914. EPMO Open Source Coordination Office Redaction File Detail Report

Produced by Araxis Merge on 10/26/2017 10:45:03 PM Eastern Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.

914.1 Files compared

# Location File Last Modified
1 OSCIF_BMS_v2_iter 2_September_2017.zip\Test_Scripts 106449+-+Hovering+over+facility+name+on+VISN+page.docx Wed Oct 18 20:25:06 2017 UTC
2 OSCIF_BMS_v2_iter 2_September_2017.zip\Test_Scripts 106449+-+Hovering+over+facility+name+on+VISN+page.docx Thu Oct 26 23:36:28 2017 UTC

914.2 Comparison summary

Description Between
Files 1 and 2
Text Blocks Lines
Unchanged 2 186
Changed 1 2
Inserted 0 0
Removed 0 0

914.3 Comparison options

Whitespace
Character case Differences in character case are significant
Line endings Differences in line endings (CR and LF characters) are ignored
CR/LF characters Not shown in the comparison detail

914.4 Active regular expressions

No regular expressions were active.

914.5 Comparison detail

  1   106449: Ho vering ove r facility  name on V ISN page
  2  
  3   State:Draf t
  4   Originator :P II  (Mantech) Owner:Patu ri, Anurad ha (Mantec h) Type:Ma nual
  5   Test Data: Unassigned
  6  
  7   Descriptio n: US010.0 2.01
  8   Hovering t he cursor  over a fac ility name  on the VI SN page ca uses the d iversion s tatus of t he facilit y to be di splayed.
  9  
  10   Display Di version St atus on VI SN Page: T here shoul d be a "ho ver" capab ility that  is the sa me as for  the facili ty diversi on hover c apability.  This will  allow use r and mult iple level s to easil y identify  those war ds or area s that are  on divers ion to exp edite the  placement  of waiting  PT. (this  is the BM S applicat ion not an  user role )
  11  
  12   Preconditi on: User h as require d role to  access BMS .
  13  
  14   Summary
  15  
  16   Categories
  17   Function:  Unassigned  Test Phas e: Unassig ned
  18  
  19   Formal Rev iew
  20  
  21  
  22   General Co mments
  23  
  24   Manual Ste ps
  25  
  26  
  27   Step 1
  28   Execution  Step
  29  
  30   Descriptio n
  31   Login to t he BMS app lication.
  32  
  33   Expected R esults
  34   User Login  is succes sful. Comm ents
  35   Validates
  36  
  37   Attachment s
  38  
  39  
  40   Step 2
  41   Execution  Step
  42  
  43   Descriptio n
  44   Select the  BMS Home  hyperlink  from the f ooter sect ion at the  bottom of  the scree n
  45  
  46   Expected R esults
  47   Facility H ome page i s displaye d with Pat ients Pend ing Bed Pl acement: C urrent Com ments
  48   Validates
  49  
  50  
  51  
  52   Attachment s
  53  
  54  
  55   Step 3
  56   Execution  Step
  57  
  58   Descriptio n
  59   Click on t he Return  to VISN Ne twork link  on the to p left cor ner of the  page
  60  
  61   Expected R esults
  62   VISN PPBP  Page displ ayed Comme nts
  63   Validates
  64  
  65   Attachment s
  66  
  67  
  68   Step 4
  69   Execution  Step
  70  
  71   Descriptio n
  72   Verify an  arrow icon  is displa yed next t o facility  VISN Summ ary report
  73  
  74   Expected R esults
  75   VISN PPBP  page displ ays an ico n conrol t hat indica tes divers ion Commen ts
  76   Validates
  77  
  78   Attachment s
  79  
  80  
  81   Step 5
  82   Execution  Step
  83  
  84   Descriptio n Hover on  the icon
  85   Expected R esults
  86   Diversion  status of  the facili ty will be  displayed  Comments
  87   Validates
  88  
  89   Attachment s
  90  
  91   Associated  E-Signatu res
  92  
  93  
  94   SignedActi onSignerCo mmentAddit ional Info rmation