOCKBO X WORKLIST ]
  290   ERA Scratc hpad
  291   ERA Workli st [RCDPE  EDI LOCKBO X WORKLIST ]  action  ‘Select ER A’
  292   Auto-Post  Awaiting R esolution  [RCDPE APA R]
  293  
  294   User with  access to  the “EDI L ockbox (eP ayments) R eports Men u…” [RCDPE  EDI LOCKB OX REPORTS  MENU] sho uld pull u p the menu  and confi rm that th e “Unappli ed EFT Dep osits Repo rt” [RCDPE  UNAPPLIED  EFT DEP R EPORT]” op tion is no  longer av ailable.
  295  
  296   It is expe cted that  the IT Sup port can c onfirm tha t the opti on “Unappl ied EFT De posits Rep ort” [RCDP E UNAPPLIE D EFT DEP  REPORT] ha s been rem oved from  the VistA  system.
  297   Back-Out C riteria
  298   The projec t is cance led or the  requested  changes i mplemented  by PRCA*4 .5*317 are  no longer  desired b y VA OI&T  and the eP ayments eB usiness te am.
  299   Back-Out R isks
  300   Before nat ional rele ase: There  are no cu rrent iden tified ris ks of back ing out PR CA*4.5*317  prior to  national r elease.  
  301  
  302   After nati onal relea se:  If th e PRCA*4.5 *317 patch  is to be  backed out  after it  is nationa lly releas ed it may  do so acco rding to t his docume nt only if  none of t he followi ng stateme nts are tr ue.  If an y of the f ollowing s tatements  are true,  refer to t he sub bul lets below  for prope r guidelin es.
  303  
  304   Subsequent  patch(es)  that is c urrently u nder devel opment is  dependent  upon any a spect chan ged by PRC A*4.5*317.
  305   Inform the  teams res ponsible f or the sub sequent pa tch(es) of  the reque st to back out the pa tch so the y can make  any neces sary chang es to thei r software  and sched ule.  With  coordinat ion of the se teams f or the sub sequent pa tch(es), p roceed wit h the back out.
  306  
  307   Subsequent  patch(es)  that is n ationally  released o r has the  status of   ‘complete d/not rele ased’ is d ependent u pon any as pect chang ed by PRCA *4.5*317.
  308   Back-out p rocedures  may not be  executed.   This req uires a ne w patch to  address t he concern .
  309   Authority  for Back-O ut
  310   The order  would come  from: rel ease coord inator (pr oduct supp ort), port folio dire ctor and h ealth prod uct suppor t.
  311   Back-Out P rocedure
  312   A few thin gs need to  be done i n order to  back out  this PRCA* 4.5*317 pa tch. They  are as fol lows: rest ore the ro utines to  their prev ious state , remove a n option f rom a menu , delete a n option,  and rebuil d the menu  trees.  T his will n eed to be  done by th e site’s d esignated  IT support .
  313  
  314   Restore th e routines  to their  previous s tate
  315   The user w as instruc ted to exe cute the m enu option  “Backup a  Transport  Global” [ XPD BACKUP ] when the  patch was  initially  installed  (the very  1st time  if install ed multipl e times).   To restor e the rout ines, loca te the Mai lMan messa ge that wa s created  as part of  that step .  While v iewing the  MailMan m essage, ex tract the  KIDS build , using th e “Xtract  PackMan” a ction.  Th en select  the “INSTA LL/CHECK M ESSAGE” ac tion to re store the  modified r outines. 
  316  
  317   Remove an  option fro m a menu
  318   Within Fil eMan, use  the “ENTER  OR EDIT F ILE ENTRIE S” option  and select  the file  “OPTION” ( #.19).  Wh en prompte d for ‘EDI T WHICH FI ELD’, answ er with th e “MENU” m ultiple (# 10).  When  prompted  for ‘EDIT  WHICH MENU  SUB-FIELD ’, answer  with “ITEM ” (#.01).   When prom pted for “ Select OPT ION NAME”,  answer wi th “EDI Lo ckbox (ePa yments) Re ports Menu …” [RCDPE  EDI LOCKBO X REPORTS  MENU] and  remove/del ete the IT EM [RCDPE  UNAPPLIED  EFT DEP RE PORT] “Una pplied EFT  Deposits  Report”.
  319  
  320   ** IMPORTA NT:  If th e site add ed the opt ion “Unapp lied EFT D eposits Re port” [RCD PE UNAPPLI ED EFT DEP  REPORT] t o any othe r menus, r emove it f rom those  menus as w ell at thi s time.
  321  
  322   Delete an  option
  323   Within Fil eMan, use  the “ENTER  OR EDIT F ILE ENTRIE S” option  and select  the file  “OPTION” ( #.19).  Wh en prompte d for ‘EDI T WHICH FI ELD’, answ er with th e “NAME” ( #.01).  Wh en prompte d for “Sel ect OPTION  NAME”, an swer with  “Unapplied  EFT Depos its Report ” [RCDPE U NAPPLIED E FT DEP REP ORT] .  De lete this  option.  W hen prompt ed for “DO  YOU WANT  THOSE POIN TERS UPDAT ED (WHICH  COULD TAKE  QUITE A W HILE)?”, a nswer NO.
  324   Back-out V erificatio n Procedur e
  325   It is expe cted that  the IT sup port can u se FileMan  to confir m that the  menu opti on “Unappl ied EFT De posits Rep ort” [RCDP E UNAPPLIE D EFT DEP  REPORT] ha s been suc cessfully  removed fr om the Vis tA system.
  326   Rollback P rocedure
  327   Rollback p ertains to  data.  Si nce patch  PRCA*4.5*3 17 does no t impact t he data in  the Accou nts Receiv able packa ge there i s no need  for a roll back proce dure.  The  back-out  procedure  includes i nstruction s of how t o remove a nd delete  a menu opt ion so no  additional  procedure s are nece ssary to r oll back t he VistA s oftware.
  328   Rollback C onsiderati ons
  329   Not applic able.
  330   Rollback C riteria
  331   Not applic able.
  332   Rollback R isks
  333   Not applic able.
  334   Authority  for Rollba ck
  335   Not applic able.  
  336   Rollback P rocedure
  337   Not applic able.
  338   Rollback V erificatio n Procedur e
  339   Not applic able.
  340   Template R evision Hi story
  341   Date
  342   Version
  343   Descriptio n
  344   Author
  345   March 2016
  346   2.2
  347   Changed th e title fr om Install ation, Bac k-Out, and  Rollback  Guide to D eployment  and Instal lation Gui de, with t he underst anding tha t Back-Out  and Rollb ack belong  with Inst allation. 
  348   VIP Team
  349   February 2 016
  350   2.1
  351   Changed ti tle from I nstallatio n, Back-Ou t, and Rol lback Plan  to Instal lation, Ba ck-Out, an d Rollback  Guide as  recommende d by OI&T  Documentat ion Standa rds Commit tee
  352   OI&T Docum entation S tandards C ommittee
  353   December 2 015
  354   2.0
  355   The OI&T D ocumentati on Standar ds Committ ee merged  the existi ng “Instal lation, Ba ck-Out, Ro llback Pla n” templat e with the  content r equirement s in the O I&T End-us er Documen tation Sta ndards for  a more co mprehensiv e Installa tion Plan.
  356   OI&T Docum entation S tandards C ommittee
  357   February 2 015
  358   1.0
  359   Initial Dr aft
  360   Lifecycle  and Releas e Manageme nt