910. EPMO Open Source Coordination Office Redaction File Detail Report

Produced by Araxis Merge on 10/26/2017 10:45:00 PM Eastern Daylight Time. See www.araxis.com for information about Merge. This report uses XHTML and CSS2, and is best viewed with a modern standards-compliant browser. For optimum results when printing this report, use landscape orientation and enable printing of background images and colours in your browser.

910.1 Files compared

# Location File Last Modified
1 OSCIF_BMS_v2_iter 2_September_2017.zip\Test_Scripts 103072+-+Diversion+Report.docx Wed Oct 18 20:23:26 2017 UTC
2 OSCIF_BMS_v2_iter 2_September_2017.zip\Test_Scripts 103072+-+Diversion+Report.docx Thu Oct 26 23:39:39 2017 UTC

910.2 Comparison summary

Description Between
Files 1 and 2
Text Blocks Lines
Unchanged 2 366
Changed 1 2
Inserted 0 0
Removed 0 0

910.3 Comparison options

Whitespace
Character case Differences in character case are significant
Line endings Differences in line endings (CR and LF characters) are ignored
CR/LF characters Not shown in the comparison detail

910.4 Active regular expressions

No regular expressions were active.

910.5 Comparison detail

  1   103072: Di version Re port
  2  
  3   State:Draf t
  4   Originator : PII  (Technato my)Owner:U nassigned  Type:Manua l
  5   Test Data: Unassigned  Descripti on:
  6   Summary
  7  
  8   Categories
  9   Function:  Unassigned
  10   Test Phase : Develope r Test
  11  
  12   Formal Rev iew
  13  
  14  
  15   General Co mments
  16  
  17   Manual Ste ps
  18  
  19  
  20   Step 1
  21   Execution  Step
  22  
  23   Descriptio n
  24   Login to t he BMS sys tem.
  25  
  26   Expected R esults
  27   Your defau lt BMS Hom e page sho uld be dis played. Co mments
  28   Validates
  29  
  30   Attachment s
  31  
  32  
  33   Step 2
  34   Execution  Step
  35  
  36   Descriptio n
  37   Select BMS  Home foot er hyperli nk from th e National  home page
  38  
  39   Expected R esults
  40   Verify the  navigatio n is succe ssful Comm ents
  41   Validates
  42  
  43   Attachment s
  44  
  45  
  46   Step 3
  47   Execution  Step
  48  
  49  
  50  
  51   Descriptio n
  52   Select Rep ort button  in the mi ddle of th e facility  home page
  53  
  54   Expected R esults
  55   Verify the  Reports p age is dis played Com ments
  56   Validates  Attachment s
  57  
  58  
  59   Step 4
  60   Execution  Step
  61  
  62   Descriptio n
  63   Select Fac ility Dive rsion repo rt
  64  
  65   Expected R esults
  66   Verify the  diversion  report pa ge is disp layed Comm ents
  67   Validates
  68  
  69   Attachment s
  70  
  71  
  72   Step 5
  73   Execution  Step
  74  
  75   Descriptio n
  76   Select <va lue> from  the Type d ropdown li st,<All wa rd> from W ard dropdo wn list,<v alue> from  Treating  Speciality  from drop down
  77  
  78   Expected R esults
  79   Verify the  selected  values are  displayed  on the fi elds Comme nts
  80   Validates
  81  
  82   Attachment s
  83  
  84  
  85   Step 6
  86   Execution  Step
  87  
  88   Descriptio n
  89   Select Sta rt Date fr om the cal endar imag e or enter  date in t he date fi eld, Selec t End Date  from the  calendar i mage or en ter date i n the date  field
  90  
  91   Expected R esults
  92   Verify the  Date fiel ds are sel ected and  displayed  Comments
  93   Validates
  94  
  95   Attachment s
  96  
  97  
  98  
  99   Step 7
  100   Execution  Step
  101  
  102   Descriptio n
  103   Click View  Report bu tton.
  104  
  105   Expected R esults
  106   Verify the  Diversion  report is  displayed  with data . Comments
  107   Validates
  108  
  109   Attachment s
  110  
  111  
  112   Step 8
  113   Execution  Step
  114  
  115   Descriptio n
  116   Verify the  Start Dat e and End  Date colum ns.
  117  
  118   Expected R esults
  119   Seconds an d AM/PM sh ould not b e displaye d in the d ate format . Comments
  120   Validates
  121  
  122   Attachment s
  123  
  124  
  125   Step 9
  126   Execution  Step
  127  
  128   Descriptio n
  129   Select BMS  Home on t he footer  of the Nat ional home  page.
  130  
  131   Expected R esults
  132   Facility h ome page s hould be d isplayed.  Comments
  133   Validates
  134  
  135   Attachment s
  136  
  137  
  138   Step 10
  139   Execution  Step
  140  
  141   Descriptio n
  142   Select the  Return to  VISN Netw ork link o n the top  right side  of the pa ge.
  143  
  144   Expected R esults
  145   Vision PPB P page dis played.
  146  
  147   Comments
  148  
  149  
  150  
  151   Validates
  152  
  153   Attachment s
  154  
  155  
  156   Step 11
  157   Execution  Step
  158  
  159   Descriptio n
  160   Select the  View Dive rsion repo rt link on  the top r ight side  of the pag e.
  161  
  162   Expected R esults
  163   VISN Diver sion Repor t page dis played. Co mments
  164   Validates
  165  
  166   Attachment s
  167  
  168  
  169   Step 12
  170   Execution  Step
  171  
  172   Descriptio n
  173   Select the  <value> f or Type dr opdown, se lect the < value> for  Wards dro pdown, sel ct the <va lue> for S peciality  drop down,  select th e Start Da te and End  Date. The n select t he View Re port.
  174  
  175   Expected R esults
  176   VISN Diver sion Repor t displaye d with dat a. Comment s
  177   Validates
  178  
  179   Attachment s
  180  
  181   Associated  E-Signatu res
  182  
  183  
  184   SignedActi onSignerCo mmentAddit ional Info rmation