6. EPMO Open Source Coordination Office Redaction File Detail Report

Produced by Araxis Merge on 2/19/2018 2:07:35 PM Eastern Standard Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.

6.1 Files compared

# Location File Last Modified
1 OneVA_Pharmacy_CAS_MPDU_Build-2_CIF_Package.zip\OneVA_Pharmacy_CAS_MPDU_Build-2_CIF_Package\OneVA_Pharmacy_CAS_MPDU_Build-2_Documentation OneVA_Pharmacy_CAS_MPDU_VistA_Patch_Build_Procedure.docx Fri Jan 19 04:34:53 2018 UTC
2 OneVA_Pharmacy_CAS_MPDU_Build-2_CIF_Package.zip\OneVA_Pharmacy_CAS_MPDU_Build-2_CIF_Package\OneVA_Pharmacy_CAS_MPDU_Build-2_Documentation OneVA_Pharmacy_CAS_MPDU_VistA_Patch_Build_Procedure.docx Fri Feb 16 20:47:31 2018 UTC

6.2 Comparison summary

Description Between
Files 1 and 2
Text Blocks Lines
Unchanged 1 168
Changed 0 0
Inserted 0 0
Removed 0 0

6.3 Comparison options

Whitespace
Character case Differences in character case are significant
Line endings Differences in line endings (CR and LF characters) are ignored
CR/LF characters Not shown in the comparison detail

6.4 Active regular expressions

No regular expressions were active.

6.5 Comparison detail

  1   U. S. Depa rtment of  Veterans A ffairs
  2   OneVA Phar macy
  3   Clinical A ncillary S ervices (C AS)
  4   Medication  Permissio ns and Dis pensing Up grades (MP DU)
  5   VistA Patc h Build Pr ocedure
  6  
  7   Contract N o: VA118-1 6-D-1009
  8   Task Order : VA11817F 10090006
  9  
  10   January 20 18
  11   Version 1. 1
  12   Revision H istory
  13   Date
  14   Revision
  15   Descriptio n
  16   Author
  17   10/16/2017
  18   1.0
  19   Initial Ve rsion
  20   Joseph A.  McGovern
  21   01/18/2018
  22   1.1
  23   CAS MPDU B uild-2
  24   Joseph A.  McGovern
  25  
  26   Table of C ontents
  27   1Purpose2
  28   2Software  Scope2
  29   2.1Base an d Optional  Tasks3
  30   2.2Develop ment Envir onment3
  31   3VistA Pat ch Build P rocedure3
  32   4Release M anagement3
  33  
  34  
  35  
  36  
  37  
  38  
  39  
  40  
  41  
  42  
  43  
  44  
  45  
  46  
  47  
  48  
  49  
  50  
  51  
  52  
  53  
  54  
  55   Purpose 
  56   Agile best  practices  will be i mplemented  for Clini cal Ancill ary Servic es (CAS) M PDU develo pment buil d planning  and execu tion iaw u sing the V eteran-Foc used Integ ration Pro cess (VIP)  and the V IP Release  process g uide.  Agi le develop ment will  plan each  build to b e three (3 ) months i n duration  and shall  be made u p (3) week  sprints.  The CAS MP DU Project  Manager,  Software M anager and  software  lead will  review and  determine  the epics  and user  stories th at should  become par t of the b uild with  the VA PM  and reques t the VA B usiness Ow ners’ conc urrence.
  57   The functi onal desig n will be  iaw with t he OneVA P harmacy Im plementati on SDD V3. 1.  The    Technical  approach w ill be iaw  the PSD*3 , PSO*7, P SS*1 and X U*8 Techni cal Manual s with CAS  MPDU proj ect relate d updates  and throug h requirem ents analy sis, elabo ration and  collabora tion with  customer s takeholder s.
  58   Configurat ion Manage ment (CM),  source co de control , change/d efect mana gement, bu ild packag e and rele ase of sof tware; and  document  repository  will be m anaged in  the VA Jaz z Rational  tool set.    Configu ration sta tus and me tric repor ts will be  produced  as part of  the Agile  developme nt process  facilitat ed by the  tool set.   CM proces ses, pract ices and R ational to ol usage i s detailed  in the CA S MPDU Con figuration  Managemen t Plan.
  59  
  60   Software S cope  
  61   The CAS MP DU project  has been  scheduled  to deliver  3 builds  for Medica tion Permi ssions and  Dispensin g Upgrades  MPDU for  the contra ct base pe riod of pe rformance.  There is  follow Opt ional Task  1 for MPD U. 
  62  
  63   Base and O ptional Ta sks
  64   Base Tasks  for CAS M PDU:
  65   Build 1 -  Post-EPCS/ Process Rx  for Suppl y Enhancem ents.
  66   Build 2 -  Medication  Route Sel ection Enh ancement
  67   Build 3 -  Terminated  Provider  Validation  and OneVA  Efficienc ies, 
  68                                  L ocal Presc ription Fi lls Enhanc ements
  69  
  70   Developmen t Environm ent
  71   The AITC E DE EPIP va ausovpappd ev1 and AI TC EDE Vip appdev3 ar e being ev aluated an d consider ed for dev elopment e nvironment s.  Curren tly the CH YSHR and D AYTSHR env ironments  are availa ble for pr eliminary  testing on ce the con figuration  and Patch  levels ar e verified . These en vironments  in conjun ction with  the VA En terprise R ational to ols for th e CAS MPDU  project w ill suppor t Agile so ftware dev elopment.  Base confi guration c onsists of  the follo wing: 
  72   Eclipse v3 .2;
  73   Jazz Ratio nal v6.0.1 ;
  74   Red Hat En terprise L inux;
  75   VistAPSO*7 *454, PSO* 7*475, PSO *7*479; PS O*7*488, P SO*7*497,  PSS*1*212
  76   Cache Data base v2014 .1.3.
  77  
  78   VistA Patc h Build Pr ocedure
  79    All Vista  builds ar e created  through th e Kernel I nstallatio n Distribu tion Syste m (KIDS) o ption in V istA.
  80  
  81   VistA buil d informat ion can be  obtained  through th e Vista Do cumentatio n Library  (VDL), Ker nel Develo per's Guid e.  Sectio n 15.2
  82  
  83   4Release M anagement
  84   A CAS MPDU  software  release is  a way of  identifyin g the exac t version  of all sou rce code a nd objects  that comp rise a mod ified appl ication at  a certain  point in  time. A CA S MPDU sof tware rele ase is the  distribut ion of the  baseline  or applica tion modif ications t o the base line. A re lease is c omprised o f one or m ore applic ation or d ocumentati on modific ations aut horized fo r the impl ementation /correctio n issued b y change r equests. D istributio n of a CAS  MPDU rele ase is del ivered wit h a VDD.