Produced by Araxis Merge on 3/21/2017 9:01:46 AM Central Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.
| # | Location | File | Last Modified |
|---|---|---|---|
| 1 | MCCF.zip\docs | VIP_Deployment_Installation_Roll Back_Back-Out_Guide_ePayment PRCA_4_5_317 v1.docx | Mon Jan 30 18:06:50 2017 UTC |
| 2 | MCCF.zip\docs | VIP_Deployment_Installation_Roll Back_Back-Out_Guide_ePayment PRCA_4_5_317 v1.docx | Tue Mar 21 13:55:04 2017 UTC |
| Description | Between Files 1 and 2 |
|
|---|---|---|
| Text Blocks | Lines | |
| Unchanged | 1 | 720 |
| Changed | 0 | 0 |
| Inserted | 0 | 0 |
| Removed | 0 | 0 |
| Whitespace | |
|---|---|
| Character case | Differences in character case are significant |
| Line endings | Differences in line endings (CR and LF characters) are ignored |
| CR/LF characters | Not shown in the comparison detail |
No regular expressions were active.
| 1 | Medical Ca re Collect ion Fund ( MCCF) Elec tronic Dat a Intercha nge (EDI) Transactio n Applicat ions Suite (TAS) Pha se 1 | |
| 2 | ePayments PRCA*4.5*3 17 | |
| 3 | Version 1. 0 | |
| 4 | Deployment , Installa tion, Back -Out, and Rollback G uide | |
| 5 | ||
| 6 | ||
| 7 | January 20 17 | |
| 8 | Department of Vetera ns Affairs | |
| 9 | Office of Informatio n and Tech nology (OI &T) | |
| 10 | ||
| 11 | ||
| 12 | Revision H istory | |
| 13 | Date | |
| 14 | Version | |
| 15 | Descriptio n | |
| 16 | Author | |
| 17 | January 20 17 | |
| 18 | 1.0 | |
| 19 | Initial Ve rsion | |
| 20 | Darlene Wh ite | |
| 21 | ||
| 22 | ||
| 23 | ||
| 24 | ||
| 25 | ||
| 26 | Artifact R ationale | |
| 27 | This docum ent descri bes the De ployment, Installati on, Back-o ut, and Ro llback Pla n for new products g oing into the VA Ent erprise. T he plan in cludes inf ormation a bout syste m support, issue tra cking, esc alation pr ocesses, a nd roles a nd respons ibilities involved i n all thos e activiti es. Its pu rpose is t o provide clients, s takeholder s, and sup port perso nnel with a smooth t ransition to the new product o r software , and shou ld be stru ctured app ropriately , to refle ct particu lars of th ese proced ures at a single or at multipl e location s. | |
| 28 | Per the Ve teran-focu sed Integr ated Proce ss (VIP) G uide, the Deployment , Installa tion, Back -out, and Rollback P lan is req uired to b e complete d prior t o Critical Decision Point #2 ( CD #2), wi th the exp ectation t hat it wil l be updat ed through out the li fecycle of the proje ct for eac h build, a s needed. | |
| 29 | ||
| 30 | ||
| 31 | ||
| 32 | ||
| 33 | Table of C ontents | |
| 34 | 1Introduct ion1 | |
| 35 | 1.1Purpose 1 | |
| 36 | 1.2Depende ncies1 | |
| 37 | 1.3Constra ints1 | |
| 38 | 2Roles and Responsib ilities1 | |
| 39 | 3Deploymen t2 | |
| 40 | 3.1Timelin e2 | |
| 41 | 3.2Site Re adiness As sessment2 | |
| 42 | 3.2.1Deplo yment Topo logy (Targ eted Archi tecture)2 | |
| 43 | 3.2.2Site Informatio n (Locatio ns, Deploy ment Recip ients)2 | |
| 44 | 3.2.3Site Preparatio n3 | |
| 45 | 3.3Resourc es3 | |
| 46 | 3.3.1Facil ity Specif ics3 | |
| 47 | 3.3.2Hardw are3 | |
| 48 | 3.3.3Softw are3 | |
| 49 | 3.3.4Commu nications4 | |
| 50 | 3.3.4.1Dep loyment/In stallation /Back-Out Checklist4 | |
| 51 | 4Installat ion4 | |
| 52 | 4.1Pre-ins tallation and System Requireme nts4 | |
| 53 | 4.2Platfor m Installa tion and P reparation 5 | |
| 54 | 4.3Downloa d and Extr act Files5 | |
| 55 | 4.4Databas e Creation 5 | |
| 56 | 4.5Install ation Scri pts5 | |
| 57 | 4.6Cron Sc ripts5 | |
| 58 | 4.7Access Requiremen ts and Ski lls Needed for the I nstallatio n5 | |
| 59 | 4.8Install ation Proc edure5 | |
| 60 | 4.9Install ation Veri fication P rocedure5 | |
| 61 | 4.10System Configura tion5 | |
| 62 | 4.11Databa se Tuning6 | |
| 63 | 5Back-Out Procedure6 | |
| 64 | 5.1Back-Ou t Strategy 6 | |
| 65 | 5.2Back-Ou t Consider ations6 | |
| 66 | 5.2.1Load Testing6 | |
| 67 | 5.2.2User Acceptance Testing6 | |
| 68 | 5.3Back-Ou t Criteria 7 | |
| 69 | 5.4Back-Ou t Risks7 | |
| 70 | 5.5Authori ty for Bac k-Out7 | |
| 71 | 5.6Back-Ou t Procedur e7 | |
| 72 | 5.7Back-ou t Verifica tion Proce dure8 | |
| 73 | 6Rollback Procedure8 | |
| 74 | 6.1Rollbac k Consider ations8 | |
| 75 | 6.2Rollbac k Criteria 8 | |
| 76 | 6.3Rollbac k Risks8 | |
| 77 | 6.4Authori ty for Rol lback8 | |
| 78 | 6.5Rollbac k Procedur e9 | |
| 79 | 6.6Rollbac k Verifica tion Proce dure9 | |
| 80 | ||
| 81 | Introducti on | |
| 82 | This docum ent descri bes how to deploy an d install the PRCA*4 .5*317 as well as ho w to back- out the pr oduct and rollback t o a previo us version or data s et. | |
| 83 | Purpose | |
| 84 | The purpos e of this plan is to provide a single, c ommon docu ment that describes how, when, where, an d to whom the PRCA*4 .5*317 wil l be deplo yed and in stalled, a s well as how it is to be back ed out and rolled ba ck, if nec essary. Th e plan als o identifi es resourc es, commun ications p lan, and r ollout sch edule. Spe cific inst ructions f or install ation, bac k-out, and rollback are includ ed in this document. | |
| 85 | Dependenci es | |
| 86 | PRCA*4.5*3 04 must be installed before PR CA*4.5*317 . | |
| 87 | Constraint s | |
| 88 | This patch is intend ed for a f ully patch ed VistA s ystem. | |
| 89 | Roles and Responsibi lities | |
| 90 | Table 1: D eployment, Installat ion, Back- out, and R ollback Ro les and Re sponsibili ties | |
| 91 | ID | |
| 92 | Team | |
| 93 | Phase / Ro le | |
| 94 | Tasks | |
| 95 | Project Ph ase (See S chedule) | |
| 96 | 1 | |
| 97 | VA OI&T, V A OI&T Hea lth Produc t Support & PMO (Le idos) | |
| 98 | Deployment | |
| 99 | Plan and s chedule de ployment ( including orchestrat ion with v endors) | |
| 100 | Planning | |
| 101 | 2 | |
| 102 | Local VAMC and CPAC processes | |
| 103 | ||
| 104 | ||
| 105 | Deployment | |
| 106 | Determine and docume nt the rol es and res ponsibilit ies of tho se involve d in the d eployment. | |
| 107 | Planning | |
| 108 | 3 | |
| 109 | Field Test ing (Initi al Operati ng Capabil ity - IOC) , Health P roduct Sup port Testi ng & VIP R elease Age nt Approva l | |
| 110 | Deployment | |
| 111 | Test for o perational readiness | |
| 112 | Testing | |
| 113 | 4 | |
| 114 | Health pro duct Suppo rt and Fie ld Operati ons | |
| 115 | Deployment | |
| 116 | Execute de ployment | |
| 117 | Deployment | |
| 118 | 5 | |
| 119 | Individual Veterans Administra tion Medic al Centers (VAMCs) | |
| 120 | Installati on | |
| 121 | Plan and s chedule in stallation | |
| 122 | Deployment | |
| 123 | 6 | |
| 124 | VIP Relea se Agent | |
| 125 | Installati on | |
| 126 | Ensure aut hority to operate an d that cer tificate a uthority s ecurity do cumentatio n is in pl ace | |
| 127 | Deployment | |
| 128 | 7 | |
| 129 | N/A for th is patch a s we are u sing only the existi ng VistA s ystem | |
| 130 | Installati on | |
| 131 | Validate t hrough fac ility POC to ensure that IT eq uipment ha s been acc epted usin g asset in ventory pr ocesses | |
| 132 | ||
| 133 | 8 | |
| 134 | VA’s eBusi ness team | |
| 135 | Installati ons | |
| 136 | Coordinate training | |
| 137 | Deployment | |
| 138 | 9 | |
| 139 | VIP releas e Agent, H ealth Prod uct Suppor t & the de velopment team | |
| 140 | Back-out | |
| 141 | Confirm av ailability of back-o ut instruc tions and back-out s trategy (w hat are th e criteria that trig ger a back -out) | |
| 142 | Deployment | |
| 143 | 10 | |
| 144 | No changes to curren t process – we are u sing the e xisting Vi stA system | |
| 145 | Post Deplo yment | |
| 146 | Hardware, Software a nd System Support | |
| 147 | Warranty | |
| 148 | Deployment | |
| 149 | The deploy ment is pl anned as a national rollout. | |
| 150 | This secti on provide s the sche dule and m ilestones for the de ployment. | |
| 151 | Timeline | |
| 152 | The deploy ment and i nstallatio n is sched uled to ru n for 30 d ays, as de picted in the master deploymen t schedule . | |
| 153 | Site Readi ness Asses sment | |
| 154 | This secti on discuss es the loc ations tha t will rec eive the P RCA*4.5*31 7 deployme nt. | |
| 155 | Deployment Topology (Targeted Architectu re) | |
| 156 | This patch PRCA*4.5* 317 is to be nationa lly releas ed to all VAMCs. | |
| 157 | Site Infor mation (Lo cations, D eployment Recipients ) | |
| 158 | The test s ites for I OC testing are: TBD | |
| 159 | These site s will not be define d here unt il the sit es have si gned the M emorandum of Underst anding (MO Us) and te sting has completed as sometim es a site has to sto p testing prior to t he end of IOC. | |
| 160 | ||
| 161 | Upon natio nal releas e all VAMC s are expe cted to in stall this patch wit hin the co mpliance d ate. | |
| 162 | Site Prepa ration | |
| 163 | The follow ing table describes preparatio n required by the si te prior t o deployme nt. | |
| 164 | Table 2: S ite Prepar ation | |
| 165 | Site/Other | |
| 166 | Problem/Ch ange Neede d | |
| 167 | Features t o Adapt/Mo dify to Ne w Product | |
| 168 | Actions/St eps | |
| 169 | Owner | |
| 170 | N/A | |
| 171 | N/A | |
| 172 | N/A | |
| 173 | N/A | |
| 174 | N/A | |
| 175 | Resources | |
| 176 | Facility S pecifics | |
| 177 | The follow ing table lists faci lity-speci fic featur es require d for depl oyment. | |
| 178 | Table 3: F acility-Sp ecific Fea tures | |
| 179 | Site | |
| 180 | Space/Room | |
| 181 | Features N eeded | |
| 182 | Other | |
| 183 | N/A | |
| 184 | N/A | |
| 185 | N/A | |
| 186 | N/A | |
| 187 | Hardware | |
| 188 | The follow ing table describes hardware s pecificati ons requir ed at each site prio r to deplo yment. | |
| 189 | Table 4: H ardware Sp ecificatio ns | |
| 190 | Required H ardware | |
| 191 | Model | |
| 192 | Version | |
| 193 | Configurat ion | |
| 194 | Manufactur er | |
| 195 | Other | |
| 196 | Existing V istA syste m | |
| 197 | N/A | |
| 198 | N/A | |
| 199 | N/A | |
| 200 | N/A | |
| 201 | N/A | |
| 202 | Please see the Roles and Respo nsibilitie s table in Section 2 for detai ls about w ho is resp onsible fo r preparin g the site to meet t hese hardw are specif ications. | |
| 203 | Software | |
| 204 | The follow ing table describes software s pecificati ons requir ed at each site prio r to deplo yment. | |
| 205 | Table 5: S oftware Sp ecificatio ns | |
| 206 | Required S oftware | |
| 207 | Make | |
| 208 | Version | |
| 209 | Configurat ion | |
| 210 | Manufactur er | |
| 211 | Other | |
| 212 | Fully patc hed Accoun ts Receiva ble packag e within V istA | |
| 213 | N/A | |
| 214 | 4.5 | |
| 215 | N/A | |
| 216 | N/A | |
| 217 | N/A | |
| 218 | PRCA*4.5*3 04 | |
| 219 | N/A | |
| 220 | Nationally released version | |
| 221 | N/A | |
| 222 | N/A | |
| 223 | N/A | |
| 224 | Please see the Roles and Respo nsibilitie s table in Section 2 above for details a bout who i s responsi ble for pr eparing th e site to meet these software specificat ions. | |
| 225 | Communicat ions | |
| 226 | The sites that are p articipati ng in fiel d testing (IOC) will use the “ Patch Trac king” mess age in Out look to co mmunicate with the e Payments e Business t eam, the d evelopers, and produ ct support personnel . | |
| 227 | Deployment /Installat ion/Back-O ut Checkli st | |
| 228 | The Releas e Manageme nt team wi ll deploy the patch PRCA*4.5*3 17, which is tracked in the NP M in Forum , national ly to all VAMCs. Fo rum automa tically tr acks the p atches as they are i nstalled i n the diff erent VAMC productio n systems. One can run a repo rt in Foru m to ident ify when t he patch w as install ed in the VistA prod uction at each site, and by wh om. A rep ort can al so be run, to identi fy which s ites have not instal led the pa tch in the ir VistA p roduction system as of that mo ment in ti me. | |
| 229 | ||
| 230 | Therefore, this info rmation do es not nee d to be ma nually tra cked in th e chart be low. | |
| 231 | Table 6: 3 .3.4.1Depl oyment/Ins tallation/ Back-Out C hecklist | |
| 232 | ||
| 233 | Activity | |
| 234 | Day | |
| 235 | Time | |
| 236 | Individual who compl eted task | |
| 237 | Deploy | |
| 238 | N/A | |
| 239 | N/A | |
| 240 | N/A | |
| 241 | Install | |
| 242 | N/A | |
| 243 | N/A | |
| 244 | N/A | |
| 245 | Back-Out | |
| 246 | N/A | |
| 247 | N/A | |
| 248 | N/A | |
| 249 | ||
| 250 | Installati on | |
| 251 | Pre-instal lation and System Re quirements | |
| 252 | PRCA*4.5*3 17, a patc h to the e xisting Vi stA Accoun ts Receiva ble 4.5 pa ckage, is installabl e on a ful ly patched M(UMPS) V istA syste m and oper ates on th e top of t he VistA e nvironment provided by the Vis tA infrast ructure pa ckages. T he later p rovides ut ilities wh ich commun icate with the under lying oper ating syst em and har dware, the reby provi ding Accou nts Receiv able indep endence fr om variati ons in har dware and operating system. | |
| 253 | Platform I nstallatio n and Prep aration | |
| 254 | Refer to P RCA*4.5*31 7 document ation on t he Nationa l Patch Mo dule (NPM) on Forum for the de tailed ins tallation instructio ns. These instructi ons would include an y pre inst allation s teps if ap plicable. | |
| 255 | Download a nd Extract Files | |
| 256 | Refer to P RCA*4.5*31 7 document ation on t he NPM for where to find relat ed documen tation tha t can be d ownloaded. PRCA*4.5 *317 will be transmi tted via a PackMan m essage and can be pu lled from the NPM. It is not a host fil e, and the refore doe s not need to be dow nloaded se parately. | |
| 257 | Database C reation | |
| 258 | PRCA*4.5*3 17 does no t modify t he VistA d atabase. If it did any change s could be found on the NPM do cumentatio n for this patch. | |
| 259 | Installati on Scripts | |
| 260 | No install ation scri pts are ne eded for P RCA*4.5*31 7 installa tion. | |
| 261 | Cron Scrip ts | |
| 262 | No Cron sc ripts are needed for PRCA*4.5* 317 instal lation. | |
| 263 | Access Req uirements and Skills Needed fo r the Inst allation | |
| 264 | The follow ing staff will need access to the PackMa n message containing the PRCA* 4.5*317 pa tch or For um’s NPM f or downloa ding the n ationally released P RCA*4.5*31 7 patch. T he softwar e is to be installed by the si te’s or re gion’s des ignated: V A OI&T IT OPERATIONS SERVICE, Enterprise Service L ines, Vist a Applicat ions Divis ion . | |
| 265 | Installati on Procedu re | |
| 266 | Refer to P RCA*4.5*31 7 document ation on t he NPM for the detai led instal lation ins tructions. | |
| 267 | Installati on Verific ation Proc edure | |
| 268 | Refer to P RCA*4.5*31 7 document ation on t he NPM for the detai led instal lation ins tructions. These in structions would inc lude any p ost instal lation ste ps if appl icable. | |
| 269 | System Con figuration | |
| 270 | No system configurat ion change s are requ ired for t his patch. | |
| 271 | Database T uning | |
| 272 | No reconfi guration o f the Vist A database , memory a llocations or other resources is necessa ry. | |
| 273 | Back-Out P rocedure | |
| 274 | Back-Out p ertains to a return to the las t known go od operati onal state of the so ftware and appropria te platfor m settings . | |
| 275 | Back-Out S trategy | |
| 276 | Although i t is unlik ely a back -out decis ion due to major iss ues with t his patch could occu r during s ite Mirror Testing, Site Produ ction Test ing or aft er Nationa l Release to the fie ld (VAMCs) . The str ategy woul d depend o n during w hich of th ese stages the decis ion is mad e. | |
| 277 | ||
| 278 | If during Mirror tes ting or Si te Product ion Testin g, unless the patch produces c atastrophi c problems , the norm al VistA r esponse wo uld be for a new ver sion of th e test pat ch correct ing defect s to be pr oduced, re tested and upon suc cessfully passing de velopment team testi ng would b e resubmit ted to the site for testing. This proje ct, howeve r, has pre pared a se t of back- out patch instructio ns if nece ssary, as in the cas e that the project i s canceled or the im plemented design is found to b e so wrong and detri mental to the site’s delivery of service s to veter ans that t he softwar e must be removed. | |
| 279 | ||
| 280 | If the def ect(s) wer e not disc overed unt il after n ational re lease but during the designate d support period, a new patch will be en tered into the Natio nal Patch Module on Forum and go through all the n ecessary m ilestone r eviews etc . as a pat ch for a p atch. It is up to V A OI&T and product s upport whe ther this new patch would be d efined as an emergen cy patch o r not. Aft er the sup port perio d, the Vis tA Mainten ance Progr am would p roduce the new patch , either t o correct the defect ive compon ents or to back-out the patch. | |
| 281 | ||
| 282 | In the cas e of PRCA* 4.5*317, a new patch would not be necess ary for ba ck out pur poses as t he site wi ll have a backup tha t they cre ated durin g the init ial instal l. | |
| 283 | Back-Out C onsiderati ons | |
| 284 | It is nece ssary to d etermine i f a wholes ale back-o ut/rollbac k of the p atch PRCA* 4.5*317 is necessary or if a b etter cour se is to c orrect thr ough a new version o f the patc h (if prio r to natio nal releas e) or a su bsequent p atch aimed at specif ic areas m odified or affected by the ori ginal patc h (after n ational re lease). If the back- out is pos t-release of patch P RCA*4.5*31 7, this pa tch should be assign ed status of “Entere d in Error ” in Forum ’s NPM. | |
| 285 | Load Testi ng | |
| 286 | N/A. The b ack-out pr ocess woul d be execu ted at nor mal, rathe r than rai sed job pr iority, an d is expec ted to hav e no signi ficant eff ect on tot al system performanc e. Subseq uent to th e reversio n, the per formance d emands on the system would be unchanged. | |
| 287 | User Accep tance Test ing | |
| 288 | For the fo llowing th ree areas in VistA, a user wit h a prefer red view o n file sho uld select the menu option or action lis ted below and confir m that the y are no l onger prom pted with the questi on “Use pr eferred vi ew?” prior to the sc reen displ aying the selected d ata. | |
| 289 | ERA Workli st [RCDPE EDI LOCKBO X WORKLIST ] | |
| 290 | ERA Scratc hpad | |
| 291 | ERA Workli st [RCDPE EDI LOCKBO X WORKLIST ] action ‘Select ER A’ | |
| 292 | Auto-Post Awaiting R esolution [RCDPE APA R] | |
| 293 | ||
| 294 | User with access to the “EDI L ockbox (eP ayments) R eports Men u…” [RCDPE EDI LOCKB OX REPORTS MENU] sho uld pull u p the menu and confi rm that th e “Unappli ed EFT Dep osits Repo rt” [RCDPE UNAPPLIED EFT DEP R EPORT]” op tion is no longer av ailable. | |
| 295 | ||
| 296 | It is expe cted that the IT Sup port can c onfirm tha t the opti on “Unappl ied EFT De posits Rep ort” [RCDP E UNAPPLIE D EFT DEP REPORT] ha s been rem oved from the VistA system. | |
| 297 | Back-Out C riteria | |
| 298 | The projec t is cance led or the requested changes i mplemented by PRCA*4 .5*317 are no longer desired b y VA OI&T and the eP ayments eB usiness te am. | |
| 299 | Back-Out R isks | |
| 300 | Before nat ional rele ase: There are no cu rrent iden tified ris ks of back ing out PR CA*4.5*317 prior to national r elease. | |
| 301 | ||
| 302 | After nati onal relea se: If th e PRCA*4.5 *317 patch is to be backed out after it is nationa lly releas ed it may do so acco rding to t his docume nt only if none of t he followi ng stateme nts are tr ue. If an y of the f ollowing s tatements are true, refer to t he sub bul lets below for prope r guidelin es. | |
| 303 | ||
| 304 | Subsequent patch(es) that is c urrently u nder devel opment is dependent upon any a spect chan ged by PRC A*4.5*317. | |
| 305 | Inform the teams res ponsible f or the sub sequent pa tch(es) of the reque st to back out the pa tch so the y can make any neces sary chang es to thei r software and sched ule. With coordinat ion of the se teams f or the sub sequent pa tch(es), p roceed wit h the back out. | |
| 306 | ||
| 307 | Subsequent patch(es) that is n ationally released o r has the status of ‘complete d/not rele ased’ is d ependent u pon any as pect chang ed by PRCA *4.5*317. | |
| 308 | Back-out p rocedures may not be executed. This req uires a ne w patch to address t he concern . | |
| 309 | Authority for Back-O ut | |
| 310 | The order would come from: rel ease coord inator (pr oduct supp ort), port folio dire ctor and h ealth prod uct suppor t. | |
| 311 | Back-Out P rocedure | |
| 312 | A few thin gs need to be done i n order to back out this PRCA* 4.5*317 pa tch. They are as fol lows: rest ore the ro utines to their prev ious state , remove a n option f rom a menu , delete a n option, and rebuil d the menu trees. T his will n eed to be done by th e site’s d esignated IT support . | |
| 313 | ||
| 314 | Restore th e routines to their previous s tate | |
| 315 | The user w as instruc ted to exe cute the m enu option “Backup a Transport Global” [ XPD BACKUP ] when the patch was initially installed (the very 1st time if install ed multipl e times). To restor e the rout ines, loca te the Mai lMan messa ge that wa s created as part of that step . While v iewing the MailMan m essage, ex tract the KIDS build , using th e “Xtract PackMan” a ction. Th en select the “INSTA LL/CHECK M ESSAGE” ac tion to re store the modified r outines. | |
| 316 | ||
| 317 | Remove an option fro m a menu | |
| 318 | Within Fil eMan, use the “ENTER OR EDIT F ILE ENTRIE S” option and select the file “OPTION” ( #.19). Wh en prompte d for ‘EDI T WHICH FI ELD’, answ er with th e “MENU” m ultiple (# 10). When prompted for ‘EDIT WHICH MENU SUB-FIELD ’, answer with “ITEM ” (#.01). When prom pted for “ Select OPT ION NAME”, answer wi th “EDI Lo ckbox (ePa yments) Re ports Menu …” [RCDPE EDI LOCKBO X REPORTS MENU] and remove/del ete the IT EM [RCDPE UNAPPLIED EFT DEP RE PORT] “Una pplied EFT Deposits Report”. | |
| 319 | ||
| 320 | ** IMPORTA NT: If th e site add ed the opt ion “Unapp lied EFT D eposits Re port” [RCD PE UNAPPLI ED EFT DEP REPORT] t o any othe r menus, r emove it f rom those menus as w ell at thi s time. | |
| 321 | ||
| 322 | Delete an option | |
| 323 | Within Fil eMan, use the “ENTER OR EDIT F ILE ENTRIE S” option and select the file “OPTION” ( #.19). Wh en prompte d for ‘EDI T WHICH FI ELD’, answ er with th e “NAME” ( #.01). Wh en prompte d for “Sel ect OPTION NAME”, an swer with “Unapplied EFT Depos its Report ” [RCDPE U NAPPLIED E FT DEP REP ORT] . De lete this option. W hen prompt ed for “DO YOU WANT THOSE POIN TERS UPDAT ED (WHICH COULD TAKE QUITE A W HILE)?”, a nswer NO. | |
| 324 | Back-out V erificatio n Procedur e | |
| 325 | It is expe cted that the IT sup port can u se FileMan to confir m that the menu opti on “Unappl ied EFT De posits Rep ort” [RCDP E UNAPPLIE D EFT DEP REPORT] ha s been suc cessfully removed fr om the Vis tA system. | |
| 326 | Rollback P rocedure | |
| 327 | Rollback p ertains to data. Si nce patch PRCA*4.5*3 17 does no t impact t he data in the Accou nts Receiv able packa ge there i s no need for a roll back proce dure. The back-out procedure includes i nstruction s of how t o remove a nd delete a menu opt ion so no additional procedure s are nece ssary to r oll back t he VistA s oftware. | |
| 328 | Rollback C onsiderati ons | |
| 329 | Not applic able. | |
| 330 | Rollback C riteria | |
| 331 | Not applic able. | |
| 332 | Rollback R isks | |
| 333 | Not applic able. | |
| 334 | Authority for Rollba ck | |
| 335 | Not applic able. | |
| 336 | Rollback P rocedure | |
| 337 | Not applic able. | |
| 338 | Rollback V erificatio n Procedur e | |
| 339 | Not applic able. | |
| 340 | Template R evision Hi story | |
| 341 | Date | |
| 342 | Version | |
| 343 | Descriptio n | |
| 344 | Author | |
| 345 | March 2016 | |
| 346 | 2.2 | |
| 347 | Changed th e title fr om Install ation, Bac k-Out, and Rollback Guide to D eployment and Instal lation Gui de, with t he underst anding tha t Back-Out and Rollb ack belong with Inst allation. | |
| 348 | VIP Team | |
| 349 | February 2 016 | |
| 350 | 2.1 | |
| 351 | Changed ti tle from I nstallatio n, Back-Ou t, and Rol lback Plan to Instal lation, Ba ck-Out, an d Rollback Guide as recommende d by OI&T Documentat ion Standa rds Commit tee | |
| 352 | OI&T Docum entation S tandards C ommittee | |
| 353 | December 2 015 | |
| 354 | 2.0 | |
| 355 | The OI&T D ocumentati on Standar ds Committ ee merged the existi ng “Instal lation, Ba ck-Out, Ro llback Pla n” templat e with the content r equirement s in the O I&T End-us er Documen tation Sta ndards for a more co mprehensiv e Installa tion Plan. | |
| 356 | OI&T Docum entation S tandards C ommittee | |
| 357 | February 2 015 | |
| 358 | 1.0 | |
| 359 | Initial Dr aft | |
| 360 | Lifecycle and Releas e Manageme nt |
Araxis Merge (but not the data content of this report) is Copyright © 1993-2016 Araxis Ltd (www.araxis.com). All rights reserved.