Produced by Araxis Merge on 6/11/2019 10:54:37 AM Eastern Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.
| # | Location | File | Last Modified |
|---|---|---|---|
| 1 | HTRE_P3_v14.5_iter_4_build_14.zip | 219291_RM_1077436_US 937286_Update three_PSS_reports_so_Satisfaction_Survey.docx | Mon Jun 10 17:22:06 2019 UTC |
| 2 | HTRE_P3_v14.5_iter_4_build_14.zip | 219291_RM_1077436_US 937286_Update three_PSS_reports_so_Satisfaction_Survey.docx | Tue Jun 11 11:55:03 2019 UTC |
| Description | Between Files 1 and 2 |
|
|---|---|---|
| Text Blocks | Lines | |
| Unchanged | 2 | 638 |
| Changed | 1 | 2 |
| Inserted | 0 | 0 |
| Removed | 0 | 0 |
| Whitespace | |
|---|---|
| Character case | Differences in character case are significant |
| Line endings | Differences in line endings (CR and LF characters) are ignored |
| CR/LF characters | Not shown in the comparison detail |
No regular expressions were active.
| 1 | 219291: RM 1077436_U S 937286_U pdate thre e PSS repo rts so the y can be r un for a Y early time frame_Sati sfaction S urvey Resu lts Report | |
| 2 | Creation D ate: Mar 6, 2019 11 :39:16 AM (UTC-06:00 )Last Modi fied: May 7, 2019 3: 46:07 PM ( UTC-05:00) | |
| 3 | ||
| 4 | State: App roved | |
| 5 | Originator : Moharal la, Srilak shmi (Libe rty IT Sol utions)Own er: Mohara lla, Srila kshmi (Lib erty IT So lutions) T ype: Manua l | |
| 6 | Test Data: Unassigne d | |
| 7 | ||
| 8 | Copied Fro m:RM 10730 48_US 2371 92_Update three PSS reports so they can be run for a Quarter timeframe _Satisfact ion Survey Results R eport | |
| 9 | ||
| 10 | Descriptio n: 1. The report ge neration p age for th e Satisfac tion Surve y Results Reports, D istributio n of Surve ys Reports , and Surv ey Trends Report all ows for en try of ran ge of date s/months, quarters, or years. | |
| 11 | The Satisf action Sur vey Result s Reports, Distribut ion of Sur veys Repor ts, and Su rvey Trend s Report a llows for entry of t he same be ginning an d end valu es to gene rate the r eport for a single d ate/month, quarter, or year. | |
| 12 | The beginn ing quarte r default is the pri or quarter . | |
| 13 | The ending quarter d efault is the curren t quarter. | |
| 14 | The beginn ing year d efault is the prior year. | |
| 15 | The ending year defa ult is the current y ear. | |
| 16 | The defaul t timefram e is the d ate/month selection. | |
| 17 | When a tim eframe is selected, the beginn ing and en d values f or only th at timefra me may be edited. | |
| 18 | When a tim eframe is selected, beginning and end va lues for t he remaini ng two tim eframes ma y not be e dited. | |
| 19 | Satisfacti on Survey Results Re ports, Dis tribution of Surveys Reports, and Survey Trends Re port refle ct the sel ected time frame in t he report title. | |
| 20 | The only v alues incl uded in th e results output are those val ues that f all within the selec ted timefr ame. | |
| 21 | Values out side the s elected ti meframe ar e not incl uded in th e results output. | |
| 22 | For output in table form, the column hea ders that currently display a timeframe reflect th e selected timeframe | |
| 23 | Regardless of timefr ame, repre sents the selected t imeframe. | |
| 24 | The report title, x- axis, and label of t he bar gra ph generat ed from th e Satisfac tion Surve y Results Reports re flect the selected t imeframe. | |
| 25 | When the q uestion te xt is clic ked, the b ar graph o nly genera tes if six or fewer time perio ds were se lected whe n the Sati sfaction S urvey Resu lts Report s was gene rated. | |
| 26 | The bar gr aph will n ot generat e if more than six t ime period s were sel ected when the Satis faction Su rvey Resul ts Reports was gener ated and t he error m essage “Yo u must sel ect less t han or equ al to 6 ti me periods to displa y a graph. ” displays . | |
| 27 | The report title, x- axis, and label of t he line or bar chart generated from the Survey Tre nds Report s reflect the select ed timefra me. | |
| 28 | The help t ext for th e Satisfac tion Surve y Results Reports, D istributio n of Surve ys Reports , and the Survey Tre nds Report has been updated to include a dditional timeframe choices. | |
| 29 | ||
| 30 | Summary | |
| 31 | ||
| 32 | Categories | |
| 33 | Function: Unassigned Test Phas e: Unassig ned | |
| 34 | ||
| 35 | Formal Rev iew | |
| 36 | ||
| 37 | ||
| 38 | General Co mments | |
| 39 | ||
| 40 | Manual Ste ps | |
| 41 | ||
| 42 | ||
| 43 | Step 1 | |
| 44 | Execution Step | |
| 45 | ||
| 46 | Descriptio n* | |
| 47 | login to I HTA Enviro nment. htt ps:// DNS . URL | |
| 48 | ||
| 49 | Expected R esults | |
| 50 | User succe ssfully lo gged in. | |
| 51 | ||
| 52 | ||
| 53 | ||
| 54 | Comments | |
| 55 | Validates Attachment s | |
| 56 | ||
| 57 | ||
| 58 | Step 2 | |
| 59 | Execution Step | |
| 60 | ||
| 61 | Descriptio n* | |
| 62 | Click on H T Reports > Satisfac tion Surve y Results Reports. | |
| 63 | ||
| 64 | Expected R esults | |
| 65 | Patient Sa tisfaction Survey Re sults page is displa yed. Comme nts | |
| 66 | Validates | |
| 67 | ||
| 68 | Attachment s | |
| 69 | ||
| 70 | ||
| 71 | Step 3 | |
| 72 | Execution Step | |
| 73 | ||
| 74 | Descriptio n* | |
| 75 | Verify Mon th label i s displaye d where da tes can be selected as Month w ise | |
| 76 | ||
| 77 | Expected R esults | |
| 78 | Month labe l is displ ayed and c an be sele cted as mo nthly. Com ments | |
| 79 | Validates | |
| 80 | ||
| 81 | Attachment s | |
| 82 | ||
| 83 | ||
| 84 | Step 4 | |
| 85 | Execution Step | |
| 86 | ||
| 87 | Descriptio n* | |
| 88 | Verify "Ye arly" labe l is displ ayed where Quarterly timeframe can be se lected. | |
| 89 | ||
| 90 | Expected R esults | |
| 91 | "Yearly" T imeframe i s displaye d. | |
| 92 | ||
| 93 | Comments V alidates A ttachments | |
| 94 | ||
| 95 | ||
| 96 | Step 5 | |
| 97 | Execution Step | |
| 98 | ||
| 99 | ||
| 100 | ||
| 101 | Descriptio n* | |
| 102 | Verify Yea rly Label allows Onl y From FY - To FY in Yearly ra nge only. | |
| 103 | ||
| 104 | Expected R esults | |
| 105 | Allows the entry of a range of Yearly on ly in Year and no ot her time f rame date range is a llowed. | |
| 106 | Comments V alidates | |
| 107 | Attachment s | |
| 108 | ||
| 109 | ||
| 110 | Step 6 | |
| 111 | Execution Step | |
| 112 | ||
| 113 | Descriptio n* | |
| 114 | Verify "Ye arly" is r an , where From FY - 2014 - TO FY - 2019 | |
| 115 | ||
| 116 | Expected R esults | |
| 117 | Reports ge nerated ie for Oct-2 013 to til l date 201 9. | |
| 118 | ||
| 119 | Statistics for Patie nt Satisfa ction Surv eys by Yea rs - Natio nal, All V endors, Al l Categori es of Care Except L2 , Pat Sat Version 2, Percentag es, Oct 1, 2013 thro ugh May 1, 2019 | |
| 120 | Comments V alidates A ttachments | |
| 121 | ||
| 122 | ||
| 123 | Step 7 | |
| 124 | Execution Step | |
| 125 | ||
| 126 | Descriptio n* | |
| 127 | Verify "Fi scal" wher e From FY is always previous F iscal Year . Ie 2018 | |
| 128 | ||
| 129 | Expected R esults | |
| 130 | Default Fr om FY is 2 018 in Fis cal Year . Comments | |
| 131 | Validates | |
| 132 | ||
| 133 | Attachment s | |
| 134 | ||
| 135 | ||
| 136 | Step 8 | |
| 137 | Execution Step | |
| 138 | ||
| 139 | Descriptio n* | |
| 140 | Verify "Fi scal" wher e To Fy is always cu rrent Fisc al Year ie 2019 | |
| 141 | ||
| 142 | Expected R esults | |
| 143 | Default To Fy is 201 9 for toda y ie May 1 st 2019. | |
| 144 | ||
| 145 | Comments | |
| 146 | ||
| 147 | ||
| 148 | ||
| 149 | Validates | |
| 150 | ||
| 151 | Attachment s | |
| 152 | ||
| 153 | ||
| 154 | Step 9 | |
| 155 | Execution Step | |
| 156 | ||
| 157 | Descriptio n* | |
| 158 | User is al lowed to s elect only Month, Qu arter or F iscal Year time fram e ie only one at a t ime | |
| 159 | ||
| 160 | Expected R esults | |
| 161 | Month, Qua rter or Fi scal year only one t ime frame is allowed to select Comments | |
| 162 | Validates | |
| 163 | ||
| 164 | Attachment s | |
| 165 | ||
| 166 | ||
| 167 | Step 10 | |
| 168 | Execution Step | |
| 169 | ||
| 170 | Descriptio n* | |
| 171 | Verify def ault time frame is " Month" in Satisfacti on survey results re ports. | |
| 172 | ||
| 173 | Expected R esults | |
| 174 | "Month" ti meframe is default i n Satisfac tion surve y results reports. C omments | |
| 175 | Validates | |
| 176 | ||
| 177 | Attachment s | |
| 178 | ||
| 179 | ||
| 180 | Step 11 | |
| 181 | Execution Step | |
| 182 | ||
| 183 | Descriptio n* | |
| 184 | Verify use r can only edit the single tim eframe whe re the FRO M and TO v alues is e dited only for the s elected ti meframe ie Month or Quarter or Fiscal Ye ar either one | |
| 185 | If user se lects Fisc al Year ti me frame | |
| 186 | ||
| 187 | Expected R esults | |
| 188 | Fiscal Yea r time fra me From Fy and To Fy is only e dited and Month time frame and Quarter T ime frame is disable d. Comment s | |
| 189 | Validates | |
| 190 | ||
| 191 | Attachment s | |
| 192 | ||
| 193 | ||
| 194 | Step 12 | |
| 195 | Execution Step | |
| 196 | ||
| 197 | Descriptio n* | |
| 198 | Click on R adio butto n for "VIS N Totals" and Fisca l Year Tim e frame wi th 2017 an d 2019 Res t to defau lt Paramet er. | |
| 199 | ||
| 200 | ||
| 201 | ||
| 202 | Note : Try with diff erent Para meters ie National t otals and Fac Totals with Year Time fram e. Expecte d Results | |
| 203 | User selec ts the par ameters su ccessfully . Comments | |
| 204 | Validates | |
| 205 | ||
| 206 | Attachment s | |
| 207 | ||
| 208 | ||
| 209 | Step 13 | |
| 210 | Execution Step | |
| 211 | ||
| 212 | Descriptio n* | |
| 213 | Click on G enerate Re port. | |
| 214 | ||
| 215 | Expected R esults | |
| 216 | User shall be able t o successf ully gener ate a repo rt with ti tle reflec ts the sel ected time frame ie | |
| 217 | "Statistic s for Pati ent Satisf action Sur veys by Ye ars - All VISNs, All Vendors, All Catego ries of Ca re Except L2, Pat Sa t Version 2, Percent ages, Oct 1, 2016 th rough May 1, 2019" | |
| 218 | Comments V alidates A ttachments | |
| 219 | ||
| 220 | ||
| 221 | Step 14 | |
| 222 | Execution Step | |
| 223 | ||
| 224 | Descriptio n* | |
| 225 | Verify the Generated report wi th Values are for se lected Fis cal Yearly Time fram e. | |
| 226 | ||
| 227 | Expected R esults | |
| 228 | Reports Ge nerated fr om Oct 1, 2016 to Ma y 1 2019. Comments | |
| 229 | Validates | |
| 230 | ||
| 231 | Attachment s | |
| 232 | ||
| 233 | ||
| 234 | Step 15 | |
| 235 | Execution Step | |
| 236 | ||
| 237 | Descriptio n* | |
| 238 | Verify cli cking the text of a survey que stion on t he Satisfa ction Surv ey Results Reports. | |
| 239 | ||
| 240 | Expected R esults | |
| 241 | The bar gr aph that d isplays re presents t he selecte d timefram e Oct 1, 2 016 to May 1, 2019. | |
| 242 | Comments | |
| 243 | ||
| 244 | ||
| 245 | ||
| 246 | Validates | |
| 247 | ||
| 248 | Attachment s | |
| 249 | ||
| 250 | ||
| 251 | Step 16 | |
| 252 | Execution Step | |
| 253 | ||
| 254 | Descriptio n* | |
| 255 | Verify the Bar graph displayed has the s ame title with selec ted timefr ame. | |
| 256 | ||
| 257 | Expected R esults | |
| 258 | Bargraph t itle displ ays for th e timefram e selected are Fisca l Year | |
| 259 | ||
| 260 | Statistics for Patie nt Satisfa ction Surv eys by Yea rs - All V ISNs, All Vendors, A ll Categor ies | |
| 261 | ||
| 262 | of Care Ex cept L2, P at Sat Ver sion 2, Pe rcentages, Oct 1, 20 16 through May 1, 20 19 | |
| 263 | Comments V alidates | |
| 264 | Attachment s | |
| 265 | ||
| 266 | ||
| 267 | Step 17 | |
| 268 | Execution Step | |
| 269 | ||
| 270 | Descriptio n* | |
| 271 | Verify the "X" axis is display ed with se lected tim eframe for eg : Fisc al Years 2 017 to 201 9 then x a xis should have Year ly.. | |
| 272 | ||
| 273 | Expected R esults | |
| 274 | The select ed timefra me display s on the x -axis | |
| 275 | FY2017, F Y 2018 and FY2019 is displayed in x- axi s | |
| 276 | Comments V alidates | |
| 277 | Attachment s | |
| 278 | ||
| 279 | ||
| 280 | Step 18 | |
| 281 | Execution Step | |
| 282 | ||
| 283 | Descriptio n* | |
| 284 | Verify the label bel ow the bar graph dis plays “Ave rage Answe r " depend ing on the timeframe selected. | |
| 285 | Expected R esults | |
| 286 | “Average A nswer" is displayed since Fisc al Year ti meframe se lected. Co mments | |
| 287 | Validates | |
| 288 | ||
| 289 | ||
| 290 | ||
| 291 | Attachment s | |
| 292 | ||
| 293 | ||
| 294 | Step 19 | |
| 295 | Execution Step | |
| 296 | ||
| 297 | Descriptio n* | |
| 298 | Verify If the Quarte r/ Month / Fiscal Yea r timefram e selected when I ge nerate the report co nsists of more than six interv als ie mor e than 6 c olumns the n the err or message , “You mus t select l ess than o r equal to 6 time pe riods to d isplay a g raph.” dis plays and the bar gr aph does n ot display . | |
| 299 | Expected R esults | |
| 300 | Generated report is displayed but when c licked on survey que stion ther e is a err or message displayed "“You mus t select l ess than o r equal to 6 time pe riods to d isplay a g raph.” | |
| 301 | Comments V alidates | |
| 302 | Attachment s | |
| 303 | ||
| 304 | ||
| 305 | Step 20 | |
| 306 | Execution Step | |
| 307 | ||
| 308 | Descriptio n* | |
| 309 | Verify the Help text include t he Month,Q uarter and Fiscal Ye ar timefra me. | |
| 310 | ||
| 311 | Expected R esults | |
| 312 | Month,Quar ter and Fi scal Year Timeframe in include d in Help text in Sa tisfaction Survey Re sults Repo rts. Comme nts | |
| 313 | Validates | |
| 314 | ||
| 315 | Attachment s | |
| 316 | ||
| 317 | Associated Electroni c Signatur es | |
| 318 | ||
| 319 | ||
| 320 | SignedActi onSignerCo mmentAddit ional Info rmation |
Araxis Merge (but not the data content of this report) is Copyright © 1993-2016 Araxis Ltd (www.araxis.com). All rights reserved.