Produced by Araxis Merge on 2/19/2018 2:07:24 PM Eastern Standard Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.
| # | Location | File | Last Modified |
|---|---|---|---|
| 1 | OneVA_Pharmacy_CAS_MPDU_Build-2_CIF_Package.zip\OneVA_Pharmacy_CAS_MPDU_Build-2_CIF_Package\CAS MPDU_Build-2_Checklists | open_source_submission_checklist - OneVA Pharmacy CAS MPDU_Build_2.xlsx | Tue Jan 23 14:53:22 2018 UTC |
| 2 | OneVA_Pharmacy_CAS_MPDU_Build-2_CIF_Package.zip\OneVA_Pharmacy_CAS_MPDU_Build-2_CIF_Package\CAS MPDU_Build-2_Checklists | open_source_submission_checklist - OneVA Pharmacy CAS MPDU_Build_2.xlsx | Thu Feb 15 20:28:46 2018 UTC |
| Description | Between Files 1 and 2 |
|
|---|---|---|
| Text Blocks | Lines | |
| Unchanged | 4 | 236 |
| Changed | 4 | 8 |
| Inserted | 0 | 0 |
| Removed | 0 | 0 |
| Whitespace | |
|---|---|
| Character case | Differences in character case are significant |
| Line endings | Differences in line endings (CR and LF characters) are ignored |
| CR/LF characters | Not shown in the comparison detail |
No regular expressions were active.
| 1 | SHEET: Cov er | |
| 2 | Department of Vetera ns Affairs , | |
| 3 | ||
| 4 | Open Sourc e Submissi on Checkli st, | |
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| 11 | ||
| 12 | ||
| 13 | ||
| 14 | ||
| 15 | ||
| 16 | ||
| 17 | ||
| 18 | ||
| 19 | June 2013, | |
| 20 | ||
| 21 | ||
| 22 | Version 3. 0 , | |
| 23 | This docum ent contai ns a parag raph style called In structiona l Text. Te xt using t his paragr aph , | |
| 24 | style is d esigned to assist th e reader i n completi ng the doc ument. Tex t in parag raphs adde d , | |
| 25 | after this help text is automa tically se t to the a ppropriate body text level. Fo r best res ults and, | |
| 26 | to mainta in formatt ing consis tency, use the provi ded paragr aphs style s. , | |
| 27 | ||
| 28 | Delete all instructi onal text before dis tributing the docume nt., | |
| 29 | ||
| 30 | ||
| 31 | SHEET: Rev ision Hist ory | |
| 32 | ||
| 33 | Revision H istory, | |
| 34 | Date,Versi on,Descrip tion,Autho r, | |
| 35 | August 201 4,4,Added statement in Checkli st questio n 6 regard ing review of copyri ghts and l icensed co ntent prov ided to OS CTM. Revis ed Introdu ction to r efer to OS CTM and ad ded ampers and to OI& T.,Process Managemen t, | |
| 36 | June 2013, 3,Updated the link t o the Open Source Po rtal to st art with " https://" ,Process M anagement, | |
| 37 | April 2013 ,2,Due to PMAS artif act consol idation ef forts, mod ified the list of th e required artifact to be subm itted to PD Open So urce, Conf iguration & Tools Ma nagement D ivision. CONOPS and OCD were removed fr om the lis t, and are consolida ted into o ther artif acts.,Proc ess Manage ment, | |
| 38 | September 2012,1,Ini tial docum ent,Proces s Manageme nt, | |
| 39 | ||
| 40 | Place late st revisio ns at top of table., | |
| 41 | ||
| 42 | ||
| 43 | ||
| 44 | SHEET: Int roduction | |
| 45 | Open Sourc e Submissi on Checkli st, | |
| 46 | The Open S ource Subm ission Che cklist des cribes whi ch artifac ts and sys tem builds are to be submitted to the OI &T Product Developme nt Open So urce, Conf iguration and Tools (OSCTM) Ma nagement D ivision Of fice and at which i ntervals o r mileston es. As pr oject mana gers are d eveloping their proj ect plan, providing code and a rtifacts t o OSCTM mu st be cons idered bas ed on both specific milestones and/or a time inter val basis, along with the requi rement tha t both art ifacts and software builds wil l require redaction of certain content i n order to share the content w ith a non- VA audienc e. | |
| 47 | ||
| 48 | Software p rojects un der develo pment will be releas ed to the open sourc e communit y multiple times dur ing their software d evelopment lifecycle as they g row from r equirement s to conce ptual desi gn to prot otype or i nitial cod ing, to fi nal delive ry. Deliv ery of cod e and proj ect artifa cts are ex pected to be cyclica l as the p roject inc reases del ivered fun ctionality and matur es towards stable an d final re lease of c ustomer-fo cused deli verables. OI&T reali zes that e arly relea ses will b e untested , in draft format, a nd incompl ete in nat ure and wi ll carry a disclaime r that wil l position VA to rel ease to op en source to be eval uated or u sed at the users’inh erited ris k. | |
| 49 | ||
| 50 | Required s ubmission points in the Pro-Pa th Process are as fo llows: | |
| 51 | , | |
| 52 | Process,Ac tivity,Act ivity Name , | |
| 53 | Project Pl anning,PRP -PR1,Condu ct Peer Re view of Re quirements Specifica tion Docum ent, | |
| 54 | PRP-FR1,Co nduct Form al Review of Require ments Spec ification Document , | |
| 55 | PRP-PR2,Co nduct Peer Review of System De sign Docum ent , | |
| 56 | PRP-FR2,Co nduct Form al Review of System Design Doc ument , | |
| 57 | Product De sign,DES-4 .2,Design Logical Da tabase, | |
| 58 | DES-4.5,Do cument Dat abase Desi gn, | |
| 59 | Product Bu ild,BLD-10 ,Provide t o Open Sou rce, | |
| 60 | Test Prepa ration,TST -7,Provide to Open S ource, | |
| 61 | Independen t Test and Evaluatio n,ITE-4,Pr ovide to O pen Source , | |
| 62 | In an effo rt to shar e software and docum entation e arly and o ften with the open s ource comm unity, thi s checklis t is to be used by a ll develop ment proje cts to sub mit docume ntation an d software to OSCTM for public ation out to the ope n source c ommunity. | |
| 63 | ||
| 64 | The goal i s to poten tially obt ain feedba ck or assi stance whe re the ope n source c ommunity h as familia rity with the techno logy/desig n or with the functi ons/featur es to prod uce or has resources to supple ment or pa rtner with VA effort s. | |
| 65 | ||
| 66 | The object ive is to share curr ent VA pro duct line enhancemen t plans in sharing a ll under d evelopment code and artifacts (pre PMAS Milestone 2) with th e open sou rce commun ity as the y are made available . | |
| 67 | ||
| 68 | The discri minator is to releas e software BEFORE it is in a f inal deliv ered state so the in teraction with the o pen source community can be an effective partnersh ip for bot h the VA a nd interes ted partie s in the o pen source community who have vested int erest in o ur project plans and delivered capabilit ies. , | |
| 69 | For more i nformation about the VA OI&T O pen Source initiativ e please v isit us on line at:, | |
| 70 | https:// :PORT /sites/Ope nSource/Si tePages/Ho me.aspx, | |
| 71 | ||
| 72 | ||
| 73 | ||
| 74 | ||
| 75 | ||
| 76 | ||
| 77 | ||
| 78 | SHEET: Che cklist | |
| 79 | Please com plete the questions in the tab le below a nd submit to PII , | |
| 80 | Project In formation, | |
| 81 | Project EP S Number:, 08-03-02-0 3-01-005, | |
| 82 | VA Project Name:,Cli nical Anci llary Serv ices (CAS) MPDU, | |
| 83 | Version:,P atch Relea se, | |
| 84 | Iteration Number:,Bu ild-2, | |
| 85 | Projected Release to Customer Date:,23-F eb-18, | |
| 86 | VISTA Patc h Module D esignation :,PSD*3*83 , PSO*7*50 5, PSS*1*2 19, XU_8_6 89, | |
| 87 | Build Numb er(s) (if different from Patch Number or multiple builds are being pro vided): , | |
| 88 | Custodial Product(s) :,None, | |
| 89 | ||
| 90 | Checklist Question, | |
| 91 | 1. For whi ch ProPath process s tep are yo u providin g this sub mission fo r? Require d submissi on points for softwa re are pro vided. ,UA T Test Pre paration ( TST), | |
| 92 | 2. Is this is a foll ow up to a previous submission (e.g. an updated ar tifact pre viously su bmitted)?, No, | |
| 93 | 3. Which m ilestone d id the pro ject most recently p ass throug h?,Increme nt-1 CD#1, | |
| 94 | 3(a). If t his is a M ilestone S ubmission, which Mil estone are you submi tting for? , | |
| 95 | N/A, | |
| 96 | ||
| 97 | 4. Is this submissio n for docu mentation or softwar e or both? ,Documenta tion and S oftware, | |
| 98 | 0002AC One VA Pharmac y Implemen tation SDD V3.2_2017 0630.docx, | |
| 99 | CAS_MPDU _Build_2_R equirement s_User_Sto ries, | |
| 100 | ||
| 101 | 6. If this submissio n is for a product b uild or so ftware, pl ease list the conten ts of the submission . For a so ftware sub mission, t he items i dentified to the rig ht, at a m inimum, ar e required : (NOTE - For all th e identifi ed and/or known copy rights in the submis sion being delivered , the proj ect team n eeds to te ll us whet her VA wil l violate any licens e or copyr ights or r edistribut ion constr aints if V A were to share (out side of th e VA) the source cod e and/or d erivative works that VA may ha ve created that the project su bmitted.), 0001AK_CAS _MPDU_Vers ion_Descri ption_Docu ment_20171 212, | |
| 102 | Product Bu ild:, | |
| 103 | o Patch Descriptio n, | |
| 104 | o Forum Patch Rele ase, | |
| 105 | CAS MPDU B uild-2 Tes t Cases, | |
| 106 | , | |
| 107 | , | |
| 108 | Reference PSD*3*83, PSO*7*505, PSS*1*219 , XU_8_689 , | |
| 109 | Additional Informati on, | |
| 110 | ||
| 111 | For more informatio n about th e VA OIT O pen Source initiativ e please v isit us on line at:, | |
| 112 | https:// :PORT /sites/Ope nSource/Si tePages/Ho me.aspx, | |
| 113 | ||
| 114 | ||
| 115 | ||
| 116 | ||
| 117 | ||
| 118 | ||
| 119 | ||
| 120 | ||
| 121 | ||
| 122 |
Araxis Merge (but not the data content of this report) is Copyright © 1993-2016 Araxis Ltd (www.araxis.com). All rights reserved.