9. EPMO Open Source Coordination Office Redaction File Detail Report

Produced by Araxis Merge on 7/13/2017 3:41:35 PM Eastern Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.

9.1 Files compared

# Location File Last Modified
1 Genisis_v3.zip\Release 3_Docs Genisis2_Section_508_Self_Certification_Document_06162017.docx Tue Jul 11 16:55:24 2017 UTC
2 Genisis_v3.zip\Release 3_Docs Genisis2_Section_508_Self_Certification_Document_06162017.docx Wed Jul 12 20:10:02 2017 UTC

9.2 Comparison summary

Description Between
Files 1 and 2
Text Blocks Lines
Unchanged 4 96
Changed 4 8
Inserted 0 0
Removed 0 0

9.3 Comparison options

Whitespace
Character case Differences in character case are significant
Line endings Differences in line endings (CR and LF characters) are ignored
CR/LF characters Not shown in the comparison detail

9.4 Active regular expressions

No regular expressions were active.

9.5 Comparison detail

  1   Section 50 8 Self-Cer tification  Document
  2   The respon sibility f or ensurin g IT produ cts meet 5 08 require ments rest s with the  Program/P roject Man ager for a  given pro ject.  The  508 Staff  may, at t heir discr etion, per form an au dit to con firm 508 c onformance . VA Secti on 508 is  pleased to  work in c ooperation  with the  responsibl e parties  in their e ffort to i mplement 5 08 require ments and  report the ir results  to the Of fice of th e CIO.
  3   Visit http :// DNS  for more  informatio n.
  4  
  5   1 - Projec t/Program  Manager’s  Last Name,  First Nam e and Offi ce
  6  
  7   Thomas, Ka tie Office  of Inform ation Tech nology (OI T)
  8   2 – P/PM’s  Phone Num ber
  9   PII
  10   3 - P /PM  ’s Email A ddress
  11   PII
  12   4 - Progra m Name
  13   Million Ve teran Prog ram (MVP)
  14   5 - Projec t Name - ( exactly as  listed in  EPS if ap plicable)
  15  
  16   Genomic In formation  System for  Integrate d Science  2 (Genisis 2) Technic al Service s
  17   6 ­ EPS Nu mber (if a pplicable)  or Identi fying Proj ect Number
  18  
  19   01-02-03-2 0-12-001
  20   7 - Brief  Descriptio n of the p roduct
  21   See attach ed documen t for prod uct descri ption.
  22   8 - What i s the pote ntial numb er of user s for this  product?
  23   < 10< 100<  1,000< 50 00> 5000
  24   9 - Is the  product f or interna l VA users  or for ex ternal non -VA users?
  25   InternalEx ternalUnkn own
  26   10 - It is  required  to submit  the URL to  a complet ed WorldSp ace report . A comple ted WorldS pace repor t must sho w no criti cal or ser ious 508 i ssues. For  all PMAS  projects,  the Self-C ertificati on will no t be proce ssed for t he Milesto ne 2 Revie w until al l critical  and serio us 508 iss ues, as no ted in the  WorldSpac e report,  have been  resolved.  The PM mus t acknowle dge that a ny outstan ding 508    issues fo und in the  508 audit  must be r esolved wi thin 60 da ys of rece ipt of the  audit rep ort. If th e program  cannot be  scanned by  the World Space tool , then the  appropria te complet ed Section  508 check lists must  be submit ted.
  27  
  28   Genisis 2  internal i ntranet ap plication.  The VA 50 8 Complian ce team ha s instruct ions for a ccessing t he applica tion.
  29   11 - If th is Self-Ce rtificatio n is being  submitted  for the f irst time,  also subm it a separ ate Micros oft Word d ocument th at describ es the met hodology u sed to con duct the 5 08 testing .
  30   If this Se lf-Certifi cation is  being subm itted, fol lowing a S ection 508  Temporary  Waiver ap plication,  also subm it a separ ate Micros oft Word d ocument th at describ es the rem ediation p lan which  was execut ed: includ ing dates  and any fi ndings.
  31  
  32  
  33  
  34  
  35  
  36  
  37  
  38  
  39  
  40  
  41  
  42  
  43  
  44   This Self- Certificat ion must b e signed b elow and s ubmitted w ith a Conf ormance Va lidation S tatement ( CVS) and i f applicab le, a comp leted
  45   Voluntary  Product Ac cessibilit y Template  (VPAT). B y signing  this docum ent you ce rtify that , TO THE B EST OF YOU R ABILITY,  you or th e office y ou represe nt have te sted the p roduct and  it is con formant wi th 508 req uirements.
  46   06/7/2017
  47   Project/Pr ogram Mana ger’s Sign atureDate
  48  
  49   The VA Sec tion 508 S taff will  acknowledg e receipt  of a compl eted Self- Certificat ion submis sion by si gning (bel ow) and se nding it b ack to the  submitter  listed in  Section 1  above.
  50   Print VA S ection 508  Staff Nam e
  51   VA Section  508 Staff  Signature
  52   Date*Dated  02/12/15  (all other  versions  of this do cument are  obsolete) For furthe r informat ion visit:  http:// DNS