1. EPMO Open Source Coordination Office Redaction File Detail Report

Produced by Araxis Merge on 10/24/2017 8:44:06 AM Central Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.

1.1 Files compared

# Location File Last Modified
1 OneVA_Pharmacy_CAS_MPDU_Build-1_CIF_Package.zip\OneVA_Pharmacy_CAS_MPDU_Build-1_CIF_Package\Documentation VistA_Patch_Build_Procedure.doc Tue Oct 24 13:03:16 2017 UTC
2 OneVA_Pharmacy_CAS_MPDU_Build-1_CIF_Package.zip\OneVA_Pharmacy_CAS_MPDU_Build-1_CIF_Package\Documentation VistA_Patch_Build_Procedure.doc Tue Oct 24 13:24:15 2017 UTC

1.2 Comparison summary

Description Between
Files 1 and 2
Text Blocks Lines
Unchanged 9 96
Changed 8 34
Inserted 0 0
Removed 0 0

1.3 Comparison options

Whitespace
Character case Differences in character case are significant
Line endings Differences in line endings (CR and LF characters) are ignored
CR/LF characters Not shown in the comparison detail

1.4 Active regular expressions

No regular expressions were active.

1.5 Comparison detail

  1   Configurat ion Manage ment PlanC ontract No : VA118-16 -D-1009  
  2  
  3  
  4   Task Order : VA11817F 10090006 
  5   U. S. Depa rtment of  Veterans A ffairs
  6   OneVA Phar macy
  7   Clinical A ncillary S ervices (C AS)
  8   Medication  Permissio ns and Dis pensing Up grades (MP DU)
  9   VistA Patc h Build Pr ocedure
  10  
  11   Contract N o: VA118-1 6-D-1009
  12   Task Order : VA11817F 10090006
  13   October 20 17
  14   Version 1. 0
  15   Revision H istory
  16   DateRevisi onDescript ionAuthor1 0/16/20171 .0Initial  VersionJos eph A. McG overnTable  of Conten ts
  17  
1
  18   Purpose
  19   2
  20   2
       
  21   Software S cope
  22   2
  23  
2.1
       
  24   Base and O ptional Ta sks
  25   3
  26  
2.2
       
  27   Developmen t Environm ent
  28   3
  29   3
       
  30   VistA Patc h Build Pr ocedure
  31   3
  32  
4
       
  33   Release Ma nagement
  34   3
       
       
       
  35   Purpose 
  36   Agile best  practices  will be i mplemented  for Clini cal Ancill ary Servic es (CAS) M PDU develo pment buil d planning  and execu tion iaw u sing the V eteran-Foc used Integ ration Pro cess (VIP)  and the V IP Release  process g uide.  Agi le develop ment will  plan each  build to b e three (3 ) months i n duration  and shall  be made u p (3) week  sprints.  The CAS MP DU Project  Manager,  Software M anager and  software  lead will  review and  determine  the epics  and user  stories th at should  become par t of the b uild with  the VA PM  and reques t the VA B usiness Ow ners’ conc urrence.
  37   The functi onal desig n will be  iaw with t he OneVA P harmacy Im plementati on SDD V3. 1.  The    Technical  approach w ill be iaw  the PSO_7 _Technical _Manual an d PSS_1_Te chnical_Ma nual with  CAS MPDU p roject rel ated updat es and thr ough requi rements an alysis, el aboration  and collab oration wi th custome r stakehol ders.
  38   Configurat ion Manage ment (CM),  source co de control , change/d efect mana gement, bu ild packag e and rele ase of sof tware; and  document  repository  will be m anaged in  the VA Jaz z Rational  tool set.    Configu ration sta tus and me tric repor ts will be  produced  as part of  the Agile  developme nt process  facilitat ed by the  tool set.   CM proces ses, pract ices and R ational to ol usage i s detailed  in the CA S MPDU Con figuration  Managemen t Plan.
  39   Software S cope  
  40   The CAS MP DU project  has been  scheduled  to deliver  3 builds  for Medica tion Permi ssions and  Dispensin g Upgrades  MPDU for  the contra ct base pe riod of pe rformance.  There is  follow Opt ional Task  1 for MPD U. 
  41   Base and O ptional Ta sks
  42   Base Tasks  for CAS M PDU:
  43   Build 1 -  Post-EPCS/ Process Rx  for Suppl y Enhancem ents.
  44   Build 2 -  Medication  Route Sel ection Enh ancement
  45   Build 3 -  Terminated  Provider  Validation  and OneVA  Efficienc ies, 
  46                                  L ocal Presc ription Fi lls Enhanc ements
  47   Developmen t Environm ent
  48   The AITC E DE EPIP  SERVER  and AITC  EDE Vipapp dev3 are b eing evalu ated and c onsidered  for develo pment envi ronments.    Currently  the CHYSHR  and DAYTS HR environ ments are  available  for prelim inary test ing once t he configu ration and  Patch lev els are ve rified. Th ese enviro nments in  conjunctio n with the  VA Enterp rise Ratio nal tools  for the CA S MPDU pro ject will  support Ag ile softwa re develop ment. Base  configura tion consi sts of the  following
  49   Eclipse v3 .2;
  50   Jazz Ratio nal v6.0.1 ;
  51   Red Hat En terprise L inux;
  52   VistA
  53   PSO*7*454,  PSO*7*475 , PSO*7*47 9; PSO*7*4 88, PSO*7* 497, PSS*1 *212
  54   Cache Data base
  55    v2014.1.3 .
  56   VistA Patc h Build Pr ocedure
  57    All Vista  builds ar e created  through th e Kernel I nstallatio n Distribu tion Syste m (KIDS) o ption in V istA.
  58   VistA buil d informat ion can be  obtained  through th e Vista Do cumentatio n Library  (VDL), Ker nel Develo per's Guid e.  Sectio n 15.2
  59   4
  60   Release Ma nagement
  61   A CAS MPDU  software  release is  a way of  identifyin g the exac t version  of all sou rce code a nd objects  that comp rise a mod ified appl ication at  a certain  point in  time. A CA S MPDU sof tware rele ase is the  distribut ion of the  baseline  or applica tion modif ications t o the base line. A re lease is c omprised o f one or m ore applic ation or d ocumentati on modific ations aut horized fo r the impl ementation /correctio n issued b y change r equests. D istributio n of a CAS  MPDU rele ase is del ivered wit h a VDD.