Produced by Araxis Merge on 10/17/2017 1:23:34 PM Central Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.
| # | Location | File | Last Modified |
|---|---|---|---|
| 1 | PSGW_2.3_19.zip\PSGW_2.3_19\docs | EPIP_Test_Evaluation_(PSGW_2.3_19).doc | Tue Oct 17 17:04:50 2017 UTC |
| 2 | PSGW_2.3_19.zip\PSGW_2.3_19\docs | EPIP_Test_Evaluation_(PSGW_2.3_19).doc | Tue Oct 17 17:10:10 2017 UTC |
| Description | Between Files 1 and 2 |
|
|---|---|---|
| Text Blocks | Lines | |
| Unchanged | 4 | 560 |
| Changed | 3 | 6 |
| Inserted | 0 | 0 |
| Removed | 0 | 0 |
| Whitespace | |
|---|---|
| Character case | Differences in character case are significant |
| Line endings | Differences in line endings (CR and LF characters) are ignored |
| CR/LF characters | Not shown in the comparison detail |
No regular expressions were active.
| 1 | Test Evalu ationExist ing Produc t Intake P rogram (EP IP) | |
| 2 | Patch PSGW *2.3*19 | |
| 3 | Test Evalu ation | |
| 4 | ||
| 5 | Department of Vetera ns Affairs | |
| 6 | August 201 7 | |
| 7 | Version 1. 0 | |
| 8 | Revision H istory | |
| 9 | Note: The revision h istory cyc le begins once chang es or enha ncements a re request ed after t he Communi cations Pl an has bee n baseline d. | |
| 10 | DateVersio nDescripti onAuthor08 /17/20171. 0Initial d ocument.EP IP Project TeamArtif act Ration ale | |
| 11 | The test e valuation document i s the prim ary output of the te st and eva luation pr ocess, an integral p art of the systems e ngineering process, which iden tifies lev els of per formance a nd assists the devel oper in co rrecting d eficiencie s. | |
| 12 | Table of C ontents | |
| 13 | 11. | |
| 14 | Test Evalu ation Intr oduction | |
| 15 | ||
| 16 | ||
| 17 | 11.1. | |
| 18 | Test Evalu ation Scop e | |
| 19 | ||
| 20 | ||
| 21 | 11.2. | |
| 22 | Test Archi tecture | |
| 23 | ||
| 24 | ||
| 25 | 11.3. | |
| 26 | Test Envir onment/Con figuration | |
| 27 | ||
| 28 | ||
| 29 | 21.4. | |
| 30 | Installati on Process | |
| 31 | ||
| 32 | ||
| 33 | 22. | |
| 34 | Test Data | |
| 35 | ||
| 36 | ||
| 37 | 23. | |
| 38 | Issues | |
| 39 | ||
| 40 | ||
| 41 | 24. | |
| 42 | Test Execu tion Log | |
| 43 | ||
| 44 | ||
| 45 | 35. | |
| 46 | Test Defec t Log | |
| 47 | ||
| 48 | ||
| 49 | 36. | |
| 50 | Test Resul ts Summary | |
| 51 | ||
| 52 | ||
| 53 | 36.1. | |
| 54 | Defect Sev erity and Priority L evels | |
| 55 | ||
| 56 | ||
| 57 | 46.2. | |
| 58 | Total Defe cts by Sev erity Leve l | |
| 59 | ||
| 60 | ||
| 61 | 46.3. | |
| 62 | Breakdown of Test Re sults | |
| 63 | ||
| 64 | ||
| 65 | 46.4. | |
| 66 | Performanc e Testing | |
| 67 | ||
| 68 | ||
| 69 | 47. | |
| 70 | Test Cover age | |
| 71 | ||
| 72 | ||
| 73 | 47.1. | |
| 74 | Requiremen ts Covered | |
| 75 | ||
| 76 | ||
| 77 | 57.2. | |
| 78 | Section 50 8 Complian ce Coverag e | |
| 79 | ||
| 80 | ||
| 81 | 58. | |
| 82 | Suggested Actions | |
| 83 | ||
| 84 | ||
| 85 | 59. | |
| 86 | Defect Sev erity and Priority D efinitions | |
| 87 | ||
| 88 | ||
| 89 | 59.1. | |
| 90 | Defect Sev erity Leve l | |
| 91 | ||
| 92 | ||
| 93 | 59.1.1. | |
| 94 | Severity L evel 1 – C ritical | |
| 95 | ||
| 96 | ||
| 97 | 69.1.2. | |
| 98 | Severity L evel 2 - H igh | |
| 99 | ||
| 100 | ||
| 101 | 69.1.3. | |
| 102 | Severity L evel 3 - M edium | |
| 103 | ||
| 104 | ||
| 105 | 69.1.4. | |
| 106 | Severity L evel 4 - L ow | |
| 107 | ||
| 108 | ||
| 109 | 79.2. | |
| 110 | Priority C lassificat ions | |
| 111 | ||
| 112 | ||
| 113 | 79.2.1. | |
| 114 | Priority 1 - Resolve Immediate ly | |
| 115 | ||
| 116 | ||
| 117 | 79.2.2. | |
| 118 | Priority 2 - Give Hi gh Attenti on | |
| 119 | ||
| 120 | ||
| 121 | 79.2.3. | |
| 122 | Priority 3 - Normal Queue | |
| 123 | ||
| 124 | ||
| 125 | 79.2.4. | |
| 126 | Priority 4 - Low Pri ority | |
| 127 | ||
| 128 | ||
| 129 | 710. | |
| 130 | Optional T ables, Cha rts, and G raphs | |
| 131 | ||
| 132 | ||
| 133 | 811. | |
| 134 | Document A pproval Si gnatures | |
| 135 | ||
| 136 | ||
| 137 | 9Appendix A - Test E xecution L og | |
| 138 | ||
| 139 | ||
| 140 | 10Appendix B – Defec t Log | |
| 141 | ||
| 142 | ||
| 143 | ||
| 144 | ||
| 145 | Test Evalu ation Intr oduction | |
| 146 | The purpos e of this Test Evalu ation is t o: | |
| 147 | Identify t he testing approach used. | |
| 148 | Present a summary an alysis of the key te st results from the remediatio n of this intake for review an d assessme nt by desi gnated sta keholders. | |
| 149 | Provide a general st atement of the quali ty of the system und er test. | |
| 150 | Make recom mendations for futur e testing efforts. | |
| 151 | Test Evalu ation Scop e | |
| 152 | The scope of this Te st Evaluat ion is to verify the functiona lity of th e Patch PS GW*2.3*19 code modif ication, a s determin ed by Func tional, Co mponent In tegration/ System, an d Regressi on testing . Testing activities followed the specif ications o utlined in the follo wing Maste r Test Pla n: PSGW*2. 3*19 Maste r Test Pla n (include d in Appen dix A). | |
| 153 | Test Archi tecture | |
| 154 | Following are the EP IP test ac counts use d by the L eidos Deve lopment an d SQA Test ing teams to test PS GW*2.3*19. | |
| 155 | Developmen t Test Acc ounts | |
| 156 | (For Unit Testing)SQ A Test Acc ounts | |
| 157 | (For Funct ional, Reg ression, a nd Compone nt Integra tion and S ystem Test ing)VistAS 1 ( altern ate name: D1S1)VistA G1 (altern ate name: D1G1) Vist AS2 (alter nate name: D1S2) – | |
| 158 | for CPRS G UI testing onlyVistA G2 (altern ate name: D1G2) – | |
| 159 | for CPRS G UI testing onlyTest Environmen t/Configur ation | |
| 160 | The EPIP t est accoun ts are mai ntained by the EPIP System Adm inistrator , who inst alls all V A-released patches a s soon as they are n ationally released. All EPIP t est accoun ts are clo ned from e xisting VA Enterpris e Testing Services ( ETS) test accounts. The Comput erized Pat ient Recor d System ( CPRS) Grap hical User Interface (GUI) exe cutable is configure d for each VistA ins tance util izing a un ique Inter net Protoc ol (IP) ad dress to c onnect to the VistA applicatio ns. Any up dates to t he CPRS GU I executab le are han dled by th e EPIP Sys tem Admini strator. | |
| 161 | All EPIP T est Engine ers and De velopers w ho have th e proper c redentials can acces s the test accounts. The VA Au stin Infor mation Tec hnology Ce nter (AITC ) support team reset s password s and sets up new ac cess crede ntials on an as-need ed basis. | |
| 162 | Installati on Process | |
| 163 | As soon as the remed iation pro cess is co mplete and the patch is availa ble for te sting, a K IDS build is created in the De velopment account an d then sen t to FORUM for final packaging . The patc h is then submitted to the VA SQA Lead’s Mailman a ccount for installat ion. | |
| 164 | An EPIP De veloper or Test Engi neer utili zes the KI DS Install ation proc ess to ext ract the b uild from the patch and instal l the buil d into a t est accoun t. The ind ividual wh o installs the patch verifies the routin e checksum s and also checks fo r errors d uring the installati on process . If the p atch is su ccessfully installed without a ny errors, then the EPIP Test team proce eds with F unctional, Regressio n, and Com ponent Int egration a nd System testing. I f defects are found, then the Developmen t team wor ks to find a resolut ion and cr eates new versions o f the patc h until al l defects are resolv ed. | |
| 165 | Test Data | |
| 166 | The SQA Te sting team utilizes the test d ata in the designate d test acc ounts (D1G 1, D1G2). | |
| 167 | The test d ata is enc rypted fol lowing the standards set forth by the VA Office of Informati on & Techn ology (OI& T). All Pe rsonally I dentifiabl e Informat ion (PII) and Protec ted Health Informati on (PHI) i s scrubbed and is no t availabl e to the T est Engine ers. | |
| 168 | All testin g is execu ted using encrypted test patie nts availa ble from a ny of the EPIP test accounts. Examples o f encrypte d test pat ients: | |
| 169 | AAAHURMMX, XPHY | |
| 170 | BADHB, HAA DXS | |
| 171 | FDHUX, YHI J | |
| 172 | All tests were execu ted manual ly by EPIP Test Engi neers. | |
| 173 | Issues | |
| 174 | The follow ing issues were enco untered du ring testi ng of PSGW *2.3*19. | |
| 175 | TitleIssue Descripti onTypeSeve rityN/AN/A N/AN/ATest Execution Log | |
| 176 | The Test E xecution L og records the execu tion of te st scripts and docum ents the t est result s for each test scri pt. | |
| 177 | The SQA Te sting team utilizes the Ration al Quality Managemen t (QM) too l for all testing ac tivities. All test d ocuments a re stored in the EPI P reposito ry, includ ing the Ma ster Test Plan, Test Suites, T est Cases, and Test Scripts. T est execut ion is per formed, an d test res ults recor ded, in Ra tional QM. The Test Engineer a dds the te st results to the Te st Executi on records to indica te whether testing a chieved Pa ss or Fail status. | |
| 178 | The Test E xecution r ecords for PSGW*2.3* 19 are inc luded in t he EPIP Pa tch PSGW*2 .3*19 Mast er Test Pl an. The Ma ster Test Plan is av ailable in Appendix A. | |
| 179 | Test Defec t Log | |
| 180 | The Test D efect Log is a tool for record ing, analy zing, trac king, and documentin g the clos ure of def ects. It s pecifies t he screen, field, be havior or result tha t occurred , and the IEEE-defin ed Severit y Level. I t includes enough in formation for the de veloper to find and re-create the defect . The Defe ct Log is available in Appendi x B. | |
| 181 | Test Resul ts Summary | |
| 182 | SQA testin g for this intake st arted in t he Dev1 Go ld1 test e nvironment on July 2 0, 2017 an d ended on August 16 , 2017. | |
| 183 | Test versi on 1 was i nstalled i n the Dev1 Gold1 tes t environm ent after Unit testi ng in Dev1 Silver1 w as complet ed. Upon c ompletion of Integra tion testi ng (Compon ent Integr ation and System Tes ting, Func tional Tes ting, and Regression Testing), one (1) d efect was found and reported. | |
| 184 | Test versi on 2 was i nstalled i n the Dev1 Gold1 tes t environm ent on Jul y 21, 2017 after Uni t testing in Dev1 Si lver1 was completed. This vers ion correc ted an iss ue with th e on/off s witch para meter bein g set to n ull and tw o typos in the displ ay. Upon c ompletion of Functio nal Testin g, one (1) defect wa s found an d reported . | |
| 185 | Test versi on 3 was i nstalled i n the Dev1 Gold1 tes t environm ent on Jul y 25, 2017 after Uni t testing in Dev1 Si lver1 was completed. This vers ion correc ted the is sue that t he changes made in t he previou s test ver sion were not propag ated to FO RUM. Upon completion of Functi onal Testi ng, one (1 ) defect w as found a nd reporte d. | |
| 186 | Test versi on 4 was i nstalled i n the Dev1 Gold1 tes t environm ent on Aug ust 7, 201 7 after Un it testing in Dev1 S ilver1 was completed . This ver sion corre cted two i ssues rela ted to nur ses’ order ing items. Upon comp letion of Integratio n testing (Component Integrati on and Sys tem Testin g, Functio nal Testin g, and Reg ression Te sting), ze ro (0) def ects were found and reported. During an internal d emonstrati on, a conf lict with a patch in stalled in to the tes t environm ent after testing wa s complete d was disc overed. On e (1) defe ct was rep orted. | |
| 187 | Test versi on 5 was i nstalled i n the Dev1 Gold1 tes t environm ent on Aug ust 15, 20 17 after U nit testin g in Dev1 Silver1 wa s complete d. This ve rsion corr ected an i ssue with the Stock Level not displaying in the On Demand Re port by Da te/AOU. Up on complet ion of Int egration t esting (Co mponent In tegration and System Testing, Functional Testing, and Regres sion Testi ng), zero (0) defect s were fou nd and rep orted. | |
| 188 | Defect Sev erity and Priority L evels | |
| 189 | A defect i s defined as a flaw in a compo nent or sy stem that can cause the compon ent or sys tem to fai l to perfo rm its req uired func tion, e.g. , an incor rect state ment or da ta definit ion. A def ect, if en countered during exe cution, ma y cause a failure of the compo nent or sy stem. | |
| 190 | Defects ar e categori zed accord ing to sev erity and priority l evels. The test anal yst assign s the seve rity, whil e the deve lopment ma nager assi gns the pr iority for repair. F or more in formation, see Defec t Severity and Prior ity Defini tion in th is Test Ev aluation. | |
| 191 | Total Defe cts by Sev erity Leve l | |
| 192 | The Defect Log in Ap pendix B d isplays th e defects encountere d while te sting this patch, an d the seve rity level of each. | |
| 193 | Breakdown of Test Re sults | |
| 194 | Testing wa s complete d on Augus t 16, 2017 . All test results w ere record ed in Rati onal QM. D etailed re sults are available in the EPI P Patch PS GW*2.3*19 Master Tes t Plan (se e Appendix A). | |
| 195 | Performanc e Testing | |
| 196 | Performanc e testing was not co nducted. | |
| 197 | Test Cover age | |
| 198 | The EPIP P atch PSGW* 2.3*19 Mas ter Test P lan contai ns details on test c overage (s ee Appendi x A). | |
| 199 | Requiremen ts Covered | |
| 200 | The requir ements for PSGW*2.3* 19 are sto red in the Rational Requiremen ts Managem ent (RM) a pplication . The test cases sto red in Rat ional Qual ity Manage ment (QM) are used t o validate that the requiremen ts have be en address ed, provid ing full t raceabilit y. The use r stories stored in Rational C onfigurati on Managem ent (CM) a re linked to the req uirements in RM and test cases in QM. | |
| 201 | The follow ing links provide ac cess to th e various ARWS repos itories in the Ratio nal toolki t. If link translati on issues prevent di rect acces s, copy an d paste th e URLs int o your bro wser. | |
| 202 | ARWS (RM) – Go to Ar tifacts, t hen Browse Artifacts . Locate t he EPIP fo lder on th e left sid e of the p age and ex pand it to display p atch folde rs. Each p atch folde r contains the requi rements fo r the patc h number s hown in th e folder n ame. | |
| 203 | https://cl m.rational .oit. DNS /rm/web#ac tion=com.i bm.rdm.web .pages.sho wFoundatio nProjectDa shboard&pr ojectURI=h ttps%3A%2F %2Fclm.rat ional.oit. DNS %2Frm%2Fpr ocess%2Fpr oject-area s%2F_cOYOU XtkEea6E-3 s3yro6A&vv c.configur ation=http s%3A%2F%2F clm.ration al.oit. DNS %2Frm%2Fcm %2Fstream% 2F_c9605nt kEea6E-3s3 yro6A | |
| 204 | ARWS (QM) – Go to Pl anning, th en Browse Test Plans , and then search fo r the Mast er Test Pl an you nee d. The Mas ter Test P lan and te st cases a re linked to require ments. | |
| 205 | https://cl m.rational .oit. DNS /qm/web/co nsole/ARWS %20(QM)#ac tion=com.i bm.rqm.pla nning.home .actionDis patcher&su bAction=vi ewUserHome | |
| 206 | ARWS (CM) – Go to Pl ans, then All Plans, and then search for the Sprin t Plan you need. The user stor ies in eac h Plan are linked to requireme nts and te st cases. | |
| 207 | https://cl m.rational .oit. DNS /ccm/web/p rojects/AR WS%20(CM)# action=com .ibm.team. dashboard. viewDashbo ard | |
| 208 | Section 50 8 Complian ce Coverag e | |
| 209 | Section 50 8 test res ults will be reporte d to VA in the follo wing docum ents: | |
| 210 | EPIP_VASec tion508_Co mpliance_T est_Result s_(PSGW*2. 3*19) | |
| 211 | EPIP_VASec tion508_Co nformance_ Validation _Statement _( PSGW*2. 3*19) | |
| 212 | EPIP_VASec tion508_Se lf-Certifi cation_Doc ument_(PSG W*2.3*19) | |
| 213 | EPIP_VASec tion508_Ve rifiable_O bjective_E vidence_( PSGW*2.3*1 9) | |
| 214 | Suggested Actions | |
| 215 | Leidos rec ommends mo ving this patch to I OC testing . | |
| 216 | Defect Sev erity and Priority D efinitions | |
| 217 | The classi fication o f defects within a s ystem exam ines both the severi ty and pri ority of t he defect. | |
| 218 | Severity i s a measur e of how g reat the i mpact is o n the user ’s ability to comple te the doc umented ac tions with in the sys tem. | |
| 219 | Priority d etermines the speed with which a given d efect must be repair ed. | |
| 220 | Defect cla ssificatio n may be d etermined either bec ause testi ng is dela yed by a f ailure in the system or becaus e a cumber some worka round prev ents a use r from com pleting th e assigned tasks. Bo th severit y and prio rity measu res must b e recorded when sche duling def ect resolu tion tasks . | |
| 221 | Defect Sev erity Leve l | |
| 222 | The follow ing subsec tions iden tify the d efect seve rity level s. | |
| 223 | Severity L evel 1 – C ritical | |
| 224 | Institute of Electri cal and El ectronics Engineers (IEEE) def inition: T he defect results in the failu re of the complete s oftware sy stem, of a subsystem , or of a software u nit (progr am or modu le) within the syste m. | |
| 225 | Any defect that comp romises pa tient safe ty or syst em securit y. Example s of syste m security defects i nclude bre ach of con fidentiali ty require ments of t he Privacy Act, the Health Ins urance Por tability a nd Account ability Ac t (HIPAA), or Federa l Tax Info rmation gu idelines. | |
| 226 | Loss of sy stem funct ionality c ritical to user oper ations wit h no suita ble workar ound, i.e. , there is no way to achieve t he expecte d results using the applicatio n. | |
| 227 | System cra sh or hang that prev ents furth er testing or operat ion of the complete applicatio n or a sec tion of th e applicat ion. | |
| 228 | Any defect that caus es corrupt ion of dat a from a r esult of t he system (as oppose d to user error). | |
| 229 | Any defect in which inappropri ate transm issions ar e consiste ntly gener ated or ap propriate transmissi ons of HL7 messages fail to be generated . | |
| 230 | Loss of fu nctionalit y resultin g in erron eous eligi bility/enr ollment de terminatio ns or comm unications not being sent. | |
| 231 | Severity L evel 2 - H igh | |
| 232 | IEEE defin ition: The defect re sults in t he failure of the co mplete sof tware syst em, of a s ubsystem, or of a so ftware uni t (program or module ) within t he system. There is no way to make the f ailed comp onent(s) f unction. H owever, th ere are ac ceptable p rocessing alternativ es which w ill yield the desire d result. | |
| 233 | A major de fect in th e function ality that does not result in corruption of data. | |
| 234 | A major de fect in th e function ality resu lting in a failure o f all or p art of the applicati on, where: | |
| 235 | The expect ed results can tempo rarily be achieved b y alternat e means. T he custome r indicate s the work around is acceptabl e for the short term . | |
| 236 | Any defect that does not confo rm to Sect ion 508 st andards. | |
| 237 | Any defect that resu lts in ina ccurate or missing r equirement s. | |
| 238 | Any defect that resu lts in inv alid authe ntication or authent ication of an invali d end user . | |
| 239 | Severity L evel 3 - M edium | |
| 240 | IEEE defin ition: The defect do es not res ult in a f ailure, bu t causes t he system to produce incorrect , incomple te, or inc onsistent results, o r the defe ct impairs the syste ms usabili ty. | |
| 241 | Minor func tionality is not wor king as in tended and a workaro und exists but is no t suitable for long term use | |
| 242 | The inabil ity of a v alid user to access the system consisten t with gra nted privi leges | |
| 243 | Typographi cal or gra mmatical e rrors in t he applica tion, incl uding inst allation g uides, use r guides, training m anuals, an d design d ocuments | |
| 244 | Any defect producing cryptic, incorrect, or inappr opriate er ror messag es | |
| 245 | Any defect that resu lts from t he use of non-standa rd data te rminology in the app lication o r document ation, as defined by the Depar tment of V eterans Af fairs | |
| 246 | Cosmetic i ssues that are impor tant to th e integrit y of the p roduct, bu t do not r esult in d ata entry and or dat a quality problems. | |
| 247 | Severity L evel 4 - L ow | |
| 248 | IEEE defin ition: The defect do es not cau se a failu re, does n ot impair usability, and the d esired pro cessing re sults are easily obt ained by w orking aro und the de fect. | |
| 249 | Minor loss of, or de fect in th e function ality wher e a long t erm use ex ists | |
| 250 | Low-level cosmetic i ssues. | |
| 251 | Priority C lassificat ions | |
| 252 | The follow ing subsec tions iden tify the a ppropriate actions f or defects at each p riority le vel, per d efinitions of IEEE. | |
| 253 | Priority 1 - Resolve Immediate ly | |
| 254 | Further de velopment and/or tes ting canno t occur un til the de fect has b een repair ed. The sy stem canno t be used until the repair has been affe cted. | |
| 255 | Priority 2 - Give Hi gh Attenti on | |
| 256 | The defect must be r esolved as soon as p ossible be cause it i s impairin g developm ent and/or testing a ctivities. System us e will be severely a ffected un til the de fect is fi xed. | |
| 257 | Priority 3 - Normal Queue | |
| 258 | The defect should be resolved in the nor mal course of develo pment acti vities. It can wait until a ne w build or version i s created. | |
| 259 | Priority 4 - Low Pri ority | |
| 260 | The defect is an irr itant that should be repaired, but can b e repaired after mor e serious defects ha ve been fi xed. | |
| 261 | Optional T ables, Cha rts, and G raphs | |
| 262 | None. | |
| 263 | Document A pproval Si gnatures | |
| 264 | Signed: __ __________ __________ __________ __________ __________ __________ _________ | |
| 265 | Program/Pr oject Mana ger | |
| 266 | Date | |
| 267 | Signed: __ __________ __________ __________ __________ __________ __________ _________ | |
| 268 | Business S ponsor Rep resentativ e | |
| 269 | Date | |
| 270 | Signed: __ __________ __________ __________ __________ __________ __________ _________ | |
| 271 | Test Lead | |
| 272 | Date | |
| 273 | Appendix A - Test Ex ecution Lo g | |
| 274 | The Test E xecution R ecords for PSGW*2.3* 19 are inc luded in t he EPIP Pa tch PSGW*2 .3*19 Mast er Test Pl an. | |
| 275 | ||
| 276 | Appendix B – Defect Log | |
| 277 | Four (4) d efects wer e found du ring testi ng of PSGW *2.3*19. A ll defects have been resolved. | |
| 278 | Defect IDA ffected Sc reenAffect ed FieldOb served Beh aviorSever ityDescrip tionN/AN/A N/AN/AN/AN o defects were found during Un it Testing of versio n 1.N/AN/A N/AN/AN/AN o defects were found during Co mponent In tegration/ Systems Te sting of v ersion 1.N /AN/AN/AN/ AN/ANo def ects were found duri ng Regress ion testin g of versi on 1.56337 7Edit Para meter Valu esWS_LVL_O N Paramete rIssue 1) The parame ter WS_LVL _ON should be OFF by default w hen instal led; as of now it is NULL. The options Y ES or NO a re also no t being di splayed. | |
| 279 | Issue 2) T ypo ? at W ARD STOCK LEVEL: | |
| 280 | Issue 3) T ypo ?? at WARD STOCK LEVEL: Pl ease fix t he text he re.LowOne defect was found dur ing Functi onal Testi ng of vers ion 1.N/AN /AN/AN/AN/ ANo defect s were fou nd during Unit Testi ng of vers ion 2.5624 92N/AN/ATh e changes that were supposed t o be refle cted in Ve rsion 2 we re not pro pagated to FORUM.Med iumOne def ect was fo und during Functiona l Testing of version 2.N/AN/AN /AN/AN/ANo defects w ere found during Uni t Testing of version 3.566638E nter/Edit Nurses' On -Demand Re quest | |
| 281 | ON-DEMAND QUANTITYIs sue 1) Nur ses’ order s with NUL L for the requested quantity a re printed in the Ph armacists On Demand report. | |
| 282 | Issue 2) W hile nurse is enteri ng orders, if for so me reason the nurse abruptly q uits after a few ite ms using ^ , the comp leted item s are not being sent to the ph armacist’s printer. The print code is no t being re ached sinc e the exit was abrup t.MediumOn e defect w as found d uring Func tional Tes ting of ve rsion 3.N/ AN/AN/AN/A N/ANo defe cts were f ound durin g Unit Tes ting of ve rsion 4.N/ AN/AN/AN/A N/ANo defe cts were f ound durin g Componen t Integrat ion/System s Testing of version 4.N/AN/AN /AN/AN/ANo defects w ere found during Reg ression te sting of v ersion 4.N /AN/AN/AN/ AN/ANo def ects were found duri ng Functio nal Testin g of versi on 4.Defec t ID 57316 9 was logg ed for an issue that was not f ound durin g initial testing, b ut discove red after another pa tch (PSGW* 2.3*18) wa s installe d in the t est enviro nment. Sto ck Level w as not bei ng display ed in the Print an O n Demand R eport by D ate/AOU du e to the i nstallatio n of that patch.N/AN /AN/AN/AN/ ANo defect s were fou nd during Unit Testi ng of vers ion 5.N/AN /AN/AN/AN/ ANo defect s were fou nd during Component Integratio n/Systems Testing of version 5 .N/AN/AN/A N/AN/ANo d efects wer e found du ring Regre ssion test ing of ver sion 5.N/A N/AN/AN/A N/ANo defe cts were f ound durin g Function al Testing of versio n 5. | |
| 283 | _156974703 0.pdf |
Araxis Merge (but not the data content of this report) is Copyright © 1993-2016 Araxis Ltd (www.araxis.com). All rights reserved.